Skip to the record
For the highest quality transcripts.

Original source · versioned page text

2022-11-14 GC Agenda - Item 3 - Attachment 1 - Draft Eastern Beaches Foreshore Management Plan

of 54

Page text shows just the words. Original shows the document exactly as it was published.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
Local strategic and planning drivers
 Document                                      Relevance
 Noosa 2.0 Corporate Plan 2023-2028            A coastal management plan is a Operational Plan
 Operational Plan 2022-2023                    2022-2023 goal.
 Noosa Council Environment Strategy            The social and environmental values of coastal
 2019                                          ecosystems are recognised and several targets
                                               and outcomes require them to be protected and
                                               enhanced.
 Noosa Biodiversity Plan: Biodiversity         Outlines the current and likely future state of
 Assessment Report 2016                        biodiversity in Noosa Shire and identifies dune
                                               ecosystems as being both at risk and having
                                               significant values.
 Noosa Cultural Plan 2019 – 2023               Identifies working with Kabi Kabi (Gubbi Gubbi) to
                                               collaboratively manage Bushland environmental
                                               and cultural values.
 Noosa Local Government Area                   Several of the management actions and priority
 Biosecurity Plan 2020                         pest species (including broad leaf pepper,
                                               Singapore daisy and foxes) directly apply to
                                               foreshore reserves.
 Noosa Climate Change Response Plan            Identifies healthy and resilient natural systems as
                                               strategic priority, and specifically identifies the
                                               need to develop a coastal management plan for
                                               dune management and ecological restoration and
                                               partnerships.
 Noosa Bushland Reserve Strategic Fire         Determines the level of fire threat and fire risk
 Management Plan 2021 - 2026                   related interface management required for
                                               bushland reserves and foreshore reserves.
 Noosa Bushland Reserves Strategic             Outlines the values and management issues in
 Management Plan 2021 – 2026                   Council’s bushland reserve network, including
                                               foreshore reserves to help prioritise management
                                               responses.
 Noosa Coastal Hazards Adaptation Plan         Describes risks from coastal hazards including
 2021                                          erosion, storm tide and gradual sea level rise and
                                               identifies nature-based solutions as the preferred
                                               adaptation response to likely impacts. Includes a
                                               biodiversity vulnerability assessment and a cost-
                                               benefit analysis for the Eastern Beaches. These
                                               assessments identified the importance of dune
                                               revegetation, augmentation and management to
                                               maximise benefits of coastal foreshores for both
                                               human and natural systems.
 Noosa Walking and Cycling Strategy and        Some of the existing walking and cycle paths
 Implementation Plan 2020-2040                 pass through or alongside EBFRs. The plan
                                               guides the prioritisation of pathway
                                               improvements.




Eastern Beaches Foreshore Management Plan – Draft (V4 26.9.22 – for public consultation)      Page 44
Log in to download the original file

2022-11-14 GC Agenda - Item 3 - Attachment 1 - Draft Eastern Beaches Foreshore Management Plan(PDF, 3MB).pdf · 2.7 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.