Landscape works to include the following: Planting areas are to be filled with a premium grade blended organic garden soil ma to a Sutenntenden: to approve plant material prior to planting. Planting is tube Supply organic hoop pine mulch. Place mulch to a depth of 100 mm and rake to an even
minimum of 300 mm depth compliant with AS4419. Soil supplier, as well as irtended mu is to carried out in a manner consistent with good horticultural practice. All 300 surface SOmm below the surrounding finished levels. Avoid placement against green plant
• Excavation and drainage, including garden drainage to median stops
be nomiroted prior to start of works and approved by superintencent Sal isro be mounded pot and larger plant material is to be guyed and staked as per Tree Planting
stems and keep below street tree trunk flares. Soil laden tub grindings will not be
• Topsoil supply and placement tofacddace good drainage to hardaand areas (max 13 grade( and is to finish 150 mm below Detail Smaller plant stock is lobe staked as necessary. Slakes shall not pass
accepted. Mulch to finish SOmm below adjoining edging.
through the rootbali of plant at time of planting or any time thereafter.
• Turf supply and lay edging after settlement Organic additive such as'Dynamrc Lifter' is to be incorporated
throughout the soil mix at the recommended rate. A slow release fertiliser such as'Osmocote' Stock may be rejected if plarts are: STREET TREE EDGING
• Street tree planting area edging
or equivalent s also to be incorporated with indlwdual planting in accordance with the
• planting bed shaping a) undersized proportional to specified container site or if Street tree edging to be concrete edging.
manafacturersrecommendations To improve the water holding capacity or the dry and well
drained soils on she, the adding of a moisture holding product such as 'Hydrocell' on'Rainsaver' the root system is underdeveloped MAINTENANCE
• Contaisensed plant material - supply and installation
is recommended lolowmg manufacturers gudelines. b) oversized peoportiorul to sixecified Container size Of
• Organic mulch - supply and installation a) Monitor Owl performance and stress constantly and
severely root bound
• 12 month maintenance of landscape works take appropriate remedial action. Sod moisture levels
TDRf - SUPPLY AND LAY
c) rebalanced or urctaracterstic of normal or specified
Attendance at Council pre-start, an and off-mairizenance meetings are critical during early estabWAnwM.
Turf must be 'A' grade lien couch with nwumum Ted depth of 25 Minn. Turf must be installed growth pattern for the species
Contractor shag take full account of documentation of Curl Engineering Hydraulic and Electrical within Nhours of being rut Rurs mutt butt lord agamt exn drier and semstopdressed b) Mow turf fortragMy
Engineering Works. with topsoil Any depressions / damage within turf areas are to be replaced or top dressed wilt, d) not suitably acclimatised for the specific cl Prune, shrubs and thesis as required.
dean riser sued as erected by superintendent. e) diseased, adested with pests or suffering from other
Street Tr e Bed - Layout
all Remove al stakes at 90-day inspeetiorc
form of significant stress t) Fe1ise all plants at twee months
Break up and remove any debris from construction works to achieve required planting depths. f) tree stock is not compliant with NATSPEC Spec fining Trees and is not fl Replace damaged / failed trees and pants.
Excavate to bring the subsoil to a maximum of 370 mm below Hushed design levels Shape the Planting areas are to be finished In a gently mounded fashion to facikate drainage of excess certiled as compliant by levels Aeborist S) Reinstate arty damaged landscape works damaged during the maintenance period
subsoil to fall to subsoil drains where apphcab e. Break up tic subsoil to a bathe depth of 100 water and to show planting to best advantage. Contractor is to seek confirmation of finished
h) Contractor shad record inspections in a written log
mm Drainage s to be incorporated to a0 planting areas that are enclosed bynard edging and levels prior to final plantings and application of mulch
not otherwrse drained boot
Street Tree Detail - Bac Kerb Tree Detail - Proposed Park
turf
NAISPEC compliant tree stock with arbonM certification.
1 NAISPEC compliant tree stock with arborist certihcal on.
Species and pot size as per schedule Rootball mounded
Species and pot site as per schedule. Rootball mounded
100 1SCmm above suroundng finished level to facilitate
100 150mm above surrounding finished level to facilitate
improved drainage.
Improved drainage
2 100 mm composted forest mulch as specified avoiding contact
100 mm composted forest mulch as specified avoiding contact C
with tree stem
3
with tree stem
Eocavated planting hole 2x width of rootball with sloping sides,
Excavated planting hole 2x width of roolball with sloping sides, E
Mclilled with site soil mixed with imported AS4419 compliant
backfilled with site soil mixed with imported AS4419 compliant cV
topsoil. Soil gently mounded to lop of root plate.
topsoil Soil gently mounded to top of root plate.
4 Socked SOmm dia, agricultural pipe wrapped around base of
Socked 50mm dia agricultural pipe wrapped around base of
I Edge of path
rootball and connected to kerb subsoil drainage filter media, or
rootball and connected to kerb subsoil drainage filter media, or
sand / screenings drain connecting tree pit to kerb filtration
sand / screenings drain connecting tree pit to kerb filtration
media
5
media
Subsoil
Ughtly compacted soil under root package to prevent tree from
slumping
out
6 Lightly compacted soil under root package to prevent tree from
Provide spray edge
slumping
7 Concrete kerb to Eng. detail.
Road pauemenl
9
I Rub Filtration Material
10 IOOmm dU slotted PVC pipe
II Concrete Footpath / edge as specified or plans
NOTES:
Timber adding to be 50 x 10Dmm
dressed F f4 Hardwood Roiahed
flush with grassed area.
Trnbers shall be secured via
1 Selected garden bed mulch (100mm min treated timber stakes & galvlnbed gsdngs.
depth to finish 25mm below umbel edge Timbers to rest on compacted earth bed.
2 Dressed SO, IOOmn Hardwood edge
I Turf as specified
_ 1^11^11=III-I! 4 Topsoil as specified ^^c1 A
II-IE'\ -1 1 I I-III=1I EI I! ( 1=I I I^ I EI I S Compacted sib grade
_^ 11-I I EI I I-1TI-III-I I I 6 Treated Tnber Stake rill 50000m.
II II I I=111_1,1 I'=f 1=1E111-1ILIIIEIH11-111E11 11 Secured with Gal, decking, Screw through
pilot hole
7 planting area
-I I= I t--,I 1171 I I^ 11_I I ^1 11-J 1 I I-1 I I^ 11=i I
II^II-III ' I -11^I^I^ I ^11
-1 1111I1lI I^IF-IHIHIHI1=1IIlI1=1I1_I
-^ i ^ =!I I 1111'^II 11 IIII^T'I !'I_ -IIE^I i-Milli-II ! 1 IIH1la 11=_I
_T1=1 I I IEI I El I' ,,I I H
E 11EI
=1 1 111= I E- - ! I ^i l 1=1 I I= 1I^_II__ ___lI^_1-^1=ll Timber dging Detail
Check au dnmsion before commencement of work.
Chew Site bouroay dimensions from the Title Plans,
Check Baking Boundary clearances by set out
Notwthstondng the information supplied on this drawing,
the location, death and extent of underground or oreheod
services our to be confirmed and protected on site by the
contractor prior to commencement of works
Approved
Chec k ed - A.L. P Pro
i t - S ' et No.
CErnsulfingCNia :xny t:e BUNNINGS WAREHOUSE Prcer, 111246 LA05r-1 5
D e si gn - A , L . P D rawn - sew A^ S'ruclurol Engineers KEVIN COVEYBEng,CPEnq,MCAusl.M5PEPNO,RPEO-:823 LANDSCAPING Digital Ref _.00 0"l''iU^arr see
SPECIFICATIONS EUMUNDI NOOSA C
C 18-08-11 RESPONSE DEC NOT an C J'` V CHRIS CAMP E1Enq(nons),NlEkust,RPEO-494<
Scales - NITS Dcle - I,IAR D 18-os-I1 RESPONSE To FIR w Fl management 124 DLPORTN AVENUE Ph (07) 5443 7777 client ROAD, NOOSA
PD BOX 16 fox (07) 5443 7577
H. TROON PTY LTD
AS n-=s ° T,LT;
Doc u ment Sta ge APPROVAL ' 09-03-11 vduv^Nan ISSUE Planning MAROOCNYDORE OLD 4558
without the approval, nor shall it be
Develop Specified
ElyM
Landscap ng
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Response to Information Request OPW11/0299Related documentApplication case desk ↗
About this file
- File size
- 4.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.