Council archive · source document
07/0738 - MCU - Industrial Business Type 1 & Industrial Business Type 2 - Mintgrove Pty Ltd [As Published] · 132007.738
Very large file (16.0 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Ecological Assessment, Bushland Drive Noosaville — 15th or: Potential Impact Performance standards — No less than the following Control measures ~ No less than the following a) Potential adverse Impact to the ecology of fauna within proposed open space areas amd contiguous vegetation remnants during construction and operational phases inctuding impacts ‘through noise, dust and light potluticn. 4a) ‘Compliance generally with performance standards listed in tem 2 above. 40) Compliance with environmental duty as defined under the ENVIRONMENTAL PROTECTION ACT 1994, PART 3 -ENVIRONMENTALLY RELEVANT ACTIVITIES, section 36. General environmental duty. 40) Compliance during construction phase with environmental guideline E1 Moise fram construction, renovation, maintenance and demottion Stes (Queenstand Department of Environment and Heritage) 49) No gross disruptions to site ecology or disruption of diurnal/nocturnal behaviour of wikltife. 4e} ‘Compliance generally with control measures listed in item 2 above. 4) During construction, generation of dust should be curtailed by irrigating dusty surfaces as needed. Irrigation is a temporary measure involving a fight application of water to moisten the soil surface. The process shoukl be repeated as necessary. 49) ‘Sail exposure should be eninimised where possible by temporary or permanent soil stabilisation controls, such as ‘seeding, mukhing, topsoiling, crushed stone or coarse gravel spreading. 4n) Maintaining existing ‘vegetation where possible on the site wid help contro! dust. When possible, work that Causes soil disturbance should be done in phases and should be accompanied by temporary stabilisation measures. These precautions will minimise the amount of soil that is disturbed at any one ime and therefore contol Gust. 4) uring habitation phase, cutdoor lighting should not be directed towards standing native vegetation. Lighting should, where possible, point ground-wards and not into tree canopies. Suppression will be most effective if site drainage systems are checked to ensure that the right amount of water is used. The develaper should nominate personnel responsible for containing dust generation. . ‘The same personnel should also be responsible for daity inspection of drainage systems during periods of irrigation, Monitoring Auditing and Reporting Corrective action 4) During construction, the | 4) Tt is the Geveloper’s 4n) Where fauna is deemed to developer should ensure that af contractors responsibility to identify personnd be at risk through unforseen construction and site personnel are aware of the extent responsible for control measures. ‘activities or impacts, those activities should and control measures for protection of 4m) No f re ng be stopped immediately and mitigation fauna. should for be bel mal ed ee ur eto Pieeretierhed developed and deployed before 4k) Irrigation for dust this potential impact w 40) uring construction phase, the developer will be required to undertake advanced dust control measures proposed site controt measures prove inadequate. PEDERSEN BIOLOGICAL AND ENVIRONMENTAL Pace 58 of 70 gt b ty
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/0738 - MCU - Industrial Business Type 1 & Industrial Business Type 2 - Mintgrove Pty Ltd [As Published]Related documentApplication case desk ↗
About this file
- File size
- 16.0 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.