Original source · versioned page text
2022-11-14 GC Agenda - Item 3 - Attachment 1 - Draft Eastern Beaches Foreshore Management Plan
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnbeach accesses in a safe and environmentally sustainable condition and allow Council to respond
to the changeable environment of the dunes and beach, including the slow changes of gradual
dune building, and sudden changes like the erosion after Cyclone Debbie in 2017.
Beach access and community infrastructure management
Beach access management involves several branches of Council. Track, handrail and community
infrastructure construction, management and upgrade is managed by Civil and Asset Operations
and Infrastructure Planning, Design and Delivery in Infrastructure Services. Grass and
groundcover maintenance alongside the access is managed by Parks in Infrastructure Services.
over hanging trees, surrounding bushland maintenance and coordination of Bushcare volunteers
(who often work from and on beach accesses) are managed by Natural Areas in Environmental
Services.
Emergency access
During recent natural disasters it became clear Council could benefit from improved emergency
access to Noosa’s beaches. Most beach accesses are inaccessible to even small All-Terrain
Vehicles. Access for light vehicles, large machinery or large trucks is very problematic. Even where
the accesses would otherwise be suitable, community infrastructure in nearby open spaces, road
reserves, or along the beach accesses complicate or entirely prevents their use by large or long
vehicles and machinery. Restricted access means more machinery movements along longer
lengths of beaches, with accompanying budget, environmental and beach user impacts. Identifying
a few simple, short beach accesses that could be modified to allow large machinery and small
vehicle access could help resolve this issue. Consideration of accompanying budget, as well as
environmental and beach user impacts is needed to better understand the costs and benefits of
improved emergency beach access.
EBFMP Management actions
The following actions are identified for implementation:
Action Responsible party Resources Due date
and status
12.1. Ensure equitable access to a range of Environmental Within
recreational and natural areas experiences, Services existing Ongoing
distributed across the EBFR Infrastructure operational
Services expenditure
Community Services
12.2. Conduct a review of existing beach Environmental Design 2022/23
accesses, viewing platforms, signage, Services grant
fencing, seat and other community coastal Infrastructure secured
infrastructure, in line with Noosa Design Services
Principles
Review elements include; classification,
location, use, construction and
maintenance, environmental impacts and
defects, over use and new or moved beach
accesses if needed
12.3 Develop design standards for beach Infrastructure Subject to 2023/24
accesses and coastal community Services future ongoing
infrastructure components budgets
Eastern Beaches Foreshore Management Plan – Draft (V4 26.9.22 – for public consultation) Page 33
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.