Skip to the record
NoosaWatch™: The source of truth.

Original source · versioned page text

2022-11-14 GC Agenda - Item 3 - Attachment 1 - Draft Eastern Beaches Foreshore Management Plan

of 54

Page text shows just the words. Original shows the document exactly as it was published.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
         General Committee Agenda 14 November 2022
                               Attachment 1 to Item 3

Eastern Beaches Foreshore
    Management Plan
Log in to download the original file

2022-11-14 GC Agenda - Item 3 - Attachment 1 - Draft Eastern Beaches Foreshore Management Plan(PDF, 3MB).pdf · 2.7 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 53 sections

Section 2

© Noosa Council 2022
www.noosa.qld.gov.au
General Enquiries:
By telephone: (07) 5329 6500
By email: [email protected]
Fax: (07) 5329 6501
Street Address: 9 Pelican Street, TEWANTIN
Postal address: PO Box 141, TEWANTIN QLD 4565

Disclaimer
Information contained in this document is based on available information at the time of writing. All figures and
diagrams are indicative only and should be referred to as such. While the Noosa Council has exercised
reasonable care in preparing this document it does not warrant or represent that it is accurate or complete.
Council or its officers accept no responsibility for any loss occasioned to any person acting or refraining from
acting in reliance upon any material contained in this document.

Draft for council endorsement
Endorsed by Noosa Council [date to be inserted] or insert document date

Section 3

Acknowledgements
Noosa Council respectfully acknowledges the Traditional Custodians of the lands and waters of the
Noosa area, the Kabi Kabi (Gubbi Gubbi) people, and pays respect to their Elders, past, present,
and emerging.

Noosa Council expresses its gratitude for the contribution of the community members, groups and
organisations who participated in consultation and contributed to the development of the Eastern
Beaches Foreshore Management Plan.




Eastern Beaches Foreshore Management Plan – Draft (V4 26.9.22 – for public consultation)   Page 1

Section 4

Table of Contents
1.    Executive Summary ............................................................................................................. 3
2.    Introduction .......................................................................................................................... 5
3.    Management objectives....................................................................................................... 7
4.    Legislation and policy links ................................................................................................ 8
5.    Consultation ......................................................................................................................... 9
6.    Climate change .................................................................................................................. 11
7.    Ecology............................................................................................................................... 13
8.    Social values ...................................................................................................................... 19
9.    Partnerships ....................................................................................................................... 22
10.   Community education ....................................................................................................... 24
11.   Encroachments .................................................................................................................. 26
12.   Public access and recreation ............................................................................................ 29
13.   Incidents and disaster management ................................................................................ 35
14.   Coastal creeks and stormwater ........................................................................................ 39
15.   Foreshore tenure and gazettal .......................................................................................... 42
16.   Attachments ....................................................................................................................... 43




Eastern Beaches Foreshore Management Plan – Draft (V4 26.9.22 – for public consultation)                                             Page 2

Section 5

1. Executive Summary
Noosa’s natural amenity is ones of the greatest contributors to it’s liveability, and the Eastern
Beaches Foreshore Reserves are an iconic part of Noosa’s coastal landscapes. These foreshore
reserves are also central to Noosa’s coastal neighbourhoods - most of our seaside residents and
communities live alongside them. They are central to the Noosa resident and visitor experience,
with many people walking through the Eastern Beaches Foreshore Reserves to access Noosa’s
Beaches, enjoying the beautiful views the area has to offer.

Noosa’s dune foreshores are special environmental places too – many plants and animals only live
in coastal dunes, and they provide a critical link between the ocean and westward natural areas.
Some species, such as the endangered green turtle, rely on healthy dunes and beaches to
reproduce. As climate change continues, Noosa’s naturally vegetated foreshores and dunes will
play a critical role in our community’s resilience.

The uniqueness of Noosa’s Eastern Beaches Foreshore Reserves is well recognised by Noosa
people, past and present. For millennia Kabi Kabi (Gubbi Gubbi) people have lived and worked on
the Eastern Beaches, caring for Country through spiritual and environmental stewardship and
practises. Across the broader Noosa community, when asked what people valued most in Noosa
Shire, 77% of the 1655 respondents rated ‘Elements of the natural environment (natural features,
views, vegetation, topography, water, wildlife)’ as most important (Noosa Shire Liveability Survey,
Noosa Council 2021).

The Eastern Beaches Foreshore Management Plan describes the social and environmental values
of the public land that makes up Eastern Beaches Foreshore Reserves, threats to these values,
and the management actions needed to address them.


Scope of plan
The Eastern Beaches Foreshore Management Plan covers the public land managed by Council in
the Eastern Beaches coastal foreshore reserves and near–coastal bushland reserves shown in
Figure 1.


Purpose
The purpose of the Eastern Beaches Foreshore Management Plan (EBFMP) is to describe the
social and environmental values of the Eastern Beaches Foreshore Reserves and identify
management issues and actions to maintain these values in the future. The plan is to provide
overarching guidance for management decisions.

The development and subsequent implementation of the EBFMP is in response to clear community
desire for nature-based coastal hazards and climate change risk mitigation activities determined by
public consultation for the Noosa Coastal Hazards Adaptation Plan 2021.

Improving the ecosystem health of Noosa’s coastal environments is also identified as a
management priority in the Noosa Environment Strategy 2019 and Noosa Bushland Reserves
Strategic Management Plan 2021 – 2026.




Eastern Beaches Foreshore Management Plan – Draft (V4 26.9.22 – for public consultation)     Page 3

Section 6

Figure 1: Eastern Beaches Foreshore Reserves and near-coastal Bushland Reserves

Eastern Beaches Foreshore Management Plan – Draft (V4 26.9.22 – for public consultation)   Page 4

Section 7

2. Introduction
Noosa’s Eastern Beaches Foreshore Reserves
The Eastern Beaches Foreshore Reserves (EBFRs) are a series of naturally vegetated Council
managed coastal foreshore reserves and near–coastal bushland reserves that stretch over 11.5
kilometres, covering approximately 122 hectares along the open ocean beaches from Sunshine
Beach to Peregian Beach.

Foreshore and Bushland Reserves covered by the Plan include:

      Burgess Creek Bushland Reserve
      Castaways Beach Foreshore Reserve
      Marcus Beach Foreshore Reserve
      Peregian Beach Foreshore Reserve North (including Osprey Park)
      Peregian Beach Foreshore Reserve South
      Peregian Creek Reserve
      Sunrise Beach Foreshore Reserve
      Sunshine Beach Foreshore Reserve


Community and environmental values
The community value of the EBFRs includes iconic coastal landscapes and views and a leafy
backdrop to Noosa’s coastal neighbourhoods. Forty-one public beach accesses through the
Eastern Beaches Foreshore Reserves provide access to Noosa’s beaches, where visitors and
residents surf, fish, swim, walk, and exercise their pets, among a plethora of other informal and
formal activities. The EBFRs provides pedestrian access into coastal sections of the Noosa
National Park and parts of the north-south coastal path run in or along the western edge.

Environmentally, native vegetation and coastal landforms in the EBFRs provide natural buffering
from storms, waves and winds. This buffering function is important for building resilience to climate
change risks including coastal erosion, storm tide inundation and sea level rise. Several coastal
vegetation communities including coastal casuarina forest, wetlands, and open banksia and
eucalyptus forest grow, providing habitat for significant plant and animal species, such as green
turtle.

The EBFRs act as north-south wildlife corridors to larger coastal bushland patches in Noosa
National Park. While restricted by development and David Low Way, coastal creeks act as east-
west wildlife corridors from the foreshore to larger bushland patches west of David Low Way.

The following provides a snapshot of the values and management considerations for each of the
key sections of foreshore reserves from Sunshine to Peregian beaches.




Eastern Beaches Foreshore Management Plan – Draft (V4 26.9.22 – for public consultation)      Page 5

Section 8

                                                       Sunshine Beach Foreshore Reserve
                                                       The Bend, Sunshine Beach
                                                       14.4 hectares

                                                       Values
                                                       Six beach accesses
                                                       Flagged, patrolled swimming area
                                                       Sunshine Beach Surf Club
                                                       Pedestrian access to Noosa National Park
                                                       Immediately south of National Park
                                                       Of Concern Biodiversity Status regional
                                                       ecosystem (12.2.15)
                                                       High Value Regrowth (12.2.14)
                                                       High Ecological Value wetlands
                                                       Endangered or vulnerable wildlife
                                                       Special animals
                                                       Core koala habitat area
                                                       Essential habitat
                                                       Watercourse vegetation
                                                       Very High conservation significance riverine
                                                       wetlands

                                                       Management considerations
                                                       Connecting Noosa National Park to coastal
                                                       foreshore
                                                       High internal fragmentation and neighbour
                                                       impacts
                                                       Significant environmental weed infestations
                                                       Steep slopes and vegetation clearing
                                                       Runoff of roof water and stormwater




Figure 2: Sunshine Beach Foreshore Reserve




Eastern Beaches Foreshore Management Plan – Draft (V4 26.9.22 – for public consultation)      Page 6

Section 9

3. Management objectives
Eastern Beaches Foreshore Reserves Objectives

   1. Contribute to Noosa’s liveability and scenic amenity by managing the coastal landscapes in
      the Eastern Beaches Foreshore Reserves.

   2. Maintain adaptive, long-term, inclusive, safe and sustainable public recreational access to
      beaches, foreshores, waters, and foreshore bushland.

   3. Contribute to improved community and ecosystem climate change resilience, using nature-
      based methods and protecting the social and natural values of the Eastern Beaches
      Foreshore Reserves.

   4. Manage climate change impacts on the values of the Eastern Beaches Foreshore
      Reserves.

   5. Conserve the long-term health and stability of coastal landforms by protecting, maintaining,
      enhancing, and rehabilitating native vegetation.

   6. Contribute towards improved water quality in the Coral Sea, Laguna Bay, Noosa River,
      lakes, and coastal creeks.

   7. Identify and protect Indigenous and European cultural heritage sites and values in the
      Eastern Beaches Foreshore Reserves.

   8. Increase community and organisation understanding of the values and importance of
      foreshores.

   9. Develop and foster partnerships with the community, other parts of Council, State agencies
      and other land managers, and organisations to collaboratively manage Noosa’s foreshores.

   10. Work with Eastern Beaches Foreshore Reserves neighbours to achieve mutually beneficial
       amenity, biodiversity, and community safety outcomes.

   11. Protect and improve the biodiversity values of the Eastern Beaches Foreshore Reserves
       network, using best practice management techniques.

   12. Manage hazardous vegetation, bushfire, flooding, coastal erosion and pest species within
       the Eastern Beaches Foreshore Reserves according to Council’s policies, plans, risk
       appetite and legislative requirements.




Eastern Beaches Foreshore Management Plan – Draft (V4 26.9.22 – for public consultation)    Page 7

Section 10

4. Legislation and policy links
The EBFMP sits under the Noosa Environment Strategy 2019, Noosa Bushland Reserves
Strategic Management Plan 2021– 2026 and is informed by the Noosa Coastal Hazard Adaptation
Plan 2021. It complements and supports a large range of local, regional, state, national and
international plans, strategies, charters, agreements, and statutory obligations.

Attachment One identifies the relevant legislation and policy links to this plan and provides a
summary of the various strategies and implementation actions set out in the Environment Strategy
and the Coastal Hazards Adaptation Plan and their status as it relates to the EBFMP.




Eastern Beaches Foreshore Management Plan – Draft (V4 26.9.22 – for public consultation)   Page 8

Section 11

5. Consultation
Consultation with Noosa’s community is critical to the development and implementation of the
Plan. The draft Plan was developed after initial discussions and engagement with a number of
stakeholders and will be further developed with broader consultation based on this draft with
neighbours, Council staff, Noosa residents across the Shire, regional residents, community
organisations, businesses, visitors, state agencies and other land managers.


Scope of consultation
The EBFRs are recognised as having regional community importance. Eastern Beaches coastal
communities, coastal communities away from the Eastern Beaches, and hinterland communities
will all be invited to participate and offered local opportunities to contribute. Individuals and
organisations living in neighbouring Local Government Areas will also be invited to participate.
Input from further afield will be accepted and considered.

Noosa Council will provide a range of casual and formal consultation opportunities, including
surveys, written feedback and verbal feedback via pop-ups at community events, street meets,
community meetings and attendance at community meetings.


Previous engagement with Noosa’s community
Community consultation results from recently completed Noosa Council plans and surveys support
the development and implementation of the EBFMP. Community input during the development of
the Environment Strategy 2019 and Noosa Coastal Hazards Adaptation Plan 2021 and results
from the Noosa Liveability Study 2022 strongly support maintaining natural processes and using
nature-based solutions to mitigate and adapt to climate change and conserve and manage natural
areas and natural values. This includes protection and active on-ground management of local
beaches, dunes, habitats and coastal creeks to help build coastal resilience and improve
ecosystem health and adopting measures to avoid or minimise threats to these values.


Community stakeholders
Community stakeholders relevant to the development of this plan include:
   Bushland Care and other volunteers involved in the EBFRs
   Environment and Natural Resource Management organisations
   Neighbourhood residents and home owners
   Noosa residents
   Sunshine Coast and neighbouring Local Government Area residents
   Individuals and community organisations with interests in and near the EBFRs
   Businesses with interests in and near the EBFRs.


Stakeholder identification and initial consultation
Internal Council stakeholders that are involved in the management of the EBFRs were engaged to
solicit their views, involvement and relevant information. At the same time, staff met with
community stakeholders including Bushcare groups, environment groups and community groups
in and around the Eastern Beaches, for an initial briefing about the scope of the plan and the
management issues to be addressed. This stakeholder engagement continues.
Council staff have also attended working bees and meetings with community groups to talk about
how they felt about the EBFRs, what they liked about them, what they thought were issues and
what solutions or ideas they had. Notes taken at the meeting were collated and checked with the
group at the end.


Eastern Beaches Foreshore Management Plan – Draft (V4 26.9.22 – for public consultation)     Page 9

Section 12

Non-residential owners
Talking to the neighbours of our coastal reserves is complicated as there is a high proportion of
non-resident owners and properties in Eastern Beaches neighbourhoods, including short term let
properties, “family and friends” holiday houses, and resort style accommodation, some with
multiple owners and body corporates. Unaddressed delivery or local notices and advertisements
are unlikely to reach non-residential neighbours. Other people who regularly interact with the
coastal reserves are not always readily identifiable via ownership information such as letting
managers, and landscaping and maintenance companies and need to be considered through
further targeted engagement.



What we heard - initial consultation
The most common issue raised was encroachments – private garden extensions into public land,
private beach accesses and vegetation damage for views. The next most common issue raised
was weeds in the dunes, especially glory lily. The management of public beach accesses was also
a common theme, especially mowing and pruning around them, problem beach accesses, and
people spreading out across the dunes where the beach access fencing ended.

Volunteers raised concerns about the very low level of Council resources directed towards the
EBFRs outside of the Bushland Care program, and how much unpaid volunteer time goes into
project development, grant applications, project delivery and administration.




.




Eastern Beaches Foreshore Management Plan – Draft (V4 26.9.22 – for public consultation)   Page 10

Section 13

6. Climate change
Our foreshores are at the front line of climate change with- expected climate change impacts such
as sea level rise and increased storm intensity and frequency already being felt. Naturally,
vegetated foreshores play a vital role in sustaining our coasts and protecting foreshore
communities as sea levels rise and erosion areas expand landward.

The Noosa Coastal Hazards Adaptation Plan 2021 (CHAP) identifies and maps Noosa’s coastal
hazards risks, including for sea level rise, coastal erosion and storm tide inundation for three future
timestamps: 2040, 2070 and 2100. Virtually all of the land in the EBFRs is identified as erosion
prone, and the beach and some frontal dunes and coastal creeks are identified as vulnerable to
storm tide inundation during a major storm event.

As outlined in Section 4.4 of this Plan, community consultation for the Noosa CHAP strongly
identified nature-based solutions as the preferred response to climate change impacts. Many in the
community consider that a nature-based approach will best keep the natural look and feel and
safeguard the natural environment, while mitigating coastal hazard impacts. Building the health
and natural stability of the natural foreshores and vegetated dunes, and maintaining natural coastal
processes of erosion and accretion, are central to this approach.



How do vegetated dunes buffer our coasts to climate change impacts?
Climate change may increase both the occurrence and intensity of severe weather events and
cause sea level rise, increasing storm tide inundation, permanent inundation and beach erosion.
An important ecosystem service that naturally vegetated foreshores provide is the buffering of
beaches and dunes to help slow coastal erosion impacts1.

Healthy dune systems absorb wave and wind energy and can reduce flooding, wind, and storm
surge impacts. Dune vegetation helps hold dunes and foreshores together, making them more
resilient to wind and wave erosion. Dune vegetation slows the wind near the surface of the dune
and allows sand to drop out of the air. This reduces wind impacts on the dunes and nearby
settlements and recreational areas.

Healthy dunes systems are self-regenerating, and are able to rebuild more easily after severe
weather events, given enough time between storms and suitable material for rebuilding. Dunes in
good condition means that there are sources of seeds and runners nearby to recolonise disturbed
areas after storm events. Vegetation and natural debris act as an entrapment point, allowing the
lodgment of sand and seeds that contribute to the rebuilding and revegetation of frontal dunes after
disturbance2.

Sloping, healthy dunes help keep sand on our beaches. Waves run-out on the natural slope,
reducing the amount of energy available to lift and carry sand away. Steep dune faces left after
storms soon slump, quickly returning the back of the beach to a more natural slope. Dunes are a
source of sediment for off-shore bars that develop after storms that then act as a local source of
sediment to rebuild beaches and frontal dunes3.



1 Morris et al. (2021). The Australian Nature-Based Methods for Reducing Risk from Coastal Hazards. Earth

Systems and Climate Change Hub Report No. 26. NESP Earth Systems and Climate Change Hub, Australia.
2 De Battisti, D. (2021). The resilience of coastal ecosystems: A functional trait-based perspective. Journal of

Ecology. 109
3 Lawlor, P., Jackson, D.W.T. (2022). A Nature-Based Solution for Coastal Foredune Restoration: The Case

Study of Maghery, County Donegal, Ireland. In: Misiune, I., Depellegrin, D., Egarter Vigl, L. (eds) Human-
Nature Interactions. Springer, Cham.

Eastern Beaches Foreshore Management Plan – Draft (V4 26.9.22 – for public consultation)               Page 11

Section 14

Coastal hazards monitoring
Noosa Council has developed an integrated Coastal Monitoring Plan to map and monitor changes
in Noosa’s coastline and dunes. Data from this monitoring will inform further coastal hazard
monitoring and mapping and on-ground management decisions.
EBFMP Management actions
The following actions are identified for implementation:

 Action                                                 Responsible      Resources         Due date
                                                        party                              and status
 6.1. Manage the EBFRs as natural areas as part         Environment      Please see        2023-24
 of a nature-based approach to mitigating climate       al Services      MA 7.2            ongoing
 change and coastal hazards risks.                      Infrastructure
                                                        Services

 6.2. Incorporate coastal climate change                Council staff    Within            2022/23
 considerations into foreshore reserve planning         lead by          existing          ongoing
 and management.                                        Climate          operational
                                                        Change team      expenditure

 6.3. Monitor the long-term health and stability of     Climate          $80,000           2022/23
 coastal landforms and vegetation extent through        Change           coastal           ongoing
 the Coastal Monitoring Plan. Map the extent of         Team             monitoring
 EBFR vegetation every two years.                       Environment      annually
                                                        al Services
 6.4. Conduct post-weather event assessment of          Environment      Within            2023/24
 the EBFR                                               al Services      existing          ongoing
                                                        Infrastructure   operational
                                                        Services         expenditure

 6.5. Explore allocation of emergency contingent        Environment      $25,000           2023/24
 ecology funds and resources as part of annual          al Services      annually          ongoing
 budget process to more readily deploy bush
 regeneration and recovery activities after severe
 weather and disaster events
 6.6. Experiment with accelerated assisted natural      Environment      Please see        2023/24
 bush regeneration, vegetation rehabilitation and       al Services      MA 7.2            ongoing
 dune rebuilding, especially at the seaward edge.       Bushcare
                                                        groups


After-fire bush regeneration at Peregian Beach – a post extreme weather event rapid
response opportunity

After the September 2019 fires at Peregian Beach, an area on the western side of David Low Way
and backing onto national park was badly affected by fire. In places most of the canopy trees were
destroyed, increasing sunlight, and making the area vulnerable to roadside weed grasses. The
Peregian Beach Bushland Care group requested Council allocate a small budget to employ a
contractor to treat the weed grasses. The budget was eventually allocated but the weed grasses
had established and expanded, and the originally proposed budget was no longer adequate.

A post event rapid regeneration response budget would allow a flexible and fast response to a
range of extreme weather impacts, including fire, that would be cost-effective and help prevent
degradation.


Eastern Beaches Foreshore Management Plan – Draft (V4 26.9.22 – for public consultation)        Page 12

Section 15

7. Ecology
Stretching 11.5 kilometres along Noosa’s Eastern Beaches foreshore, and covering about 122
hectares, the EBFRs have a range of on-site and strategic ecological values.


Habitat
The EBFRs conserve wildlife habitat unique to open beach coasts. A range of land bird, shore
birds, reptiles, including sea turtles, and mammals rely on the interaction of land, beach and in-
shore ecosystems that occur in coastal dunes.


Significant species
Several species scheduled as Endangered, Vulnerable, or Near Threatened (E, V, NT) under the
Environmental Protection and Biodiversity Act (Cth) 1999 and/or Nature Conservation Act (QLD)
1992 occur or have suitable habitat in the EBFRs and may have species management and other
management documents that require consideration in the EBFR.

Scheduled species include;
      Caretta caretta — Loggerhead Turtle (V EPBACA, V NCA)
      Chelonia mydas – green turtle (V EPBACA, V NCA)
      Litoria olongburensis - wallum sedge frog (V EPBCA)
      Litoria freycineti – wallum Rocket Frog (V NCA)
      Crinia tinnula - wallum froglet) V NCA
      Calyptorhynchus lathami - glossy black-cockatoo -. (V NCA)
      Phasocolartus cinerus - Koala. (V SEQ bioregion NCA)

The mapped ecosystems are recognised as having the following potential significant plant species
values:

12.2.5. Potential habitat for NCA listed species: Acacia attenuata, Acacia baueri subsp. baueri,
Boronia rivularis, Durringtonia paludosa, Glycine argyrea, Macarthuria complanata, Maundia
triglochinoides, Persicaria elatior, Phaius australis. This ecosystem is also known to provide
suitable habitat for koalas (Phascolarctos cinereus).

12.2.7. Habitat for threatened plant species including Phaius australis, P. bernaysii and near
threatened species including Durringtonia paludosa. This ecosystem is also known to provide
suitable habitat for koalas (Phascolarctos cinereus).

12.2.13. Habitat for threatened plant species including Allocasuarina emuina, Acacia attenuata, A.
baueri subsp. baueri, Prasophyllum wallum and near threatened species including Macarthuria
complanata.

12.2.15. Potential habitat for NCA listed species: Durringtonia paludosa, Eleocharis difformis,
Maundia triglochinoides, Thelypteris confluens


Ecosystems
Most of Castaways Beach Foreshore Reserve, Marcus Beach Foreshore Reserve, Peregian
Beach Foreshore Reserve North, Peregian Beach Foreshore Reserve South and Peregian Creek
Bushland Reserve are mapped as remnant Regional Ecosystem (RE) 12. 2.14.


Eastern Beaches Foreshore Management Plan – Draft (V4 26.9.22 – for public consultation)      Page 13

Section 16

About two thirds of Sunrise Beach Foreshore Reserve and Sunshine Beach Foreshore Reserve
are mapped as High Value Regrowth (HVR) 12.2.14.

Detailed regional ecosystem mapping of the EBFRs was undertaken in 2021-22, with significant
expansion of mapped high value regrowth and some expansion of mapped RE. In 2021 mapped
HVR and RE was 87.3 ha, in 2022 126.9 ha was mapped. Small areas of four new REs, 12.2.5
(HVR), 12.2.7 (RE), 12.2.13(HVR), and 12.2.15(RE) were mapped, probably due to more detailed
mapping than developing regrowth.

Further information develop planting lists, rehabilitation targets and monitoring criteria: For short
RE descriptions please see Attachment Two: Regional Ecosystem short descriptions. For long
descriptions and technical information to, please see

https://apps.des.qld.gov.au/regional-
ecosystems/list/?landzone=&description=&class=&biodiversity=&submit=Search

https://www.qld.gov.au/environment/plants-animals/plants/ecosystems/technical-descriptions

https://www.qld.gov.au/environment/plants-animals/biodiversity/benchmarks


Hydrology
Some of the ecosystems and plant and animal species in the EBFRs are groundwater dependant –
they depend on specific groundwater conditions including ground water level, retention (e.g. due to
coffee rock or peat layers), pH, salinity, gradient pressure, and nutrient profile. Bores and other
extraction, drains, paths, earthworks and introduced materials can impact on the groundwater
profiles, as can climate change factors discussed below.



Environmental values, environmental management and climate change
Like other natural areas, the biodiversity and other environmental values of naturally vegetated
foreshores are being impacted by climate change. But foreshores are particularly vulnerable to
many impacts, like increasing inundation, severe weather effects and sea level rise, due to their
location. And common reserve characteristics of many urban dune areas (e.g., long, narrow,
closely surrounded by development, crossed by tracks) also increase the impacts of climate
change.

Wetlands
Coastal freshwater wetlands are likely to be affected by increased salt levels, and wetlands and
frontal dunes are likely to be increasingly affected by increasing periodic, tidal or permanent
inundation due to both raising sea levels and increasing severe weather. In many cases these
wetlands will try to move up the slope, to maintain suitable hydrology, and may be prevented by
tracks and other openings near ecosystem interfaces or by cleared, developed land around the
dunes.
Severe weather
Severe weather events, such as storms, drought, floods and bushfire, are increasing as climate
change progresses and often cause disturbance in natural areas. Increasing disturbance increases
the likelihood of ecological degradation and simplification, with reduced ecological values, reduced
ecosystem services and increased management. They occur alongside, and exacerbate,
neighbour, visitor and reserve characteristics degrading impacts. Active management of these
disturbances, including maintaining ecosystem health to reduce vulnerability and maximise
regeneration resources and rapid response after and during disturbances, will help reduce climate
change impacts on naturally vegetated foreshores.

Eastern Beaches Foreshore Management Plan – Draft (V4 26.9.22 – for public consultation)        Page 14

Section 17

Connectivity
Many urban dune networks are narrow and closely surrounded by urban development, much of
which almost entirely prevents the safe movement of native animals and plants through them.
Landscape connectivity to bushland away from the coast is often entirely prevented or very limited,
and internal connectivity is often compromised by clearings, development, paths, and fences.
Connectivity within a natural area, and to other natural areas, can be critical to allowing native
plants and animal species and individuals to adapt to climate change. Allowing the movement of
individual and populations of species allows them to seek the changing location of climatic (e.g.,
exposure, temperature, moisture) and environmental conditions (e.g., hydrology, pH, salinity,
ecosystem) they need to survive and maintain viable populations.

Breaks in internal connectivity will be identified in Council’s Bushland Operational Assessment
(condition) mapping, and remediation where possible planned in ecological restoration planning.
Potential external linkages to other bushland will be identified via desktop mapping and confirmed
during nearby condition mapping processes. Securing and remediation of these areas shall be
planned during nearby ecological restoration planning.

Changing ecosystems and plant and animal distributions
Climate change can affect or change the ecosystems, ecosystem characteristics and the location
and distribution of plants and animals. Observed and likely regional ecosystem and other shifts due
to climate change should be acknowledged and incorporated when setting ecological restoration
targets, developing planting lists and conducting other ecological management activities.

Sea Turtles
Loggerhead turtles (Caretta caretta)
Green turtles (Chelonia mydas)

Loggerhead turtles and green turtles nest and hatch on the Queensland coast at Noosa - both are
endangered at State, National and International levels. They are found around the globe, travelling
massive distances between their inshore seagrass and seaweed feeding sites and sandy beach
breeding grounds each year. Hatchlings and young turtles drift in the open ocean for years, eating
small animals in and near patches of floating seaweed. They start breeding between 10 and 30
years of age and can live up to 70-90 years. While they mostly live in the ocean, some land-based
threats can affect them, particularly during nesting and hatching (Nov-Feb).

Land based threats to turtles
Eroded foredunes: If the frontal dunes are too steep turtles won’t be able to climb them. They are
more likely to lay their eggs at the foot of the dunes, where they are more vulnerable to flooding,
getting washed away or crushed by vehicles.

Foxes, wild dogs and domestic dogs: They sniff out the eggs, dig them up and eat them.

Hard plastic, soft plastic, inflated and burst balloons look like food to turtles: They can block
and fill turtle stomachs and intestines, causing starvation, illness, and death. Biodegradable plastic
and balloons still cause problems as they don’t break down quickly or reliably enough, and often
break down into microplastics. Beach and ocean plastic and litter mitigation is discussed further
below .

Light: Baby turtles move towards the brightest light they can see, thinking it is the moon shining
over the ocean. They are easily confused by artificial lights on the land that penetrate through to
the beach, and may end up lost in the dunes, in drains or on roads. Nesting female turtles are
discouraged from laying on lighted beaches and may also be confused by light when returning to


Eastern Beaches Foreshore Management Plan – Draft (V4 26.9.22 – for public consultation)      Page 15

Section 18

the sea, although to a lesser degree than hatchlings. Light sources and mitigation are discussed
further below.

Climate change: Higher sand temperatures during incubation means that less males are being
hatched. Sea level rise and increasing storm occurrence and intensity means that nests are more
likely to be flooded or washed away. Frontal dunes are more likely to be eroded and steep,
preventing turtle access and making it more likely nests are laid where they could be flooded or
crushed by traffic. Climate change mitigation measures like sea walls or beach nourishment can
also cause problems by preventing access, burying nests or changing the consistency of the sand.


Invasive species
The Noosa Local Government Area Biosecurity Plan 2020 identifies several priority pest species
that directly apply to foreshore reserves, including glory lily, asparagus fern, Singapore daisy and
foxes. Invasive plant species are a significant threat to biodiversity, displacing native species,
simplifying species and structure biodiversity and reducing habitat values. Foxes are a particular
threat to coastal ground egg laying species, including vulnerable sea turtles and other reptiles, and
Eastern Ground Parrot.

Glory lily
Glory Lily (Gloriosa superba) is recognised as a serious ecological weed in Queensland and
Northern New-South Wales, especially in dunes and other sandy coastal areas. Forming dense
thickets and with twining leaf tips that allows it to climb over existing vegetation, Glory Lily
smothers and dominates vegetation, replacing structurally and species diverse coastal vegetation
with a monoculture of an introduced plant.

Glory lily also poses significant risks to coastal landforms and climate change resilience. Glory Lily
only grows above ground during the warmer months, leaving large areas of erosion prone sand
dunes largely bare for over half of the year. During above ground seasons fine, simple, above
ground stems and no fibrous or surface roots poses little resistance to wind and water erosion.

Large, persistent tubers and fragile underground stems mean that Glory Lily is hard to control, with
no mechanical control found effective, and an effective and sustainable chemical control method
for naturalised populations has not been confirmed.

Recent BOA condition mapping found that many areas in our EBFRs are dominated by glory lily,
with some areas found to have over 75% glory lily in the understory.

Coastal Fox Control Program
One of the primary threats to sea turtles are foxes and wild dogs digging up turtle nests and eating
the eggs. Council’s Pests and Land Protection officers conduct fox control in the Coastal Fox
Control Program as part of Council’s sea turtle conservation efforts. The Coastal Fox Control
Program is currently a joint project with Coolum and District Coastcare, Sunshine Coast Regional
Council, and Queensland Department of Environment and Science, and has been running for
about 6 years. Similar programs also run in other local government areas.

Volunteers from Coolum and District Coastcare and Council officers monitor fox predation on turtle
nests in Noosa and place dig prevention mesh on top of nests that are at particular risk of fox
predation. Many other coastal and near coastal native species benefit from fox and feral animal
control, including ground parrot, water mouse, small mammals, and shorebirds.




Eastern Beaches Foreshore Management Plan – Draft (V4 26.9.22 – for public consultation)       Page 16

Section 19

EBFMP Management actions
The following actions are identified for implementation:

 Action                                           Responsible         Resources              Due date
                                                  party                                      and status
 7.1. Update bushland condition mapping for       Environmental       Within existing        2022/23
 all EBFRs - only conduct BOA condition           Services            operational
 mapping in foreshore areas during summer                             expenditure
 when the glory lily is showing
 7.2. Update and implement ecological             Environmental       $225,200/annum 2023/24,
 restoration plan for all EBFRs                   Services            implementation ongoing

                                                                      Includes:
                                                                      Increased labour
                                                                      days for
                                                                      ecological
                                                                      restoration
                                                                      0.5 FTE
                                                                      Environment
                                                                      Technical Officer
                                                                      (new)
                                                                      Bushcare
                                                                      support remains
                                                                      unchanged
                                                                      (This would be an
                                                                      increase to the
                                                                      current budget which
                                                                      is $128,400/annum
                                                                      for 2022/23 which is
                                                                      including Coast
                                                                      Connect grant funds)


 7.3. Develop post event rapid response           Environmental       Please see MA          2023/24
 funding for ecological restoration               Services            6.5

 7.4. Incorporate climate change                  Environmental       Within existing        2022-24
 considerations in ecological management          Services            operational
 activities                                                           expenditure
 7.5. Monitor for any changes in the EBFRs        Environmental       Within existing        2022/24
 RE mapping and vegetation extent every           Services            operational
 five years by measuring the extent of                                expenditure
 mapped REs and high value regrowth and
 the extent of all vegetation using desktop
 mapping, Vegetation Management mapping
 and aerial photos
 7.6. Maintain and enhance internal               Environmental       Please see MA          2022-24
 connectivity and wildlife movement within        Services            7.2
 the foreshore reserve strip
 7.7. Minimise and actively rehabilitate          Environmental       Please see MA          2023-24
 cleared areas to reduce fragmentation and        Services            7.2
 edge effect                                      Infrastructure
                                                  Services
 7.8. Contribute to glory lily research and       Environmental       Please see MA          2023-24
 adopt best practise to managing this pest        Services            7.2
 species

Eastern Beaches Foreshore Management Plan – Draft (V4 26.9.22 – for public consultation)         Page 17

Section 20

                                                  Infrastructure
                                                  Services
 7.9. Identify, protect and restore external      Environmental       Please see MA        2023-24
 connectivity between the foreshore reserves      Services            7.2
 and landward natural areas                       Infrastructure
                                                  Services
 7.10. Minimise plastic elements in coastal       Environmental       Within existing      2023-24
 community infrastructure and management          Services            operational
 to reduce plastic moving into the coastal        Infrastructure      expenditure
 environment from community coastal               Services
 infrastructure
 7.11. Incorporate relevant aspects of            Environmental       Within existing      2023-24
 threatened species, scheduled species and        Services            operational
 other significant native species monitoring                          expenditure
 and management plans into planning and
 management activities
 7.12. Implement litter and plastic               Environmental       Within existing      2022 - 23
 minimisation measures with other Council         Services            operational
 branches, better support community litter        Infrastructure      expenditure
 and plastic minimisation efforts and collect     Services
 coastal litter information




Eastern Beaches Foreshore Management Plan – Draft (V4 26.9.22 – for public consultation)       Page 18

Section 21

8. Social values
Cultural Values
Ocean coasts are resource rich and important landmarks in the landscape, meaning that they are
often important to people for both practical and spiritual reasons. Many coastal dune networks
have significant First Nations cultural value as cultural landscapes, past and current resource use
and archaeological sites. They also often have resource or historical value for more recent
residents, visitors and communities.

During the millennia of Indigenous stewardship, it is likely that Kabi Kabi (Gubbi Gubbi) conducted
firestick farming, maintaining open grassy understories in Noosa’s eucalyptus forests that extended
into the area currently managed as the EBFRs. Kabi Kabi (Gubbi Gubbi) trapped and harvested
fish, shellfish, sea turtle and dugong in the coastal strip and would likely have periodically lived at
sites in and near the coastal strip.

In conjunction with this resource use and occupation, they undertook cultural and resource
stewardship practices and may maintain ceremonial and spiritual places in the Eastern Beaches
coastal strip 4. In an area surrounded by significant landmarks, and with several significant view
lines, the Eastern Beaches coastal strip supports Kabi Kabi (Gubbi Gubbi) cultural landscapes and
story places.

Before 1960 Noosa’s coastal areas were primarily used by non-Indigenous people for fishing and
holidaying in basic boarding houses and camps, Away from the sand dunes, the area was
dominated by low nutrient, acidic heathland, and wetlands unsuitable for western agriculture. The
Eastern Beaches urban areas were opened to residential development and more formalised
tourism in the 1960s, with the road from Coolum upgraded and urban blocks on sale in Peregian
Beach in 1960, and both road and blocks extended up to Sunshine Beach the following year.


EBFMP Management actions
The following actions are identified for implementation:

    Action                                          Responsible party    Resources         Due date
                                                                                           and status
    8.1. Invite the Kabi Kabi (Gubbi Gubbi) to      Environmental        Within            2022/23
    work in partnership with Council and other      Services             existing          and
    land managers to collaboratively manage the                          operational       ongoing
    EBFRs                                                                expenditure
    8.2. Incorporate cultural heritage values in    Environmental        Within            2022/23
    EBFRs management and interpretation             Services Staff       existing          and
                                                                         operational       ongoing
                                                                         expenditure




4
 Noosa Council, Sergiacomoi, Leddy & Fesl, Eve (2004), Indigenous Cultural Heritage Study of Noosa
Shire, Noosa: Noosa Shire Council,



Eastern Beaches Foreshore Management Plan – Draft (V4 26.9.22 – for public consultation)        Page 19

Section 22

Scenic and landscape amenity
Noosa’s natural scenic amenity and natural landscapes are a key contributor to Noosa’s liveability.
Coastal landscapes and bushland are an essential part of the local ‘look and feel’ and character.
Many of Noosa’s iconic views are from, through, of, or over, our naturally vegetated foreshores and
most of our seaside residents and communities live alongside them, with many people visiting
Noosa’s iconic beaches walking through the EBFRs.


Liveability
The natural elements of the EBFRs and nearby bushland are a significant part of Noosa’s
liveability and act as a backdrop to Noosa’s casual coastal ‘look and feel’. The value of natural
areas is well recognised by Noosa’s community, with ‘elements of natural environment (natural
features, views, vegetation, topography, water, wildlife etc.)’ identified as Noosa’s #1 Care Factor
in the recent Noosa Liveability survey. Protecting and managing natural ecosystems and elements
ranked at number 2.

The ability to see and interact with natural landscapes as part of our day-to-day routines
contributes to physiological and physical wellbeing. Even small patches of bush visually break the
pattern of residential developments and improve visual diversity, which also has psychological
benefits. Natural vegetation provides cooling breezes in summer and reduces urban heat by
shading and evapotranspiration.5


Economy & Visitor Experience
Our natural areas are the backbone of Noosa’s tourism industry and visual amenity is a significant
consideration when people are choosing where they go for their holidays. Scenic values and
access to beaches and bushland also influences where people want to live, which in turn
influences investment attraction and the local economy.


Viewpoints
Viewpoints are existing scenic viewing areas that provide a focal point for the public to enjoy the
surrounding landscape. Viewpoint types in Noosa’s Eastern Beaches include:

    •       Vista viewpoints: Broad landscape views, often incorporating water and coastal
            landscapes. Often a driver for visitor attraction to specific areas, and to Noosa
            generally.
    •       Near-beach viewpoints: Cleared viewing areas close to the back of the beach, often
            associated with public beach accesses, sometimes with community supplied furniture,
            and may act as an informal community hub.
    •       Surf condition viewpoints: Where people go to look at the ocean to assess conditions,
            including surfers, swimmers and kite surfers.
The values and how each of these different types of viewing points are used often overlap and
perhaps change over time.




5 Mahamane S, Wan N, Porter A, Hancock AS, Campbell J, Lyon TE, & Jordan KE. (2020) Natural

Categorization: Electrophysiological Responses to Viewing Natural Versus Built Environments. Frontiers of
Psychology, 11:990.

Eastern Beaches Foreshore Management Plan – Draft (V4 26.9.22 – for public consultation)           Page 20

Section 23

Noosa Design Principles
The Noosa Design Principles are used to guide good design that befits Noosa’s character, style
and climate. These principles emphasise the importance of protecting Noosa’s environment and
biodiversity by minimising the visual and environmental impact and dominance of the built
environment on the natural environment. They seek to enhance Noosa’s natural ‘look and feel’ and
sense of community by integrating the natural and built environment, viewing natural elements as
opportunities rather than obstacles, and involving the community.


EBFMP Management actions
The following actions are identified for implementation:

 Action                                         Responsible party       Resources          Due date
                                                                                           and status
 8.3. Implement Noosa Design Principles in      Environmental           Design grant       2022/23
 reserve management and community               Services                secured for        ongoing
 coastal infrastructure design, delivery, and   Infrastructure          beach
 maintenance                                    Services                accesses and
                                                                        infrastructure
 8.4. Identify existing vista, near beach and   Environmental           Subject to         2023/24
 surf condition view points, and assess for     Services                future budget
 visitor experience and environmental           Infrastructure
 sustainability. Where environmentally          Services
 sustainable, incorporate existing view
 points into infrastructure upgrades.

 8.5. Make beach accesses, entrances,           Environmental                              2023/24
 and other points of interface between          Services                Subject to
 foreshore reserves and visitors and            Infrastructure          future budget
 surrounding land uses welcoming,               Services
 attractive and accessible




Eastern Beaches Foreshore Management Plan – Draft (V4 26.9.22 – for public consultation)        Page 21

Section 24

9. Partnerships
Noosa Council works with a wide range of partners and stakeholders to manage the EBFRs.
Council works with dedicated volunteers, and various government, education and community
organisations to protect and enhance the natural, cultural and social values of the EBFRs.


Community Bushland Care Program
Community Bushland Care volunteers are very active across the Eastern Beaches, with seven
groups working at multiple sites in and next to the EBFRs. Eastern Beaches Bushland Care
Groups include Burgess Creek Bushland Care, Castaways Beach Bushland Care, Marcus Creek
Bushland Care, Noosa's Bush, Beach and Creek Care, South Peregian Beach Bushland Care,
North Peregian Bushland Care and Sunrise Beach Bushland Care. Some work twice a week,
others weekly, fortnightly or monthly. Some groups work on more than one site, and some
individuals work with multiple groups.

The Bushland Care groups weed and plant in their work areas, and some apply for grants,
administer large ecological restoration projects and contracts, run community events, and fund and
implement community infrastructure and community education projects. They are supported by
Community Bushland Care officers in Council’s Natural Areas Team.


Turtles
Turtle monitoring and response in Noosa is a combination of community volunteers and Council
officers. A team of volunteers from Coolum and Northshore Coastcare maps and monitors sea
turtle nests, protects them from foxes with mesh, relocates nests when they are endangered by
storms or tides and monitors turtle hatchings.

Coolum and Northshore Coastcare also lobby for better protection and management of turtle
nesting sites and conducts community education on how the community can help turtles. They
work closely with Sunshine Coast Council, Department of Environment and Science, and Council’s
Natural Areas Team. The Natural Areas team also monitors North Shore Beach for turtle activity
during the laying and hatching season and responds to North Shore turtle strandings.


Working with educational institutions
Noosa Council has a Memorandum of Understanding with University of Sunshine Coast, primarily
targeted towards collaborative research projects, and this can extend to paid internships and other
workplace learning opportunities. Similar arrangements and on ground projects could be
developed with other institutions such as TAFEs, secondary and primary schools. Current projects
include 4D beach mapping with University of Sunshine Coast as well as satellite-derived
bathymetry trials as part of Council’s Coastal Monitoring Plan.


Environmental and social research opportunities
Council hosts or participates in several research projects, including turtle monitoring with local
volunteer groups, wallum frog monitoring conducted by Mary River Catchment Coordinating
Committee, and algae monitoring.

Other partners in the management of the EBFRs include Noosa & District Landcare, Noosa
Integrated Catchment Association, Unitywater, Sunshine Coast Council and Queensland
Department of Environment and Science.


Eastern Beaches Foreshore Management Plan – Draft (V4 26.9.22 – for public consultation)       Page 22

Section 25

Coastal Connect
Coastal Connect is a collaborative revegetation and regeneration project run by three Bushland
Care Group coordinators along the Eastern Beaches.
The Coastal Connect project is a successful collaborative project that has achieved strong
outcomes. It requires significant volunteer time to develop projects, write and administer grants,
manage contractors and report on the grants. Alternative funding models, administrative support
from council and further resources are needed to ensure the work continues.

According to the Coastal Connect coordinators, project highlights include:

“….observing how our foreshore plantings at Seaview Creek have helped the dunes resist
significant weather events.”

“…..contractor teams enabling work to be undertaken in difficult to access or hard to reach spots
and use herbicides, where volunteers don't have the training nor expertise.”

“Creating a balance between visual amenity along public pathways and protecting/regenerating
ecologically important riparian areas.”



EBFMP Management activities
The following actions are identified for implementation:

 Action                                         Responsible party      Resources           Due date
                                                                                           and status
 9.1. Identify, review and document partner     Environmental          Within existing     2022/23
 projects and collaborations and make           Services               operational         and review
 information accessible for others to read                             expenditure         every three
 about and learn from.                                                                     years
 9.2. Identify gaps and potential partners,     Environmental          Subject to          2023/24
 actively seek and develop partnership          Services               future budget
 opportunities, and be open to new project
 and partner proposals that contribute to
 management vision and objectives.




Eastern Beaches Foreshore Management Plan – Draft (V4 26.9.22 – for public consultation)        Page 23

Section 26

10. Community education
Noosa’s EBFRs, beaches and adjacent waters have thousands of visitors each day, hundreds of
boundary sharing neighbours and thousands of nearby neighbours across the localities. How these
visitors and neighbours treat the foreshore reserves they live near or visit directly affects how the
reserves look and function. On-going community education and targeted communication between
Council, visitors and neighbours will contribute to the protection and enhancement of EBFRs. This
also includes embedding clear objectives for best practice reserve management into Council’s day
to day practices and approaches.


Neighbour communication
Neighbours include boundary sharing neighbours and neighbours within walking distance – where
the reserve is part of their work or home neighbourhood. Like all urban bushland reserves, how
neighbours interact with Noosa’s foreshore reserves is crucial to achieving positive long term social
and environmental outcomes.

Council’s initial consultation indicated that some areas may only contain roughly 20% long-term
rental or owner residents, with the remainder being short term lets or holiday homes. Unaddressed
delivery or local notices and advertisements are unlikely to reach non-residential neighbours. In
many cases the people who most interact with the public land neighbouring these properties work
for private rental managers, including landscaping and maintenance companies. Targeted
communication that includes hard to reach neighbours is important. Planned communication topics
include being a ‘good bushland neighbour’ and the ‘values of dunes and foreshores’.


Visitor communication
Noosa’s Eastern Beaches have very high numbers of visitors, and how these visitors treat the
reserve also influences how it functions and looks. Communicating with local visitors, (many who
may visit several times a week), visitors from the broader Sunshine Coast, and from further afield
require different delivery avenues and perhaps different materials. Delivery should be a mix of on-
reserve, online and external engagement and content.


Reserve and general community information
Information about the values of naturally vegetated foreshores and the EBFRs may help the
general community further appreciate the importance of natural foreshores for recreation,
conserving urban biodiversity and for helping to mitigate the impacts of climate change.




Eastern Beaches Foreshore Management Plan – Draft (V4 26.9.22 – for public consultation)     Page 24

Section 27

EBFMP Management Activities
The following actions are identified for implementation:

 Action                                                    Responsible   Resources         Due date
                                                           party                           and status
 10.1. Regularly deliver “be a good bushland               Environmental Within            2023/24
 neighbour” material to residential and non-               Services      existing          ongoing
 residential neighbours, long term renters, rental                       operational
 managers, and landscaping and maintenance                               expenditure
 companies.
 10.2. Provide general community information about         Environmental Within            2023/24
 the values of foreshores on-line, on-reserve and          Services      existing          ongoing
 nearby.                                                                 operational
                                                                         expenditure
 10.3. Provide visitor information material about          Environmental Within            2023/24
 EBFR recreation on-line, on-reserve and nearby.           Services      existing          ongoing
                                                                         operational
                                                                         expenditure
 10.4. Regularly deliver foreshore reserve                 Environmental Within            2023/24
 management planning and activity updates to               Services      existing          ongoing
 residential and non-residential neighbours.                             operational
                                                                         expenditure
 10.5. Provide neighbour, visitor, and general             Environmental Within            2023/24
 community information to short term let and resort        Services      existing          ongoing
 properties for guests about our beaches and                             operational
 reserves, how to look after them and stay safe.                         expenditure




Eastern Beaches Foreshore Management Plan – Draft (V4 26.9.22 – for public consultation)        Page 25

Section 28

11. Encroachments
Encroachments into foreshore reserves include damaging vegetation, filling, dumping rubbish, yard
extensions, private infrastructure and unauthorised planting. As the impact and area of
encroachments continues to expand in the EBFRs, their ability to contribute to nature-based
community climate change resilience under the Noosa Coastal Hazard Adaptation Plan 2021 and
improve coastal ecosystems under the Noosa Environment Strategy 2019 is compromised.


Education and communication
Ongoing communication between Council, visitors and neighbours can contribute to the protection
and enhancement of the EBFRs. Education and communication will be the first option in dealing
with neighbour impacts. There are many positive examples for others to follow where bushland
neighbours have created improvements for bushland vegetation, native wildlife and natural amenity
through their custodialship of the environment and volunteer bushcare efforts. Council wishes to
celebrate these success stories and provide ongoing support.


Local Law No.4
Activities in Council managed reserves relating to encroachments are regulated under Local Law
No.4 (Local Government Controlled Areas, Facilities, & Roads) 2015. But how these impacts are
dealt with by Council can be subjective or inconsistent, which can make it difficult for Council
officers to respond to them.

A number of community groups have expressed frustration about the lack of Council action in
relation to incursions in the bushland reserve. They are calling on Council to take a “proactive, zero
tolerance approach to illegal appropriation of public land, degradation of public land through
removal of native vegetation, the unauthorised planting on public land, and the dumping of rubbish
or landfill on public land”. They wish to see immediate action to seek rectification of
encroachments, irrespective of past practices, and take a firm stand on this issue.

This requires a consistent, transparent and well-resourced whole of Council response to
encroachments that better meets community expectations and protects the social and
environmental values of the EBFRs. This includes education and communication as a first option, a
range of non-regulatory responses, and a clear and methodical regulatory response.


Encroachment descriptions
Private beach accesses on public reserve land
Making or using private, informal, beach accesses clears native vegetation, causes erosion and
spreads weeds. They create weak spots for severe weather impacts and opens the foreshore to
increased salt, wind and storm damage. Over 90% of the neighbours sharing a boundary with the
EBFRs have a private beach access in public land.

Paths that cross the width of the foreshore reserve fragment the bush. Each one of these path
edges has accompanying ‘edge-effect- area, a strip of degraded bush, which usually has more
weeds and more sunlight, wind and salt intrusion, degrading the health and diversity of the
ecosystems. Having many more paths crossing the foreshore means that much more of the
retained bush is this degraded edge effect area, with reduced environmental values and increased
management costs.

Paths, especially in quieter areas, allow introduced predators to freely move across more of the
dune and beaches. This appears to particularly apply to foxes accessing the quieter, darker parts
of the beach that turtles are likely to use for nesting.

Eastern Beaches Foreshore Management Plan – Draft (V4 26.9.22 – for public consultation)      Page 26

Section 29

Private yard extensions into public land
As part of private yard extensions into public land, native vegetation is cleared and many are
planted with garden plants. Some yard extensions extend over 40 metres into the public bushland.
In some places, initial Council investigations indicate that yard extensions are very common - over
90% of the residential neighbours sharing a boundary with EBFRs have a private yard extension
into public land.

Replacing community bushland with a private garden is prohibited under Local Law No. 4, spreads
weeds and blocks firefighting access. Reducing the functional width of often already narrow
vegetated foreshores reduces their ability to manage extreme weather, improve water quality,
reduce sediment and erosion and act as wildlife corridors and habitat.

Vegetation damage for views
Vegetation damage for views includes pruning, cutting, breaking, pulling, poisoning and clearing
native vegetation – including trees, shrubs and ground covers - on the dune and foreshores for
views. It also affects foreshores without a shared residential boundary.

There are a few different types of clearing - all layers cleared to bare earth or mowed grass,
topping, killing or clearing the tallest vegetation where many of the largest trees are killed, or under
scrubbing, where the understory and midstory are removed.

Vegetation damage makes the remaining vegetation more vulnerable to weeds, wind and salt
damage, and degrades and fragments the bushland.

Council responses to tree safety issues in foreshore reserves near neighbour boundaries are
managed under the Noosa Council Tree Management on Public Land Policy, and under Local law
No.4 (Local Government Controlled Areas, Facilities, & Roads) 2015 elsewhere.

Private recreation areas
Private recreation areas are cleared areas away from the boundary, often on top of the dunes or
near the back of the beach and are generally accessible from private beach accesses and private
property rather than public accesses. Some of them are planted with garden plants, turfed or
furnished with tables and chairs. Many of the issues associated with vegetation damage and yard
extensions apply.

Garden plant escapees
Most environmental weeds start out as ornamental plants, and many garden plants easily spread
in bushland by seed, suckers and runners, or are deliberately planted in bushland.

Garden rubbish dumping
Dumping garden rubbish in community bushland can introduce weeds and replace diverse mixes
of native plants with infestations of just a few weeds. Rubbish dumps are an attractive ignition point
for arsonists, can cause a fire to flare and block emergency and management access.

Dogs and cats in dunes
Dogs in dunes can cause erosion on steep slopes and fragile front dunes and scare or attack
wildlife. Their droppings can discourage wildlife, spread disease and make working in the dunes
very unpleasant for our bush regenerators and Bushcare volunteers. Cats can scare and attack
wildlife and their droppings introduce and spread deadly diseases like toxoplasmosis to wildlife.




Eastern Beaches Foreshore Management Plan – Draft (V4 26.9.22 – for public consultation)        Page 27

Section 30

EBFMP Management actions
The following actions are identified for implementation:

 Action                                           Responsible         Resources      Due date
                                                  party                              and status
 11.1. Develop and resource an                    Environmental       $415,000/annum 2022/23
 encroachment policy for Council managed          Services                           ongoing
 natural areas that includes:                                         Includes:
     education and awareness as a first                              0.5 FTE
         measure including information and                            Environment
         signage to encourage good                                    Technical Officer
         custodianship of the bushland                                (new)
         reserve
     clear policy direction for Council to                           0.5 FTE Local
         take enforcement action for                                  Laws Officer
         deliberate encroachments including                           (new)
         steps to enable rectification and                            Site rehabilitation
         restoration of bushland areas
         illegally disturbed                                          Legal advice
     clear guidance about climate
         mitigation measures for private
         property
     fire management and rehabilitation
         works schedule for reserve-specific
         fire management and ecological
         recovery of disturbed areas.




Eastern Beaches Foreshore Management Plan – Draft (V4 26.9.22 – for public consultation)    Page 28

Section 31

12. Public access and recreation
Noosa’s coastal bushland, beaches and waters are some of the most valued in the world, and
thousands of residents and visitors are drawn to them every year. Dunes and foreshores are where
we access some of our most precious and in-demand recreation places. Maintaining long-term and
sustainable public access to these highly desirable locations in the face of coastal erosion, climate
change impacts and high visitor numbers is a challenge that requires careful planning.


Constructed recreational access and opportunities
Most EBFR recreational access is on the 41 beach accesses to Noosa’s Eastern Beaches.
Thousands of reserve visitors walk along the beach accesses through the EBFR each week. Some
interpretative signs about coastal plants, animals, ecosystems and landform, mostly installed by
community partners, is alongside some of the beach accesses. Some parts of the north-south
coastal bike and pedestrian path run in or near the western boundary of the EBFRs.


Commercial and organised recreational access and opportunities
On the beaches or in nearby open space many organised community or commercial recreational
opportunities are offered, some regulated under a permit or lease for commercial or community
activities or temporary events permits. These include markets, concerts, surf lessons and board
hire, other watercraft hire and lessons, weddings and other private events, boot camps and
personal trainers, yoga and wellness classes and events, and sand sculpting workshops. Council
seeks to ensure that the adjoining foreshore reserves and the leases and permit activities are
managed in a way that compliments each other.


Universal access
Coastal natural areas, dunes, beaches and waters are desirable for everyone to access but also
present particular challenges to universal access – they are highly exposed to the elements and
salts and are ever-changing, sometimes very rapidly. Sloped natural landforms, soft sand surfaces
and natural vegetation can be highly unfavourable for some forms of universal access. These
challenges present opportunities to consider innovative access designs and materials and events.

A mobility mat – Mobi-Mat - has been installed on nearby Noosa Main Beach on Hastings Street,
through a collaborative project between Surf Life Saving Queensland, Noosa Surf Club, Tewantin-
Noosa Lions Club, Noosa MP Sandy Bolton, and Council. It is a firm, recycled plastic mat that
extends from the beach access ramp in front of the Noosa Surf Life Club, across the beach and to
the water. It not only provides universal access to the down to the water, it also provides access to
the sand for sun bathing, making sand castles and other beach activities. This is a permanent
installation, only removed for king tides and bad storms. Considerations in locating the mat in this
location included: the very high visitor attendance, the flagged swimming area, and a flat, stable
beach that enables permanent installation.


Swimming and surf lifesaving
With over eleven kilometers of beaches, ocean swimming and paddling is a drawcard for locals
and visitors. Three flagged bathing areas in the EBFR, at Sunshine Beach, Sunrise Beach and
Peregian Beach, are patrolled with a mix of paid Surf Life Saving Queensland lifeguards and
volunteer lifesavers from Surf Life Saving Clubs at Noosa Heads, Sunshine Beach and Peregian
Beach. People are encouraged to swim here between the flags and is managed to be significantly
safer than the general beach or coastal environment. Surfboards, canoes, kayaks, fishing

Eastern Beaches Foreshore Management Plan – Draft (V4 26.9.22 – for public consultation)      Page 29

Section 32

equipment, and any surf equipment that could be dangerous or be likely to injure someone is
prohibited, along with the equipment and activities prohibited in the broader bathing reserve below.
Dogs are prohibited in bathing areas.

These bathing areas sit in larger bathing reserves, which allows for equipment and conduct to be
regulated to help provide safer swimming conditions, at a lesser extent than the highly managed
bathing areas. Motorised or wind powered equipment, spear fishing, and surf equipment that may
injure or endanger others is prohibited. The two bathing reserves at Sunshine and Sunrise Beach
are located between beach accesses 29 and 38, and the third is at Peregian Beach between
beach accesses 47 and 59.

There are surf clubs and towers at Sunshine Beach and Peregian Beach, and lifeguards and life
savers regularly patrol some beaches outside of the flagged areas. The surf lifesaving club
buildings and associated beach accesses, towers, accesses, and patrol areas are neighbours to
the EBFR. Council aims to ensure the adjoining foreshore reserves and Surf Life Saving Club
facilities are managed in a way that complement each other.


Surfing
Surfing is one of Noosa’s most notable forms of recreation. The beach break at North Sunshine
Beach is at the southern end of the Noosa World Surfing Reserve, and other well renown surf
breaks are highly popular along the length of the Eastern Beaches. Surfing is a major contributor
to livability and the Noosa “culture” for many residents, and surfing opportunities and events are a
major drawcard for regional, interstate and international visitors.

Surf breaks and access for surfing is one of the drivers for the current location of many of our
beach accesses and should be considered if new or moved beach accesses are proposed.
Viewing water conditions can be a reason for people to go off public paths, which may cause
environmental damage and pose a risk to visitors. Incorporating desired water condition view line
considerations when locating and designing viewing areas, platforms and other coastal community
infrastructure will help maintain and enhance these values.


Beach walking
Beach walking for exercise, meditation and socialising are important daily activities for many
Noosa residents and visitors. People walk regular and occasional routes along beaches and
nearby walkways, and into adjoining national parks.


Dog walking
Many people walk and exercise their dogs on the beach and on nearby walkways. EBFR off leash
areas are at Sunshine Beach, north from beach access 27 to the national park boundary, and
Castaways and Marcus Beach, between beach accesses 38 and 47. Other beach areas are open
to on-leash dogs, except the three designated bathing areas.

Initial consultation highlighted how important being able to walk with your dog on most of the beach
is very important to many people. Some raised concerns about access to some of the off-leash
areas. Others raised issues about pet waste being a significant contributor of urban water nitrogen
and expressed concern about off leash dogs outside of off leash areas for environmental, amenity
and public safety reasons and said that they stayed away from beaches because they were
worried about being knocked down by off leash dogs.

Feedback about dogs and dog related infrastructure stated that better access and signage about
where dogs or off leash dogs are not allowed will both help prevent dog owners being fined and
reduce out of area off leash concerns.

Eastern Beaches Foreshore Management Plan – Draft (V4 26.9.22 – for public consultation)     Page 30

Section 33

Beach fishing
Beach fishing is popular, especially around the coastal creeks mouths, targeting tailor, mulloway,
bream, flathead, whiting and dart. Discarded fishing gear may pose a risk to other beach users and to
wildlife.


Coastal community infrastructure and climate change
Community infrastructure on foreshores is especially vulnerable to severe weather events and
rising sea levels, and impacts on community infrastructure may increase as climate change
continues. Climate change requires coastal community infrastructure materials, design and
management to be increasingly durable and responsive to both sudden major weather events and
gradual long-term changes such as sea level rise and gradual shoreline recession. Responses
may include relocating important recreational and infrastructure assets outside the projected high
risk coastal erosion area or where they cannot be feasibly relocated, accommodating the risks by
adapting the design of these assets to be more resilient before and after a major erosion event.
The Coastal Hazards Adaptation Plan sets out the preferred adaptation outcome for each locality
as listed in Section 4. Legislation and legislative instruments.

Council has already secured funding to develop design standards for beach accesses, viewing
platforms, signage fencing, seat and other community coastal infrastructure, in line with Noosa
Design Principles. Design standard elements include classification, location, use, construction and
maintenance, environmental impacts and defects.

Beach accesses
There are 41 public beach accesses that cross the EBFRs, ranging from short, sandy tracks on
fairly flat ground, to highly engineered sets of open stairs down very steep slopes. Some have
largely unmodified natural surfaces, while others are concreted for part of their length and many
have short lengths of chained planking or boardwalk at their seaward end. Many have stairs at
some point along their length and most are fenced with open post and rail fences and are closely
surrounded by native vegetation.

Some beach accesses tie in with tunnels and accesses under the David Low Way and other roads,
or from bicycle paths, pedestrian paths or open space parks. Many directly link the foreshore
reserves and beaches from secondary or main roads, some with dedicated off_road carparks.
All beach accesses have been in place for at least thirty years, although many have been
upgraded at some point during that time.


Condition and functionality
Most beach accesses are in good condition for most of their length. However, many are now not
long enough - the dunes are rebuilding after the 2017 storms, and the ocean end of many now
extend well past the ends of the modified surfaces and fences. Changes to beach accesses,
especially at the seaward end, can happen quickly too, after storms and floods requiring designs
that provide for dune building and accretion.

Council’s Infrastructure Services Department has detailed data about beach access and
associated community infrastructure, including their location, construction and condition. The
Environmental Services branch is starting to collect information about how they sit in the landscape
and work with the environment. Further information from our community as part of the community
consultation for this EBFMP will also be beneficial including information on about how beach
accesses are used, what people like about them, and any concerns they have. .


Eastern Beaches Foreshore Management Plan – Draft (V4 26.9.22 – for public consultation)        Page 31

Section 34

Location
The current locations of most of the Eastern Beaches access points have been almost incidental to
other processes. For instance, stormwater easements and parks are often gazetted at the lowest
points as the area is developed to allow for drainage and stormwater discharge into nearby creeks
and natural areas. Beach accesses have later been constructed here as they are where roads are
connected to foreshore reserves. Beach accesses usually avoid permanently wet areas such as
wetlands. This has meant that many beach accesses are in low lying areas where stormwater and
standing water present design challenges.

The location and distance between beach accesses varies widely – in some areas the accesses
are often only 50 metres apart, in others, where access is restricted by the David Low Way, coastal
creeks and other complications and gated communities, the accesses are very widely separated.
Some residential areas, particularly new developments, and some tourist hotspots may not be
served well by current pedestrian accessible beach accesses. Some have been placed where the
construction of the David Low Way or other community infrastructure best allowed. Other accesses
have been built where people were already informally accessing the beach – including at a popular
surf break, or where a beautiful view attracted visitors.

Some beach access locations cause problems - for instance a highly constructed beach access at
Marcus Beach is regularly cut off from the beach by the natural movement of a coastal creek. At
Burgess Creek where beach accesses are widely located to avoid a moving creek mouth and
steep slopes, residents are walking down a steep slope near the mouth of the creek and crossing
the creek to the beach. This foot traffic down a steep slope, coupled with high peak outflows from
the creek, is contributing coastal erosion and needs careful planning and design of nature-based
erosion management solutions including dune restoration and fencing.


Only a few beach accesses benefit from being readily observable or directly accessible from main
roads, which may mean these beach accesses also have pressures from heavy visitor and tourist
usage.


Signs
Each beach access is required to have a standard beach access sign at each end, with the beach
access number and basic beach safety information and contacts.

 Many beach accesses have other information and interpretation signs at the entrances or nearby .
These have often been installed as part of a community or Council project. Sign design and
location standards will be included in the   new beach access and community coastal
infrastructure design standards.


Beach access and community coastal infrastructure design standards:
There are currently no criteria for public beach accesses or many other coastal community
infrastructure components. Developing design standards for beach accesses, beach access trail
heads and coastal community infrastructure is needed to identify and direct beach access
construction and management that allows safe and sustainable public access to the beach and
water while protecting the environment it sits in.


Beach Access Plan
An over-arching plan for beach accesses and other community coastal infrastructure could help
define the best intervals and location that allows safe and sustainable public access with an
acceptable walking distance. An agreed inspection and upgrade schedule would help maintain the

Eastern Beaches Foreshore Management Plan – Draft (V4 26.9.22 – for public consultation)   Page 32

Section 35

beach accesses in a safe and environmentally sustainable condition and allow Council to respond
to the changeable environment of the dunes and beach, including the slow changes of gradual
dune building, and sudden changes like the erosion after Cyclone Debbie in 2017.


Beach access and community infrastructure management
Beach access management involves several branches of Council. Track, handrail and community
infrastructure construction, management and upgrade is managed by Civil and Asset Operations
and Infrastructure Planning, Design and Delivery in Infrastructure Services. Grass and
groundcover maintenance alongside the access is managed by Parks in Infrastructure Services.
over hanging trees, surrounding bushland maintenance and coordination of Bushcare volunteers
(who often work from and on beach accesses) are managed by Natural Areas in Environmental
Services.


Emergency access
During recent natural disasters it became clear Council could benefit from improved emergency
access to Noosa’s beaches. Most beach accesses are inaccessible to even small All-Terrain
Vehicles. Access for light vehicles, large machinery or large trucks is very problematic. Even where
the accesses would otherwise be suitable, community infrastructure in nearby open spaces, road
reserves, or along the beach accesses complicate or entirely prevents their use by large or long
vehicles and machinery. Restricted access means more machinery movements along longer
lengths of beaches, with accompanying budget, environmental and beach user impacts. Identifying
a few simple, short beach accesses that could be modified to allow large machinery and small
vehicle access could help resolve this issue. Consideration of accompanying budget, as well as
environmental and beach user impacts is needed to better understand the costs and benefits of
improved emergency beach access.


EBFMP Management actions
The following actions are identified for implementation:

 Action                                           Responsible party        Resources       Due date
                                                                                           and status
 12.1. Ensure equitable access to a range of      Environmental            Within
 recreational and natural areas experiences,      Services                 existing    Ongoing
 distributed across the EBFR                      Infrastructure           operational
                                                  Services                 expenditure
                                                  Community Services
 12.2. Conduct a review of existing beach         Environmental            Design          2022/23
 accesses, viewing platforms, signage,            Services                 grant
 fencing, seat and other community coastal        Infrastructure           secured
 infrastructure, in line with Noosa Design        Services
 Principles

 Review elements include; classification,
 location, use, construction and
 maintenance, environmental impacts and
 defects, over use and new or moved beach
 accesses if needed

 12.3 Develop design standards for beach          Infrastructure           Subject to      2023/24
 accesses and coastal community                   Services                 future          ongoing
 infrastructure components                                                 budgets



Eastern Beaches Foreshore Management Plan – Draft (V4 26.9.22 – for public consultation)        Page 33

Section 36

 12.3. Develop an overarching beach access        Environmental            Design          2022/23
 plan and maintenance plan for beach              Services                 grant
 accesses and coastal community                   Infrastructure           secured
 infrastructure components                        Services

 12.4. Review key beach accesses to enable        Environmental            Design          2023/24
 improved access by large machinery and           Services                 grant
 trucks for disaster response. Review and         Infrastructure           secured
 simplify nearby park, beach access and           Services
 street infrastructure to ensure their location   Emergency Services
 doesn’t prevent the use of the key beach         Surf Lifesaving Clubs
 access by large machinery and truck for          Surf lifesaving Qld
 disaster response.

 12.5. Work with recreation and public            Environmental            Within      2022/23
 access partners and neighbours to ensure         Services                 existing    ongoing
 collaborative, multidisciplinary management      Infrastructure           operational
 of beach accesses and coastal community          Services                 expenditure
 infrastructure                                   Bushcare volunteers
                                                  Surf Lifesaving Clubs
                                                  Surf lifesaving Qld
 12.6. Implement the preferred adaptation         Environmental            Within      2022/23
 responses for the different localities           Services                 existing    ongoing
 described in the Noosa Coastal Hazard            Infrastructure           operational
 Adaptation Plan 2022 in reserve                  Services                 expenditure
 management and community coastal
 infrastructure design, delivery and
 maintenance.

 12.7. Provide visitor information material       Environmental            Within      2023/24
 about EBFR recreation, including universal       Services                 existing    ongoing
 access, on-line, on-reserve and nearby                                    operational
                                                                           expenditure




Eastern Beaches Foreshore Management Plan – Draft (V4 26.9.22 – for public consultation)       Page 34

Section 37

13. Incidents and disaster management
With thousands of visitors and neighbors, and foreshores being particularly vulnerable to weather
events, EBFR incident and disaster management is important.


Bushfire risk
Fire risk in Council reserves is extensively discussed in the Noosa Bushland Reserve Strategic
Fire Management Plan 2021 – 2026 and Noosa Bushland Reserves Strategic Management Plan
2021 – 2026, and any fire risk management activities here should be read in conjunction with those
documents. The fire management plan identified the fire risk that the bushland in the EBFR poses
to adjacent buildings as High to Medium.

Sustained periods of extreme fire weather in Queensland occurred in 2019 and 2020. It is likely
that periods of severe and extreme fire weather are going to be more common and more intense
as climate change progresses.


Recent fire history
During extreme fire weather in September 2019, a fire was started in Peregian Beach South
Foreshore Reserve by flying embers from Emu Mountain or Peregian Springs. About two hectares
of the reserve was burned, one house was lost, and others were damaged.

Contributing factors included continuous vegetation and fuel between bush and some houses,
older houses that predate current bushfire area building codes and very restricted and risky access
for fire fighters.

Fire management and firefighting access
Fire management and firefighting access across much of the EBFRs creates various challenges.
Fire fighter access to the 2019 fires was very restricted and risky, and meant fire fighters needed to
often walk down unknown, narrow, one-way accesses alongside private houses to access the fire,
making it dangerous for fire fighters. In some locations there is continuous vegetation and fuel
between the bush and houses. Several residences and outbuildings have zero or near zero
boundary clearance to the to the foreshore reserves.


Fire Access Trails and Fuel Reduction Zones
The Noosa Bushland Reserve Strategic Fire Management Plan 2021 – 2026, requires double
ended, through fire access trail widths next to residential development, buildings and facilities of up
to four metres, and up to three meters where the bushland strip is narrow. All vegetation, except for
closely mowed ground cover, needs to be removed. Outside of this area the reserve would be
managed for conservation and landform stability values.

This is highly desirable from a fire risk management point of view, would significantly improve fire
fighter safety and is the preferred option. Where a through access is not yet established, a buffer
with the same dimensions and characteristics should be established.

Where fire access trails are not possible (due to the dimension of the bushland reserve, slope, or
sensitive environmental values) the Noosa Bushland Reserve Strategic Fire Management Plan
2021 – 2026 identifies a Fuel Reduction Zone (FRZ) of up to ten metres as a suitable Interface
Zone treatment for risk management. A fuel reduction zone reduces fuel by reducing the middle
and connecting vegetation layers while keeping the ground cover and canopy trees. Outside of this
area the reserve would be managed for conservation and landform stability values.

Eastern Beaches Foreshore Management Plan – Draft (V4 26.9.22 – for public consultation)       Page 35

Section 38

Marine debris events
As shipping up the east coast and the region’s urbanisation increases, the amount of marine debris
on our beaches increases. And as climate change increases the intensity and occurrence of
extreme weather, floods and storms have the potential to deposit more marine debris after events.
Debris can include parts, rubbish and fishing gear off ships and fishing vessels; litter and rubbish
via stormwater; general rubbish, building materials; outside furniture; and community infrastructure
from low-lying parks after floods. The Brisbane February 2022 floods deposited 18 pontoons from
Brisbane River on Noosa’s beaches (see the Highlight Box overleaf).

This debris is unsightly and poses a safety risk to beach users and wildlife, particularly when it is
obscured by storm foam. There is also a strong and growing body of evidence on the negative
environmental impact of marine debris through ingestion, entanglement, habitat damage and the
spread of alien and invasive species6.

Day to day debris is removed from the beach by community members or Council workers and
placed near or in the bins at the top of the beach access or removed to the tip by rubbish
contractors or Council workers. After storms, debris is removed by hand or machine, and taken to
the tip by Council workers or deposited in beach access bins or home bins by community
members.

Natural marine debris, natural wood, seagrass, seaweed, pumice-stone, vegetation and similar,
can also be deposited in large amounts during extreme weather. Natural debris can act as a useful
entrapment point, allowing the lodgment of sand and seeds that contribute to the rebuilding and
revegetation of frontal dunes after disturbance. They can also be significant habitat features,
especially during the early phase of dune rebuilding where little other cover occurs. Unless the
natural debris is posing a significant safety risk it shall be left where it is, to redistribute and
decompose naturally.


Marine oil spills
With increased international and domestic shipping passing along the shipping route along our
coast and increased extreme weather due to climate change, the risk of a larger marine oil spill
from a ship is also increasing. This was further increased during the Coronavirus pandemic by
reduced ship maintenance and reduced enforcement, and now with potential monitoring and
enforcement labour shortages. Oil spills from ships or from land based activities may also occur in
Noosa River.

Animals can be poisoned or burned by the chemicals in the oil – marine animals that come to the
surface to breathe or live on the surface or in intertidal area are particularly vulnerable. Oil prevents
birds from flying or floating, and most oiled seabirds drown out at sea. Oil also prevents fur or
feathers keeping the animal warm, and they can rapidly freeze to death in cold water. Plants and
animals that live on rocks, mudflats, in the sand or on the bottom of the sea can be poisoned or
smothered. The effects of oil spills can be longstanding even on wildlife that survives, reproduction
success and lifespans can be reduced, the populations of threatened species affected, and
habitats degraded.

Economies and communities can also be affected. Fisheries can be affected by a reduction in
commercial species populations, contamination, or public perception about food safety. Tourism,
hospitality and accommodation industries, particularly where focused on coastal access and


6 National Oceanic and Atmospheric Agency (2022). “Why is Marine Debris a Problem?” Available Online:

https://marinedebris.noaa.gov/discover-marine-debris/why-marine-debris-problem

Eastern Beaches Foreshore Management Plan – Draft (V4 26.9.22 – for public consultation)        Page 36

Section 39

amenity and fresh, local food, can also be affected. Human health effects have been observed in
cleanup personnel and communities that live or work in areas affected by large oil spills.

Oil spills have happened near Noosa’s Eastern Beaches before. During Cyclone Hamish in March
2009, 230 tonnes of fuel oil, 30 tonnes of other fuel and 620 tonnes of ammonium nitrate (the latter
mostly in containers) spilled into the sea in the Sunshine Coast, affecting the coast from Marcoola
Beach (about 18 km south of Peregian Beach) down to Brisbane River port. The spill came from cargo
damaged by other unsecured cargo on the deck of the MV Pacific Adventurer during rough weather.
About 155 hectares of coastal land were affected, needing about $31 million and 1500 people to clean
up. Other effects included oiled wildlife and degraded coastal ecosystems, closed and restricted local
fisheries and reduced recreation and tourism.

Marine and riverine oil spills trigger an initial joint response from Maritime Safety Queensland and
Council, with Queensland Department of Environment and Science responding to oiled wildlife. Council
may be lead responder in smaller spills, but Maritime Safety Queensland will be lead responder for
larger spills. Council’s response shall be guided by the Marine and Riverine Oil Spill Response Plan.


Marine strandings
Marine strandings occur when alive or dead marine mammals, turtles or large fish wash up on
beaches, triggering a Council and Department of Environment response process. Where large
numbers of small fish or other animals wash up onto the beach this process may also be triggered.

Human safety, for staff, rescuers and the general public, is always the first consideration, and
when the animal is alive, humane and ethical considerations also come into play, triggering
Department of Environment and Science and veterinarian assessment and a possible rescue
response. Where a dead animal may have conservation significance, data or the body may be
collected for further assessment or preservation. Body disposal is usually undertaken by Council to
minimise public health risk, and replicate natural processes where possible.


EBFMP Management activities
The following actions are identified for implementation:

 Action                                            Responsible party      Resources        Due date
                                                                                           and status
 13.1. Identify site specific required fire risk   Environmental          Subject to       2023/24
 interface treatments as required by the           Services               future           ongoing
 Noosa Strategic Bushfire Management Plan                                 budget
 and work with neighbours to establish that
 treatment
 13.2. Review incident management                  Environmental          Within           2022/23
 procedures and update as required                 Services               existing         ongoing
                                                                          operational
                                                                          expenditure
 13.3. Publish a case study and video about        Environmental          Within           2022/23
 the pontoon and polystyrene removal to            Services               existing
 inform future incidents                                                  operational
                                                                          expenditure
 13.4. Better support and collaborate with         Environmental          Subject to       2023/24
 community local marine debris cleanup.            Services               future
                                                   Infrastructure         budget
                                                   Services




Eastern Beaches Foreshore Management Plan – Draft (V4 26.9.22 – for public consultation)        Page 37

Section 40

February 2022 floods – grounded pontoons

During the February 2022 Queensland floods, an estimated 18 pontoons and docks washed out of
Brisbane River beach and grounded on Noosa’s beaches. Polystyrene is used as flotation in
pontoons, and as the outer pontoon layers broke down it was exposed to natural elements and
crumbled into small pieces that were readily spread by wind and waves. The large pieces of
pontoon were removed with large machinery. Smaller pontoon and polystyrene pieces were
removed by community individuals and groups, Council officers and contractors by hand, vacuum
and beach cleaner. Several months later, small beads scattered in very isolated pockets remain in
the dunes and on tide lines and are likely to continue to be exposed by wind and wave action,
particularly during storms. Council and community members continue to monitor and do further
cleanup as required.

A polystyrene round table in July 2022 brought State, local government and community
stakeholders together to review what happened during the pontoon beaching and cleanup from
various perspectives. Recommendations were developed during the meeting including better
pontoon construction, maintenance and identification standards, more coastal information and
hazard response capability for natural disasters dashboards and frameworks, better information
distribution and community co-ordination by Council, and better recognition of marine debris as a
pollution incident.




Eastern Beaches Foreshore Management Plan – Draft (V4 26.9.22 – for public consultation)   Page 38

Section 41

14. Coastal creeks and stormwater
The lowest reaches of several un-named and named coastal creeks and drainage lines cross the
Eastern Beaches foreshores reserves and beaches and discharge into the Coral Sea. Many of
these receive stormwater from the surrounding developments, roads and buildings. Burgess Creek
also receives treated discharge from the Unitywater Noosa Coastal Sewage Treatment Plant
(STP), which treats the sewage from Noosa’s coastal development. Large quantities of stormwater
from surrounding developments, buildings and roads is also discharged directly into foreshore
reserves and other reserves.


Ecosystem service benefit
Creeks and natural areas that receive stormwater and STP discharges from surrounding private
and public properties are providing ecosystem service benefits to the community. They facilitate
urban development by taking the increased, concentrated runoff that urban development inevitably
produces. Stormwater drains allow the rapid movement of water off roads, improving road function
and safety. The natural areas that receive the stormwater can help protect the broader
environment by filtering and slowing the discharge.

However, many traditional stormwater management approaches and infrastructure can impact on
the environmental and social values of the receiving creeks, natural areas and the wider
environment, particularly where stormwater management has not kept pace with increased urban
flows from new development.


The impacts of stormwater and STP discharge
Stormwater inputs are more concentrated, have more volume and are delivered more quickly than
natural flows, which increase the volume, velocity and peak height of creeks after storms. In
Burgess Creek this increased and concentrated flow can cause erosion and sedimentation,
deepen and widen flowlines and cause landslips. Stormwater also often carries nutrients, weed
seeds and other pollutants into the creek.

Where stormwater is discharged into natural areas away from creeks it can cause erosion,
sedimentation and weed infestations from the seeds and nutrients in the stormwater.

There is community concern about the creek mouths causing erosion to the frontal dunes. Other
community members are concerned about stormwater, rubbish and possibly polluted water running
across beaches, particularly in high beach pedestrian traffic areas. In some places mobile creek
mouths affects beach accesses and access onto, and along, the beach.


Burgess Creek
Burgess Creek and Burgess Creek Bushland Reserve is an example of a receiving coastal creek
and natural area that provides significant ecosystem benefits to the Noosa community and the
wider environment. This impacts on environmental and social values here, but the creek and
surrounding bushland still retains environmental and social values. The area along the creek and
the creek mouth is popular for walkers, nature lovers and surfers who traverse the reserve to
access the beach.

Since urban development and associated stormwater starting in the 1960s and the STP was
opened in 1986, the wetlands in the Burgess Creek catchment have absorbed and filtered the
urban runoff and treated water. However, the treated water and stormwater discharge into Burgess
Creek has significantly changed the creek and adjacent wetlands – the amount, duration and
consistency of flow has dramatically increased, as has the area of permanently inundated land.

Eastern Beaches Foreshore Management Plan – Draft (V4 26.9.22 – for public consultation)   Page 39

Section 42

Nutrient levels and other pollutants have significantly increased, and water quality generally
decreased. This means that wetland and waterway species that can handle both the permanent,
high inundation, nutrients and reduced water quality survive in and near the original creek banks in
the lower reaches.

Erosion
There are two erosion concerns near the mouth of Burgess Creek. Up to about 270 metres of the
frontal dunes to the north of the creek mouth can be eroded during high flow events. The northern
bank of the creek near the mouth, east of the David Low Way, is eroding, due to a combination of
lots of uncontrolled foot traffic down, and on, a very steep creek bank, and high peak waterflow.
The creek alignment at the mouth is highly mobile.

Water contact
Many people are accessing the creek mouth via the informal access off David Low Way. Contact
duration and types range from brief lower limb skin contact while crossing the creek, to prolonged
contacts that are likely to incur ingestion, such as adult supervised children and dogs playing in the
water, and rod fishing. Council recommends people do not put their head underwater in the creek.

Protecting Noosa’s environment
While Burgess Creek itself is affected by treated water discharge, it helps protect Noosa River,
Laguna Bay and the Coral Sea. Noosa River’s good condition and A- rating reported in its lower
reaches through the Healthy Land and Water Report Card7 is unique in urban SEQ rivers, and due
in part to Burgess Creek receiving the treated wastewater from the densely populated coastal
areas rather than Noosa River. The higher levels of infiltration, filtration and nutrient uptake
afforded by the natural surfaces and native and weedy vegetation in the bed, banks and surrounds
of Burgess Creek reduces the amount of water, sediment and nutrient entering the Coral Ocean
and being swept up into Laguna Bay when compared to a piped outfall. This in turn helps improve
inshore water quality and reduces algal blooms that may affect swimming and beach resources.

Environmental and community values
Despite past and ongoing impacts, some of them highly significant, Burgess Creek Bushland
Reserve contributes significant site and landscape conservation biodiversity and environmental
values. Values include waterway and land-based wildlife connectivity, connecting nearby national
park to the coastal foreshore strip, essential habitat, and significant plant and animal species.

It is highly valued by the local community, with enthusiastic Bushcare volunteers contributing to
planning and rehabilitation activities in the reserve. These activities are supported by Noosa
Council’s Bushland Care program, Natural Areas team and Unitywater, the managers of the STP.


EBFMP Management actions
The following actions are identified for implementation:

 Action                                              Responsible           Resources          Due date
                                                     party                                    and status
 14.1. Work with Unitywater, Infrastructure          Infrastructure        Subject to         2023/24
 Services, and community members to                  Services              future budget
 prioritise and develop catchment                    Environmental
 management plans for coastal creeks that:           Services
      consider all sources of water and             Environmental
          influences on hydrology                    Health


7 Healthy Land and Water (2021). “Report Card 2021”. Available Online: https://hlw.org.au/report-card/


Eastern Beaches Foreshore Management Plan – Draft (V4 26.9.22 – for public consultation)            Page 40

Section 43

        rank and prioritise remediation works
         on land slips, slumps and other
         impacts
        assesses stormwater management
         requirements for the catchment
        consider degraded natural and social
         values alongside other stormwater
         related impacts

 14.2. Prioritise, plan, schedule and             Infrastructure        Subject to         2023/24
 implement the management of coastal creek        Services              future budget      ongoing
 mouth alignment and erosion                      Environmental
                                                  Services
 14.3. Work with Unitywater, the State            Environmental         $25,000/annum      2022/23
 Government and community members to              Services              Unitywater for     ongoing
 restore bushland and improve water quality       Unity Water           bushland
 at Burgess Creek                                                       restoration to
                                                                        support Council
                                                                        Bushcare
                                                                        program
 14.4. Advocate to State government for           Environmental         Within existing    2022/23
 comprehensive water quality assessments          Services              operational        ongoing
 and standards for all coastal creeks and         Environmental         expenditure
 inshore marine environments                      Health
                                                  Infrastructure
                                                  Services




Eastern Beaches Foreshore Management Plan – Draft (V4 26.9.22 – for public consultation)       Page 41

Section 44

15. Foreshore tenure and gazettal
Appropriate tenure and gazettal of public land can be critical to protecting its values and achieving
long term objectives. The EBFRs are a mix of public land tenures and reserve purposes, including
reserves for community purposes with Council as Trustee, unallocated crown land, esplanade and
some areas that don’t appear to have any property description at all.


Undescribed land and unallocated state land
Public land without a property description is common on our foreshores. In many places there is
currently vegetated land to the east of the gazetted reserves that doesn’t have a property or road
parcel description, mostly recent dune build-up and native vegetation regeneration. There may be
some areas of undescribed land in the network of reserves and road reserve that make up the
foreshore reserves. There is also unallocated State land with a property description that does not
appear to be a reserve under a Trustee arrangement or have any formal arrangements for Council
to manage. In reality Council manages this land as the Trustee.


Existing Reserve Community Purpose
Many of the current gazetted reserve purposes may not be appropriate for our naturally vegetated
foreshores – for instance recreation reserves are supposed to be developed in some way for
‘recreation’. The gazettal of the foreshore reserves was highlighted during the initial consultation
and in other coastal management forums. It is seen by some as a barrier to managing the
foreshore reserves as natural areas to help manage climate change and may pose challenges
regarding community perception about how these areas are being managed.


New Reserve Community Purposes
Newer and perhaps more appropriate community purposes for the Eastern Beaches foreshore now
exist under the Land Act, reviewed in 2017. They may better reflect the current condition of the
reserves and our future management intent as expressed in the CHAP and other strategic
documents. These include Beach protection, Coastal Management and Environmental protection.

Some are concerned that none of these community purposes expressly protect public access to
foreshores and beaches. This concern is acknowledged and recognised with long-term
maintenance of community access to foreshores and beaches being a management objective in
this Plan and a central plank of any tenure and gazettal discussions with the State Government.


Land Management Plans
Land Management Plans facilitate a process that allows State and Local Governments to come to
an agreement about detailed reserve management. They can recognise local reserve management
documents and deal with issues such as foreshore access that are not specifically dealt with in the
Community purpose description. These could be both an interim and long-term measure.


EBFMP Management actions
The following actions are identified for implementation:

 Action                                                 Responsible        Resources       Due date
                                                        party                              and status
 15.1. In collaboration with Council’s Property         Environmental      TBA             TBA
 Services and the State Lands Division explore the      Services
 best way to secure the EBFR values in the long         Property
 term, including reserve purposes and tenure
 issues and Land Management Plans

Eastern Beaches Foreshore Management Plan – Draft (V4 26.9.22 – for public consultation)        Page 42

Section 45

16. Attachments
Attachment One - Legislation and policy linkages

 Level               Legislation
 Commonwealth        Environment Protection and Biodiversity Conservation Act 1999
                     Aboriginal Cultural Heritage Act 2003
                     Agricultural Chemicals Distribution Control Act 1998
                     Biosecurity Act 2014
                     Coastal Protection and Management Act 1995
                     Environmental Offset Act 2014
                     Fire and Rescue Service Act 1990
                     Nature Conservation Act 1992
                     Land Act 1994
 State
                     Local Government Act 2009 (QLD)
                     SEQ Regional Plan 2009 – 2031
                     Planning Act 2016 & Planning Regulation 2017 (Schedule 10)
                     Public Health Act 2005 & Regulation 2018
                     State Planning Policy July 2017 & State Interest Guidelines
                     Vegetation Management Act 2009
                     Water Act 2000
                     State Planning Policy 2/10 Koala Conservation in SEQ
                     Noosa Council Planning Scheme 2020
                     Priority Infrastructure Plan (Local Government Infrastructure Plan)
 Local Laws and      Local Law No.2 (Animal Management) 2015
 planning
                     Local Law No.3 (Community & Environmental Management) 2015
 instruments
                     Local Law No.4 (Local Government Controlled Areas, Facilities, & Roads)
                     2015
                     Local Law No.6 (Bathing Reserves) 2015




Eastern Beaches Foreshore Management Plan – Draft (V4 26.9.22 – for public consultation)   Page 43

Section 46

Local strategic and planning drivers
 Document                                      Relevance
 Noosa 2.0 Corporate Plan 2023-2028            A coastal management plan is a Operational Plan
 Operational Plan 2022-2023                    2022-2023 goal.
 Noosa Council Environment Strategy            The social and environmental values of coastal
 2019                                          ecosystems are recognised and several targets
                                               and outcomes require them to be protected and
                                               enhanced.
 Noosa Biodiversity Plan: Biodiversity         Outlines the current and likely future state of
 Assessment Report 2016                        biodiversity in Noosa Shire and identifies dune
                                               ecosystems as being both at risk and having
                                               significant values.
 Noosa Cultural Plan 2019 – 2023               Identifies working with Kabi Kabi (Gubbi Gubbi) to
                                               collaboratively manage Bushland environmental
                                               and cultural values.
 Noosa Local Government Area                   Several of the management actions and priority
 Biosecurity Plan 2020                         pest species (including broad leaf pepper,
                                               Singapore daisy and foxes) directly apply to
                                               foreshore reserves.
 Noosa Climate Change Response Plan            Identifies healthy and resilient natural systems as
                                               strategic priority, and specifically identifies the
                                               need to develop a coastal management plan for
                                               dune management and ecological restoration and
                                               partnerships.
 Noosa Bushland Reserve Strategic Fire         Determines the level of fire threat and fire risk
 Management Plan 2021 - 2026                   related interface management required for
                                               bushland reserves and foreshore reserves.
 Noosa Bushland Reserves Strategic             Outlines the values and management issues in
 Management Plan 2021 – 2026                   Council’s bushland reserve network, including
                                               foreshore reserves to help prioritise management
                                               responses.
 Noosa Coastal Hazards Adaptation Plan         Describes risks from coastal hazards including
 2021                                          erosion, storm tide and gradual sea level rise and
                                               identifies nature-based solutions as the preferred
                                               adaptation response to likely impacts. Includes a
                                               biodiversity vulnerability assessment and a cost-
                                               benefit analysis for the Eastern Beaches. These
                                               assessments identified the importance of dune
                                               revegetation, augmentation and management to
                                               maximise benefits of coastal foreshores for both
                                               human and natural systems.
 Noosa Walking and Cycling Strategy and        Some of the existing walking and cycle paths
 Implementation Plan 2020-2040                 pass through or alongside EBFRs. The plan
                                               guides the prioritisation of pathway
                                               improvements.




Eastern Beaches Foreshore Management Plan – Draft (V4 26.9.22 – for public consultation)      Page 44

Section 47

Links to Noosa Environment Strategy 2019
Theme 1 - Biodiversity
Goal: By 2030 the condition and extent of our natural ecosystems has improved.

Target                                      Measure                                 Implementation in EBFRs
Strategy 1.1 Protect and enhance existing ecosystems, vegetation networks and habitats
By 2030, there is no net loss of            Bushland Operational Assessments        BOAs were undertaken in some
ecosystem values across the shire,          (BOAs) will be undertaken every 5       EBFRs in 2012, and across all
and the condition of Council’s priority     years across priority Council           EBFRs in 2017. BOAs are being
bushland reserves are enhanced.             managed Bushland Reserves.              repeated in all EBFRs from 2022-23.

Strategy 1.3: Improve long-term survival for threatened species and ecological communities
By 2030, populations of key threatened Monitored as part of the Threatened        The new Threatened Fauna
indicator species remain viable.           Species Plan and reported in the       Recovery Roadmap identifies key
                                           Environment Strategy’s Monitoring      threatened species and provides a
                                           Program.                               framework for ongoing monitoring .
                                                                                  The EBFMP identifies relevant
                                                                                  significant species to help direct their
                                                                                  monitoring and management plan
                                                                                  implementation.




 Activity/project                           Council’s        Strategies       Status in EBFRs in 2022
                                            role
 Undertake environmental restoration        Provider,        1.1, 1.3, 2.1,   BOAs undertaken as required. Completed
 activities throughout Council’s            facilitator,     2.2, 4.3         in 2022-23. Ecological restoration grant
 conservation reserves. Prepare             funder                            ($75,000 / yr over three years FY20-23)
 BOAs for Council reserves to monitor                                         funded by Environment Levy grant,
 the success of work.                                                         delivered by community volunteer
                                                                              directed contractors and volunteers. In
                                                                              2022, Council provides 3 labour days
                                                                              contractor support per reserve per year.
 Reduce the threat of priority              Partner,         1.1, 1.3, 2.2,   See above.
 biosecurity risks, such as pest plants     educator,        4.3              Glory lily continues to expand - areas of
 and animals, on Council land and           provider,                         most other weeds are reducing.
 support private landholders to do the      regulator
 same.
 Identify priority land parcels that        Planner,         1.1, 1.2, 2.2,   The EBFMP identifies east west
 enhance landscape connectivity and         provider         4.1              connectivity and collaboration
 seek to have them managed for                                                opportunities to work with other areas of
 environmental outcomes, either                                               Council to achieve better connectivity
 through direct purchase by Council, or                                       through these areas.
 utilising other appropriate protective
 mechanisms.
 Undertake detailed biodiversity            Partner,         1.1, 1.3         The biodiversity values of the EBFRs
 assessments across different Broad         researcher,                       need to be assessed in a fine-scale
 Vegetation Groups, with a view to          funder                            manner to produce regional ecosystem
 understanding and monitoring the                                             mapping. n. BOAs need to be prepared
 health of biodiversity across the Shire.                                     as 5 yearly condition maps with updated
                                                                              rehabilitation plans.
 Scope and undertake monitoring             Partner,         1.1, 1.3         The EBFRMP identifies relevant
 programs on populations of 6-8 key         researcher,                       significant species and directs their
 representative threatened species, to      funder                            monitoring and management plan
 mitigate against local extinctions.                                          implementation under the Threatened
                                                                              Fauna Recovery Roadmap




Eastern Beaches Foreshore Management Plan – Draft (V4 26.9.22 – for public consultation)                          Page 45

Section 48

Theme 2 - Waterlands, Wetlands and Coasts

Goal: By 2030 waterways, wetlands and coasts are healthy, resilient to change and valued by the
community.
 Target                                 Measure                                  Implementation in EBFRs
 Strategy 2.2: Protect and enhance coastal environments and vegetated buffers to coastal
 foreshores
 By 2030, maintain the extent of        Review mapping of vegetation extent      Detailed regional ecosystem
 vegetated buffers and improve          of coastal foreshores every 2 years.     mapping were prepared in EBFRs in
 diversity of coastal ecosystems.                                                2021-22, with significant expansion
                                        Every 5 years updated regional           of mapped high value regrowth and
                                        ecosystem mapping will be used to        some expansion of mapped Regional
                                        identify changes in the number and       Ecosystems (RE). In 2021 mapped
                                        extent of coastal regional               High Value Regrowth (HVR) and RE
                                        ecosystems.                              was 87.3 ha, increasing to 126.9 ha
                                                                                 in 2022. Four new REs, 12.2.5,
                                                                                 12.2.7, 12.2.13, and 12.2.15, were
                                                                                 mapped, probably due to the more
                                                                                 detailed mapping rather than more
                                                                                 recovered vegetation.



Activity/project                        Council’s         Strategies         Status in EBFRs in 2022
                                        role

Develop an integrated water             Partner,          2.1, 2.2, 4.3      The Rivers and Coast team will use
monitoring network for Council,         enabler,                             baseline water quality data to develop
community and other agencies,           funder                               sub-catchment report cards for coastal
including event monitoring of                                                creeks (Marcus, Peregian and
sediments, nutrients and litter for                                          Castaways) to determine water quality
Noosa and Mary Catchments, and a                                             and management actions, with the
Mary River sub-catchment baseline                                            potential to expand the monitoring of
and report card.                                                             coastal creeks in future.
                                                                             Work with the Environmental Health team
                                                                             is underway to ensure data collected
                                                                             through the recreational water quality
                                                                             monitoring program more publicly
                                                                             accessible.

Implement an Eastern Beaches dune       Partner, funder   1.1, 1.3, 2.2,     The development of the EBFMP is a direct
rehabilitation program to improve the                     4.3                result of this activity. Updated condition
condition, species diversity and                                             mapping and ecological restoration plans
stability of dune ecosystems and                                             to occur in 2022-23, with implementation
enhance resilience to climate change.                                        subject to Council budget allocation and
                                                                             resourcing.
Undertake a stormwater quality          Provider,         2.1, 2.2, 4.3      Stormwater infrastructure audits and
improvement program, that includes      researcher                           condition assessments are ongoing and
an audit of stormwater quality                                               help inform Council’s capital works
improvement devices, analysing                                               renewal programs. The Burgess Creek
current infrastructure, current best                                         sub-catchment requires the development
practice and options to improve                                              of a catchment management plan to
infrastructure as it is due for                                              inform future planning and improvements,
replacement.                                                                 which is being led by the Infrastructure
                                                                             division.
                                                                             The Environmental Health and
                                                                             Environmental Services branches are
                                                                             working on a coordinated approach to
                                                                             stormwater quality monitoring.




Eastern Beaches Foreshore Management Plan – Draft (V4 26.9.22 – for public consultation)                       Page 46

Section 49

Theme 4 - Climate change adaptation and resilience
Goal: By 2030 the resilience of the Noosa community and environment has increased.

 Target                                 Measure                                 Implementation in EBFRs
 Strategy 4.3: Manage the natural environment in a way that improves resilience to climate change
 Ecosystem health of wetlands           A baseline will be developed to         BOA mapping for the whole of the
 and riparian areas is                  measure the ecosystem health of         EBFRs, including coastal wetlands,
 improved.                              coastal wetlands.                       to be updated in 2022-23 and
                                        Mapping of vegetation will be           repeated every five years.
                                        reviewed every three years.




 Activity / project                     Council’s         Strategies       Status in EBFR in 2022
                                        role

 Implement energy efficiencies          Provider,         3.2, 4.1, 4.2    Energy efficient, renewable and
 throughout Council-owned facilities    leader, funder                     otherwise sustainable technologies,
 and operations, such as the                                               materials and methods are identified as
 installation of solar PV systems and                                      criteria and objectives in community
 use of lower-emission transport                                           infrastructure projects such as the Beach
 options.                                                                  Access Design Standards project.




Links to principles and strategies in Noosa Coastal Hazards Adaptation Plan 2021
The management of the EBFRs as natural areas, conserving the natural dunes, beaches and
plants and animals in the long-term, is clearly supported in Noosa’s Adaptation Principles, created
with the community during the development of the Coastal Hazards Adapation Plan (CHAP). A
selection of key principles are provided below:

Guiding principles - the Noosa Environment
       1.      Adaptation does not adversely impact upon the natural assets of Noosa.
       2.      Adaptation supports the resilience of native flora and fauna, natural dune systems
               and beaches.
       3.      Adaptation maintains the natural landscape character of places and provides for
               attractive natural solutions that harmonise with local environmental features.

Other relevant aspects of Council’s Adaptation Principles relating to community, economy, long-
term planning and excellence, particularly supporting the preservation of beach accesses and
community and visitor recreation assets include:
     Increasing community safety and resilience to risks from climate change,
     Maintaining or enhancing public accessibility into coastal landscapes without impeding on
        natural values,
     Minimising community disruption from climate hazards,
     Maintaining economic functionality and minimising future climate-related damage costs,
     Embedding flexibility and adaptability,
     Ensuring intergenerational and intragenerational equity,
     Prioritising community consultation and involvement in early planning,
     Driving science driven decision-making,
     Minimising future costs to Council and creating co-benefits wherever possible.




Eastern Beaches Foreshore Management Plan – Draft (V4 26.9.22 – for public consultation)                     Page 47

Section 50

Two of the most prominent messages received from the Noosa community during the CHAP’s
development align with this sentiment as they specifically emphasise the use of nature-based
solutions to protect human and natural systems from the impacts of coastal hazards: “...there is a
strong preference for nature-based solutions that fit with the look and feel of Noosa, and that
minimise impacts to natural environments” and “natural and scenic amenity assets are considered
to have the highest intrinsic value to the community” (Noosa Council CHAP, 2021:18). Dune
revegetation and management, which improves coastal protection while also contributing to
biodiversity conservation, is widely recognised as a nature-based solution.8

Sentiments shared through community input were further corroborated through technical studies
performed throughout Phase 2 to Phase 7 of the CHAP. The cost-benefit analysis9 undertaken in
2020 clearly demonstrated that dune revegetation, augmentation and management provide the
greatest economic net present benefit for managing coastal hazards along the Eastern Beaches.
Likewise, the CHAP Biodiversity Assessment10 found that increasing vegetation protection and
connectivity, protecting refugia and reducing existing threats can assist biodiversity in adapting to
climate change. Specifically:
     “Expanding protected areas within and directly landwards of the coastal hazard zone,
       including public reserves and supporting private land conservation initiatives. Protection
       more habitat within the coastal zone will help biodiversity assets adapt to coastal hazards
       and other climate change factors.”
     “Regulating vegetation clearing within and directly landwards of the coastal hazard zone as
       protecting remnant and regrowth native vegetation will be vital in increasing the capacity of
       biodiversity to adapt and persist in a changing climate. Maintaining and improving the
       condition of existing native vegetation is also likely to be more productive than restoring
       land that has been substantially modified.”
     “Managing biodiversity threats within the coastal hazard area, particularly invasive species,
       fire, disease, reduced water quality and environmental flows to enhance adaptive capacity
       of biodiversity assets over the short to medium term.”
     “Restoring habitats within and directly landwards of the coastal hazard area to improve
       landscape connectivity for climate change adaptation.”

In consideration of these findings, revegetation and management within the foreshore reserves and
dune area, have been identified as high priorities in the CHAP in response to increasing coastal
hazards:

“Pursue dune management and revegetation in high-risk erosion areas as a critical and immediate
priority for Council and the community in helping to build coastal resilience and management of
erosion risks” (Noosa Coastal Hazards Adaptation Plan, 2021:40).

For beach locations, including the Eastern Beaches, developing a Coastal Foreshores
Management Plan was listed as a key Shire-wide action alongside a selection of other priorities
relevant to the EBFRs and EBFMP as noted below:
     Implement relevant actions from Coastal Foreshores Management Plan once developed
     Improve the awareness and understanding of coastal hazard risks and adaptation
       measures amongst the Noosa community and other key stakeholders
     Ensure disaster management plans and procedures are considering changes to coastal
       hazard risks where necessary
     Pursue dune management and revegetation in high-risk erosion areas as a critical and
       immediate priority for Council and the community in helping to build coastal resilience and
       management erosion risks.

8 Morris et al. (2021). The Australian Nature-Based Methods for Reducing Risk from Coastal Hazards. Earth

Systems and Climate Change Hub Report No. 26. NESP Earth Systems and Climate Change Hub, Australia.
9 Aither (2020). Noosa Shire Council – Coastal Hazard Adaptation Plan Cost benefit analysis: Final report

prepared for Noosa Shire Council.
10 BMT (2019:47). Noosa Shire Council CHAP Biodiversity Assessment.




Eastern Beaches Foreshore Management Plan – Draft (V4 26.9.22 – for public consultation)          Page 48

Section 51

The CHAP goes further to detail locality-specific outcomes and adaptation actions that link back to
the Adaptation Principles, community preference, and the technical studies. Those that relate
directly to this Plan are outlined below11:

Peregian Beach
    “Preferred adaptation outcomes identified in the CHAP:
          o Implement measures that support and enhance dunes, beach health and natural
             coastal processes as soon as possible.
          o Prevent the construction of hard protective structures where possible that are likely
             to exacerbate erosion risk, impact on preferred outcomes for dune and beach
             health, impair natural coastal processes, and lead to adverse impacts on
             neighbouring areas.
          o Re-locate important recreational and infrastructure assets outside the projected
             high-risk coastal erosion prone area by 2070
          o Where important recreational and infrastructure assets cannot be feasibly re-
             located, seek to accommodate the risks by adapting the design of these assets to
             be more resilient during and after a major erosion event.
    5-year Actions identified in the CHAP:
          o Investigate alternative designs for beach accesses so as to accommodate coastal
             processes of erosion and accretion
          o Expand native vegetation coverage to support frontal dune stabilisation
          o Re-design beach accesses to deter foot traffic across nearby dunes
          o Install signage for increasing beach user understanding of importance of healthy
             dune systems
          o Assess options for relocating fencing on seaward boundary of Peregian Park to
             permit dune movement
          o Investigate options of managed alignment of coastal creeks and other natural
             drainage locations
          o Investigate impact of illegal encroachment by private asset owners into publicly-
             owned dune areas on dune health and natural coastal processes”

Marcus & Castaways Beaches
    “Preferred adaptation outcomes identified in the CHAP:
         o Implement measures that support and enhance dunes, beach health and natural
             coastal processes as soon as possible.
         o Prevent the construction of hard protective structures where possible that are likely
             to exacerbate erosion risk, impact on preferred outcomes for dune and beach
             health, impair natural coastal processes, and lead to adverse impacts on
             neighbouring areas.
    5-year Actions identified in the CHAP:
         o Expand native vegetation coverage to support frontal dune stabilization
         o Re-design beach accesses to deter foot traffic across nearby dunes
         o Install signage for increasing beach user understanding of importance of healthy
             dune systems
         o Investigate options of managed alignment of coastal creeks and other natural
             drainage locations”

Sunrise & Sunshine Beaches
    “Preferred adaptation outcomes identified in the CHAP:
          o Implement measures that support and enhance dunes, beach health and natural
             coastal processes as soon as possible.
          o Prevent the construction of hard protective structures where possible that are likely
             to exacerbate erosion risk, impact on preferred outcomes for dune and beach

11 Noosa Council (2021). Coastal Hazards Adaptation Plan – Section 5: Locality Risks and Adaptation

Outcomes.

Eastern Beaches Foreshore Management Plan – Draft (V4 26.9.22 – for public consultation)          Page 49

Section 52

              health, impair natural coastal processes, and lead to adverse impacts on
              neighbouring areas
          o Begin re-locating recreational assets outside the projected high risk coastal erosion
              prone area by 2040, such as seating and footpaths
          o Re-locate service infrastructure asses to areas outside the high-risk area by 2070
          o Where important recreational and service infrastructure assets cannot be feasibly
              re-located, seek to accommodate the risks by adapting the design of these assets to
              be more resilient during and after a major erosion event.
          o Ensure development in erosion prone areas mitigates the risk to people and
              property to an acceptable or tolerable level, consistent with the State Planning
              Policy: natural hazards risk and resilience
      5-year Actions identified in the CHAP:
          o Investigate alternative designs for beach accesses so as to accommodate coastal
              processes of erosion and accretion
          o Expand native vegetation coverage to support frontal dune stabilization
          o Re-design beach accesses to deter foot traffic across nearby dunes
          o Investigate options for managing foot traffic within frontal dune areas, including
              fencing design
          o Install signage for increasing beach user understanding of importance of healthy
              dune systems
          o Investigate options of managed alignment of coastal creeks and other natural
              drainage locations where creeks consistently erode incipient dunes
          o Investigate impact of illegal encroachment by private asset owners into publicly-
              owned dune areas on dune health and natural coastal processes”

The two methods identified in the CHAP for mitigating present day risks in Peregian Beach,
Marcus Beach, Castaways Beach, Sunrise Beach and Sunshine Beach include:
    “Maintaining and enhancing vegetated dune areas, which act as a natural buffer to erosion
      by dispersing wave energy during storm events;
    Planning controls on coastal development that prevent encroachment into the vegetated
      dune areas, thereby preserving natural coastal processes of erosion and accretion.”




Eastern Beaches Foreshore Management Plan – Draft (V4 26.9.22 – for public consultation)   Page 50

Section 53

Attachment Two: Regional Ecosystem short descriptions.
RE 12.2.14: Strand and fore dune complex comprising Spinifex sericeus grassland Casuarina
equisetifolia subsp. incana low woodland/open forest and with Acacia leiocalyx, A. disparrima
subsp. disparrima, Banksia integrifolia subsp. integrifolia, Pandanus tectorius, Corymbia
tessellaris, Cupaniopsis anacardioides, Acronychia imperforata and Hibiscus tiliaceus. Occurs
mostly on frontal dunes and beaches but can occur on exposed parts of dunes further inland.
VMA Status: Least Concern
Biodiversity Status: No concern at present

Small pockets of other mapped remnant Regional Ecosystems and High Value Regrowth occur,
including;

12.2.5 Corymbia intermedia +/- Lophostemon confertus +/- Banksia spp. +/- Callitris columellaris
open forest on beach ridges usually in southern half of bioregion
VMA Status: Least Concern
Biodiversity Status: Of Concern

12.2.7 Melaleuca quinquenervia or rarely M. dealbata open forest. Other species include
Eucalyptus tereticornis, Corymbia intermedia, E. bancroftii, E. latisinensis, E. robusta,
Lophostemon suaveolens and Livistona decora. A shrub layer may occur with frequent species
including Melastoma malabathricum subsp. malabathricum or Banksia robur. The ground layer is
sparse to dense and comprised of species including the ferns Pteridium esculentum and Blechnum
indicum the sedges Schoenus brevifolius, Baloskion tetraphyllum subsp. meiostachyum,
Machaerina rubiginosa and Gahnia sieberiana and the grass Imperata cylindrica. Occurs on
Quaternary coastal dunes and seasonally waterlogged sandplains usually fringing drainage system
behind beach ridge plains or on old dunes, swales and sandy coastal creek levees.
 VMA Status: Least Concern
Biodiversity Status: No concern at present

12.2.13 Open or dry heath. Characteristic shrubs include stunted Banksia aemula and
Allocasuarina littoralis as well as Xanthorrhoea johnsonii, Leptospermum semibaccatum,
Phebalium woombye, Dillwynia retorta and Caustis recurvata. Usually occurs on Pleistocene
dunes and beach ridges
VMA Status: Of Concern
Biodiversity Status: Endangered

12.2.15 Closed sedgeland in coastal swamps and associated water bodies. Characteristic species
include Gahnia sieberiana, Empodisma minus, Gleichenia spp., Blechnum indicum, Lepironia
articulata, Baumea spp., Juncus spp., and Eleocharis spp. Occurs on Quaternary coastal dunes
and beaches. Low part of coastal landscape where water collects from both overland flow and
infiltration from adjoining sand dunes.
VMA Status: Least Concern
Biodiversity Status: No concern at present




Eastern Beaches Foreshore Management Plan – Draft (V4 26.9.22 – for public consultation)   Page 51

Section 54

Attachment Three: Significant species management documents
Relevant management documents include;

Recovery Plan for Marine Turtles in Australia
https://www.awe.gov.au/sites/default/files/documents/recovery-plan-marine-turtles-2017.pdf

Threat Abatement Plan for the impacts of marine debris on the vertebrate wildlife of Australia’s
coasts and oceans (2018)
https://www.awe.gov.au/sites/default/files/documents/tap-marine-debris-2018.pdf

Threat abatement plan for predation by European red fox
https://www.awe.gov.au/environment/biodiversity/threatened/publications/tap/predation-european-
red-fox

National Light Pollution Guidelines for Wildlife Including Marine Turtles, Seabirds and Migratory
Shorebirds
https://www.awe.gov.au/sites/default/files/documents/national-light-pollution-guidelines-wildlife.pdf

National recovery plan for the wallum sedgefrog and other wallum-dependent frog species
https://www.awe.gov.au/sites/default/files/documents/wallum-frogs.pdf

Survey guidelines for Australia's threatened frogs: Guidelines for detecting frogs listed as
threatened under the EPBC Act
https://www.awe.gov.au/sites/default/files/documents/survey-guidelines-frogs.pdf

Draft referral guidelines
https://www.awe.gov.au/sites/default/files/documents/draft-referral-guidelines-comment-litoria-
olongburensis.pdf

South East Queensland Natural Resource Management (SEQ NRM) Plan 2014 —2031
The plan aims to maintain or enhance dune values by undertaking ecological restoration,
managing access, recreation, light pollution on dunes.




Eastern Beaches Foreshore Management Plan – Draft (V4 26.9.22 – for public consultation)       Page 52

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.