4.5mm or 6mm AC sheeting to remain

   
      

10mm wide filler with tear off strip

 

 

 

First concrete pour ve concrete pour

 

 

 

“Dowel bar to be rotated following completion of first
concrete pour, removed, lubricated, reinserted into
pierced hole and retracted 10mm to provide void at end

OD FOR CONTINUOUS POURING

PROGRESSIVE POUR DIRECTION =>
SUGGESTED EXPANSION JOINT METH

CONSTRUCTION NOTES AND METHODS

~~

"1
12

14
5

7
18.

20
21

2

  
  

Reference AS 016)
Do not add water to the ready mixed concrete delivered to site
Maximum slump 80-100mm.
Membrane layer must be lapped 200mm, do not tape overlap.
Bar chair spacing maximum 600mm, reduce this spacing for lighter mesh (eg. SL62)
Bedding sand: minimum depth 20mm; maximum depth 40mm; nominal depth 25mm
Coloured concrete - colour must be incorporated in the concrete mix (ie, full depth colour)
Re-entrant corner - 2/N12 x {000mm long trimmer bars to be placed
Kerbing concrete; consider individual methods for hot and cold weather. In hot weather, incorporate
ALIPHATIC ALCOHOL or similar approved evaporation retardant.
Main Joint Types
- Isolation Joint: Ableflex to separate new concrete pour from existing structure such
as walls or kerb
- Expansion Joint: Ableflex or similar approved by Superintendent
- Construction Joint: Separates concrete pours
- Control Joint: Either "Formed Joint” or "Weakened Plane Joint”. Mesh must not
extend through a control joint. Used to control dry shrinkage cracks
Joint Angles: - must be in range 75° to 90° to joint
Joint Sealants (where used) - must adhere to sides of joint faces only, must not extend above
sides of joint onto slab surface
Saw Cut Joints
- must be between 1/4 & 1/3 of concrete pavement depth
- must be cleared of any debris from the cutting method
- must be saw cut within 6 to 12 hours of finishing concrete pour where ambient
temperature exceeds 25°c
= must be saw cut within 6 to 18 hours of finishing concrete pour where ambient
temperature is 25°c or lower
Mechanical vibration is strongly recommended for concrete slabs greater than 100mm depth
Concrete Curing
- use plastic sheets as first preference, otherwise a curing compound as approved by
the Superintendent
= minimum three {
= minimum seve

  

 

} days curing period

days before any loading applied unless otherwise directed or

approved by the Superintendent

Dowell bars must be installed to be exactly 90° to the face of the joint to allow thermal expansion
and contraction movement

Dowel bars to be hot dip galvanised in highly corrosive environments

Jointing layout to be approved by Superintendent prior to construction commencing, Layout to avoid
acute angles in the concrete slab and to avoid mismatched joints

Coarse broom finish with smooth edging minimum 5mm wide around all edges between expansion
joints only if ordered by the Superintendent.

Concrete thickness to be confirmed on site by the Superintendent following inspection of subgrade
Superintendent to determine if compacted gravel subgrade required or if unsuitable subgrade
material to be removed and replaced

Changes in width or direction on any concrete work to be constructed by way of curved form work
not by “kinks” or “bends” in form work as approved by the Superintendent

 

 

MESH COVER

 

TOP 30mm

 

SIDES 40mm

 

“0mm for formed joint

CONTROL JOINT SIDE 50mm for weakened plane joint

 

 

 

DOWEL BAR SCHEDULE

 

 

 

 

 

 

SLAB THICKNESS DIAM LENGTH SPACING
100mm 12mm 300 400
425mm 6mm 350 300
150mm 20mm 400 300
150 - 200mm 24mm 400 300

 

 

 

 

 

 

 

pour

{

\

Removable, slotted formwork for vertical release
and removal to enable subsequent concrete

Reinforcing 50450) Saw cut, insert or tooled joint
fabric r No sealeant required at top of joint
f, |

 

Joint depth

 

 

 

 

VARIES

 

 

‘Optional dowel for load transfer may
be added across the joint. Refer
dowel bar schedule for details

200u.m. moisture barrier dt
ordered by the Superintendent.

 

Linduced crack
SAW CUT JOINT
(CONTROL JOINT)

(Maximum spacing 4m)

Plain dowel bars, sawcut, free from burrs3

    

Sealant
25mm

 

Reinforcing— Sealant and filler types to be

fabric approved by Superintendent

mesh + oT
{ ¥ ¥ ¥ 7 ¥ = ) 4_P for

 

 

 

 

 

200um. moisture barrier it
ordered by the Superintendent

L2 2

L/2 + 30mm
Bond break d may be replaced Bond breaking | / \
ond breaking compound may be replacelk——$" Ps roand | | \
with a purpose made dowel sleeve. | 7 os}

EXPANSION JOINT

(Maximum spacing 12m)

 

\“tr watertight endcap.

 

3-N12 2.0m Long Reo

Stormwater Pit as specified (typical)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Omit trimmer bars where
joint intersection occurs -
typical

STORMWATER PIT REO DETAIL
(For all Pits)

PVC tube {tight fit to dowel)

Abutting structures

  
      
    

[Height to allow clearance to weep
or other pavement holes, flashings, damp proof
rs course or termite barriers etc
e|® Reinforcing
BS fabric V7.
5

 

 

 

Sealant to prevent

VARIES ingress of detritus

10mm thick compressible filler
material full depth of pavement

 

200u.m, moisture barrier if
ordered by the Superintendent.

ISOLATION JOINT

 

Reinforcing 401 140 |_—Optional cover strip. No
fabric | sealant required at top of
b, +

 

 

 

 

 

    

qf

VARIES

 

\

\-Proprietary pressed metal or formed
shear key joint to suit slab
thickness.

FORMED JOINT (WITH SHEAR KEY
(CONTROL JOINT)

(Maximum spacing] 100mm thick 2m / 150mm thick 4m)

200um, moisture barrier if
ordered by the Superintendent

 

       
  
 
  
   

Reinforcing Expansion Joint

fabric mesh /
/ ;-Plain dowel bars, sawcut,
free from burrs

 

200u.m. moisture barrier if /
ordered by the Superintendent

R10 ties @ 600 crs:

 

3F11TM

DRIVEWAY KEYWAYS

(Constructed where as directed by Site Superintendent)
(For driveways steeper than 13%)

 

   
  

LINDSAY CONSULTING 2
_ CAT tein ss

 

THIS DRAWING REMAINS HE PROPERTY OF
LINDSAY CONSULTING PTY LTD AND IS FOR
THE SOLE USE OF THE CLIENT. NO PART
MAY BE USED IN PART OR WHOLE WITHOUT
PRIOR EXPRESS WRITTEN CONSENT OF
LINDSAY CONSULTING PTY LTD

 

CLIENT AND PROJECT DESCRIPTION
GJ GARDNER NOOSA
PROPOSED RESIDENCE

NO.217 WEYBA ROAD
NOOSAVILLE

 

DRAWING TITLE

OPERATIONAL WORKS
DRIVEWAY DETAILS

 

SCALES

 

SURVEY DATUM

 

ASSOCIATED CONSULTANTS

 

 

REVISION LIST
A

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

ORIGINAL ISSUE 20/06/24
B
C
‘omputer Fle
2400450W.DWG
DRAWING NUMBER SHEET] REV.

24-0045-C10 10) A

 

 

 

 

 

 

 
Log in to download the original file

Appendix B - Engineering Plans.pdf · 4.3 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.