Original source · versioned page text
2022-11-14 GC Agenda - Item 3 - Attachment 1 - Draft Eastern Beaches Foreshore Management Plan
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnFebruary 2022 floods – grounded pontoons During the February 2022 Queensland floods, an estimated 18 pontoons and docks washed out of Brisbane River beach and grounded on Noosa’s beaches. Polystyrene is used as flotation in pontoons, and as the outer pontoon layers broke down it was exposed to natural elements and crumbled into small pieces that were readily spread by wind and waves. The large pieces of pontoon were removed with large machinery. Smaller pontoon and polystyrene pieces were removed by community individuals and groups, Council officers and contractors by hand, vacuum and beach cleaner. Several months later, small beads scattered in very isolated pockets remain in the dunes and on tide lines and are likely to continue to be exposed by wind and wave action, particularly during storms. Council and community members continue to monitor and do further cleanup as required. A polystyrene round table in July 2022 brought State, local government and community stakeholders together to review what happened during the pontoon beaching and cleanup from various perspectives. Recommendations were developed during the meeting including better pontoon construction, maintenance and identification standards, more coastal information and hazard response capability for natural disasters dashboards and frameworks, better information distribution and community co-ordination by Council, and better recognition of marine debris as a pollution incident. Eastern Beaches Foreshore Management Plan – Draft (V4 26.9.22 – for public consultation) Page 38
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.