Skip to the record
Trusted by locals. Built for Noosa.

Original source · versioned page text

2022-11-14 GC Agenda - Item 3 - Attachment 1 - Draft Eastern Beaches Foreshore Management Plan

of 54

Page text shows just the words. Original shows the document exactly as it was published.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
EBFMP Management actions
The following actions are identified for implementation:

 Action                                           Responsible         Resources              Due date
                                                  party                                      and status
 7.1. Update bushland condition mapping for       Environmental       Within existing        2022/23
 all EBFRs - only conduct BOA condition           Services            operational
 mapping in foreshore areas during summer                             expenditure
 when the glory lily is showing
 7.2. Update and implement ecological             Environmental       $225,200/annum 2023/24,
 restoration plan for all EBFRs                   Services            implementation ongoing

                                                                      Includes:
                                                                      Increased labour
                                                                      days for
                                                                      ecological
                                                                      restoration
                                                                      0.5 FTE
                                                                      Environment
                                                                      Technical Officer
                                                                      (new)
                                                                      Bushcare
                                                                      support remains
                                                                      unchanged
                                                                      (This would be an
                                                                      increase to the
                                                                      current budget which
                                                                      is $128,400/annum
                                                                      for 2022/23 which is
                                                                      including Coast
                                                                      Connect grant funds)


 7.3. Develop post event rapid response           Environmental       Please see MA          2023/24
 funding for ecological restoration               Services            6.5

 7.4. Incorporate climate change                  Environmental       Within existing        2022-24
 considerations in ecological management          Services            operational
 activities                                                           expenditure
 7.5. Monitor for any changes in the EBFRs        Environmental       Within existing        2022/24
 RE mapping and vegetation extent every           Services            operational
 five years by measuring the extent of                                expenditure
 mapped REs and high value regrowth and
 the extent of all vegetation using desktop
 mapping, Vegetation Management mapping
 and aerial photos
 7.6. Maintain and enhance internal               Environmental       Please see MA          2022-24
 connectivity and wildlife movement within        Services            7.2
 the foreshore reserve strip
 7.7. Minimise and actively rehabilitate          Environmental       Please see MA          2023-24
 cleared areas to reduce fragmentation and        Services            7.2
 edge effect                                      Infrastructure
                                                  Services
 7.8. Contribute to glory lily research and       Environmental       Please see MA          2023-24
 adopt best practise to managing this pest        Services            7.2
 species

Eastern Beaches Foreshore Management Plan – Draft (V4 26.9.22 – for public consultation)         Page 17
Log in to download the original file

2022-11-14 GC Agenda - Item 3 - Attachment 1 - Draft Eastern Beaches Foreshore Management Plan(PDF, 3MB).pdf · 2.7 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.