2022-11-14 GC Agenda - Item 3 - Attachment 1 - Draft Eastern Beaches Foreshore Management Plan
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnEBFMP Management actions
The following actions are identified for implementation:
Action Responsible Resources Due date
party and status
7.1. Update bushland condition mapping for Environmental Within existing 2022/23
all EBFRs - only conduct BOA condition Services operational
mapping in foreshore areas during summer expenditure
when the glory lily is showing
7.2. Update and implement ecological Environmental $225,200/annum 2023/24,
restoration plan for all EBFRs Services implementation ongoing
Includes:
Increased labour
days for
ecological
restoration
0.5 FTE
Environment
Technical Officer
(new)
Bushcare
support remains
unchanged
(This would be an
increase to the
current budget which
is $128,400/annum
for 2022/23 which is
including Coast
Connect grant funds)
7.3. Develop post event rapid response Environmental Please see MA 2023/24
funding for ecological restoration Services 6.5
7.4. Incorporate climate change Environmental Within existing 2022-24
considerations in ecological management Services operational
activities expenditure
7.5. Monitor for any changes in the EBFRs Environmental Within existing 2022/24
RE mapping and vegetation extent every Services operational
five years by measuring the extent of expenditure
mapped REs and high value regrowth and
the extent of all vegetation using desktop
mapping, Vegetation Management mapping
and aerial photos
7.6. Maintain and enhance internal Environmental Please see MA 2022-24
connectivity and wildlife movement within Services 7.2
the foreshore reserve strip
7.7. Minimise and actively rehabilitate Environmental Please see MA 2023-24
cleared areas to reduce fragmentation and Services 7.2
edge effect Infrastructure
Services
7.8. Contribute to glory lily research and Environmental Please see MA 2023-24
adopt best practise to managing this pest Services 7.2
species
Eastern Beaches Foreshore Management Plan – Draft (V4 26.9.22 – for public consultation) Page 17
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.