Appendix B - Engineering Plans
Plans and drawings: the text below has words only, no drawings.
4.5mm or 6mm AC sheeting to remain
10mm wide filler with tear off strip
First concrete pour ve concrete pour
“Dowel bar to be rotated following completion of first
concrete pour, removed, lubricated, reinserted into
pierced hole and retracted 10mm to provide void at end
OD FOR CONTINUOUS POURING
PROGRESSIVE POUR DIRECTION =>
SUGGESTED EXPANSION JOINT METH
CONSTRUCTION NOTES AND METHODS
~~
"1
12
14
5
7
18.
20
21
2
Reference AS 016)
Do not add water to the ready mixed concrete delivered to site
Maximum slump 80-100mm.
Membrane layer must be lapped 200mm, do not tape overlap.
Bar chair spacing maximum 600mm, reduce this spacing for lighter mesh (eg. SL62)
Bedding sand: minimum depth 20mm; maximum depth 40mm; nominal depth 25mm
Coloured concrete - colour must be incorporated in the concrete mix (ie, full depth colour)
Re-entrant corner - 2/N12 x {000mm long trimmer bars to be placed
Kerbing concrete; consider individual methods for hot and cold weather. In hot weather, incorporate
ALIPHATIC ALCOHOL or similar approved evaporation retardant.
Main Joint Types
- Isolation Joint: Ableflex to separate new concrete pour from existing structure such
as walls or kerb
- Expansion Joint: Ableflex or similar approved by Superintendent
- Construction Joint: Separates concrete pours
- Control Joint: Either "Formed Joint” or "Weakened Plane Joint”. Mesh must not
extend through a control joint. Used to control dry shrinkage cracks
Joint Angles: - must be in range 75° to 90° to joint
Joint Sealants (where used) - must adhere to sides of joint faces only, must not extend above
sides of joint onto slab surface
Saw Cut Joints
- must be between 1/4 & 1/3 of concrete pavement depth
- must be cleared of any debris from the cutting method
- must be saw cut within 6 to 12 hours of finishing concrete pour where ambient
temperature exceeds 25°c
= must be saw cut within 6 to 18 hours of finishing concrete pour where ambient
temperature is 25°c or lower
Mechanical vibration is strongly recommended for concrete slabs greater than 100mm depth
Concrete Curing
- use plastic sheets as first preference, otherwise a curing compound as approved by
the Superintendent
= minimum three {
= minimum seve
} days curing period
days before any loading applied unless otherwise directed or
approved by the Superintendent
Dowell bars must be installed to be exactly 90° to the face of the joint to allow thermal expansion
and contraction movement
Dowel bars to be hot dip galvanised in highly corrosive environments
Jointing layout to be approved by Superintendent prior to construction commencing, Layout to avoid
acute angles in the concrete slab and to avoid mismatched joints
Coarse broom finish with smooth edging minimum 5mm wide around all edges between expansion
joints only if ordered by the Superintendent.
Concrete thickness to be confirmed on site by the Superintendent following inspection of subgrade
Superintendent to determine if compacted gravel subgrade required or if unsuitable subgrade
material to be removed and replaced
Changes in width or direction on any concrete work to be constructed by way of curved form work
not by “kinks” or “bends” in form work as approved by the Superintendent
MESH COVER
TOP 30mm
SIDES 40mm
“0mm for formed joint
CONTROL JOINT SIDE 50mm for weakened plane joint
DOWEL BAR SCHEDULE
SLAB THICKNESS DIAM LENGTH SPACING
100mm 12mm 300 400
425mm 6mm 350 300
150mm 20mm 400 300
150 - 200mm 24mm 400 300
pour
{
\
Removable, slotted formwork for vertical release
and removal to enable subsequent concrete
Reinforcing 50450) Saw cut, insert or tooled joint
fabric r No sealeant required at top of joint
f, |
Joint depth
VARIES
‘Optional dowel for load transfer may
be added across the joint. Refer
dowel bar schedule for details
200u.m. moisture barrier dt
ordered by the Superintendent.
Linduced crack
SAW CUT JOINT
(CONTROL JOINT)
(Maximum spacing 4m)
Plain dowel bars, sawcut, free from burrs3
Sealant
25mm
Reinforcing— Sealant and filler types to be
fabric approved by Superintendent
mesh + oT
{ ¥ ¥ ¥ 7 ¥ = ) 4_P for
200um. moisture barrier it
ordered by the Superintendent
L2 2
L/2 + 30mm
Bond break d may be replaced Bond breaking | / \
ond breaking compound may be replacelk——$" Ps roand | | \
with a purpose made dowel sleeve. | 7 os}
EXPANSION JOINT
(Maximum spacing 12m)
\“tr watertight endcap.
3-N12 2.0m Long Reo
Stormwater Pit as specified (typical)
Omit trimmer bars where
joint intersection occurs -
typical
STORMWATER PIT REO DETAIL
(For all Pits)
PVC tube {tight fit to dowel)
Abutting structures
[Height to allow clearance to weep
or other pavement holes, flashings, damp proof
rs course or termite barriers etc
e|® Reinforcing
BS fabric V7.
5
Sealant to prevent
VARIES ingress of detritus
10mm thick compressible filler
material full depth of pavement
200u.m, moisture barrier if
ordered by the Superintendent.
ISOLATION JOINT
Reinforcing 401 140 |_—Optional cover strip. No
fabric | sealant required at top of
b, +
qf
VARIES
\
\-Proprietary pressed metal or formed
shear key joint to suit slab
thickness.
FORMED JOINT (WITH SHEAR KEY
(CONTROL JOINT)
(Maximum spacing] 100mm thick 2m / 150mm thick 4m)
200um, moisture barrier if
ordered by the Superintendent
Reinforcing Expansion Joint
fabric mesh /
/ ;-Plain dowel bars, sawcut,
free from burrs
200u.m. moisture barrier if /
ordered by the Superintendent
R10 ties @ 600 crs:
3F11TM
DRIVEWAY KEYWAYS
(Constructed where as directed by Site Superintendent)
(For driveways steeper than 13%)
LINDSAY CONSULTING 2
_ CAT tein ss
THIS DRAWING REMAINS HE PROPERTY OF
LINDSAY CONSULTING PTY LTD AND IS FOR
THE SOLE USE OF THE CLIENT. NO PART
MAY BE USED IN PART OR WHOLE WITHOUT
PRIOR EXPRESS WRITTEN CONSENT OF
LINDSAY CONSULTING PTY LTD
CLIENT AND PROJECT DESCRIPTION
GJ GARDNER NOOSA
PROPOSED RESIDENCE
NO.217 WEYBA ROAD
NOOSAVILLE
DRAWING TITLE
OPERATIONAL WORKS
DRIVEWAY DETAILS
SCALES
SURVEY DATUM
ASSOCIATED CONSULTANTS
REVISION LIST
A
ORIGINAL ISSUE 20/06/24
B
C
‘omputer Fle
2400450W.DWG
DRAWING NUMBER SHEET] REV.
24-0045-C10 10) A
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.