OPEN CONCRETE BLOCKS

 

GRAVEL FILTER

NaN OVERLAP 4.0m MIN.

ONTO KEf

  
  
   
    

RUNOFF

 

600mm (xoM) GAP
BETWEEN SAND BAGS
ACT AS SPILLWAY
THREE LAYERS OF.
SANDBAGS WITH ENDS.
OVERLAPPED.
DOWN STREAM GULLY PROTECTION DETAILS

NOT TO SCALE

BURY THE TOP OF THE PLASTIC
IN TRENCH MIN 300mm DEEP.
STAPLE AT 150mm CENTRES.
COMPACT SOIL OVER BLANKET

CENTRELINE SECTION AT POINTS "A
FILL TRENCH WITH SOIL
AND COMPACT

OVERLAP—BURY UPPER END OF
LOWER BLANKET AS IN “A”. OVERLAP.
END OF TOP BLANKET 300mm AND
STAPLE AT 150 CRS.

STAPLES: 8 GAUGE
(4mm) WIRE

CENTRELINE SECTION AT POINTS "B”
Peng

STAPLE BLANKETS
AT GRID OF
1m CENTRES

STAPLE OUTSIDE EDGES
o AT 300mm CRS.

CLEAN/DIRTY DIVERSION DRAINS

DIVERSION DRAIN CONSTRUCTION NOTES

4.

5.

1, REMOVE ANY ROCKS, CLODS, STICKS OR GRASS FROM THE SURFACE BEFORE LAYING PLASTIC.
2.
3. ENSURE PLASTIC WILL BE CONTINUOUSLY IN CONTACT WITH THE SOIL BY GRADING THE SURFACE,

ENSURE THAT TOPSOIL IS AT LEAST 75mm DEEP.

CAREFULLY FIRST.

LAY FABRIC IN "SHINGLE FASHION”, WITH THE END OF EACH UPSTREAM ROLL OVERLAPPING THOSE
DOWNSTREAM. ENSURE EACH ROLL IS ANCHORED PROPERLY AT ITS UPSLOPE END.

ENSURE FULL WIDTH OF FLOW CHANNEL IS COVERED BY THE PLASTIC.

Unbound pavement material (gravel) to Grading
B, Table 9 of QT Specification MRS11.05,
exclude material finer than sieve 2.36mm

GEOFABRIC FABRIC, BIDIM A34
OR SIMILAR

e
RUNOFF TO BE DIRECTED TO A SEDIMENT TRAP,
REFER STANDARD DRAWING D-0041

SEDIMENT AND EROSION
CONTROL DETAILS

 

 

 

ALL EROSION AND SEDIMENT IN ACCORDANCE WITH IN ACCORDANCE WITH
WITH MAROON BOOK MANUAL FOR EROSION AND SEDIMENT CONTROL

 

UNDISTURBED AREA

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SPB poe snes Coy
RUNOFF WATER DROP INLET y V \ y
WITH SEDIMENT

1. Ada DISTURBED

. 4 tea GEOTEXTILE. —# NV DIRECTION OF’ FLO
BURIED FABRIC “| Water FILTER FABRIC

 

 

 

 

 

 

 

 

 

 

GEOTEXTILE INLET FILTER
GEOTEXTILE INLET FILTER CONSTRUCTION NOTES

1. FABRICATE A SEDIMENT BARRIER FROM GEOTEXTILE.

2. FOLLOW DETAIL FOR SEDIMENT FENCE FOR GEOFABRIC
INSTALLATION. REDUCE PICKET SPACINGS TO 1m CENTRES.

3. DO NOT COVER THE INLET WITH GEOTEXTILE UNLESS THE
DESIGN IS ADEQUATE TO ALLOW FOR ALL WATERS TO.
BYPASS IT.

  
 
 
  

Berm (300mm MIN height)

Geotextile fabric, —7

Bidum U34 or similar

 

GEOTEXTILE FILTER FABRIC

 

   

 

 

 

 

 

STAKES DRIVEN INTO GROUND —__

&
Qe

 

    

 

 

 

HOLD IN PLACE
WITH SAND BAGS

 
 
 
 

GEOTEXTILE FILTER SOCK
FILLED WITH 25MM GRAVEL

KERB INLET PIT SEDIMENT BARRIER

1.5m TIMBER STAKES
AT MAX 2.5m CENTRES

SELF—SUPPORTING
GEOTEXTILE

 

 

a

500mm TO 600mm

DIRECTION OF
FLOW
=

 

600mm MIN

Runoff from pad directed to sediment trap

TEMPORARY CONSTRUCTION ENTRY/EXIT SEDIMENT TRAP

Not to Scale

CATTLE GRID 3.0m NOM WIDTH
SET 300mm ABOVE GROUND

   

CONSTRUCTION SITE

1

2.
TEMPORARY ENTRY/EXIT 3
TEMPORARY ENTRY/EXIT CONSTRUCTION NOTES 4
STRIP THE TOPSOIL, LEVEL THE SITE AND COMPACT THE SUBGRADE. 5

1.
2.
3.
4,

5.

COVER THE AREA WITH NEEDLE—-PUNCHED GEOTEXTILE.

CONSTRUCTION A 200mm THICK PAD OVER THE GEOTEXTILE USING ROAD BASE OR 30mm.
ENSURE THE STRUCTURE IS AT LEAST 15m LONG OR TO BUILDING ALIGNMENT AND AT
LEAST 3m_ WIDE.

WHERE SEDIMENT FENCE JOINS ONTO THE STABILISED ACCESS, CONSTRUCTION A HUMP OR
GRATE IN THE STABILISED ACCESS TO DIVERT WATER TO THE SEDIMENT FENCE.

 

 

ON SOIL, 150mm x 100mm
TRENCH WITH COMPACTED
BACKFILL AND ON ROCK, SET
INTO SURFACE CONCRETE

SECTION DETAIL

KERB INLET PIT SEDIMENT BARRIER
CONSTRUCTION NOTES

FABRICATE A SLEEVE FROM GEOTEXTILE OR WIRE MESH
LONGER THAN THE LENGTH OF THE INLET PIT AND FILL
WITH 25mm TO SOmm GRAVEL.

FORM AN ELLIPTICAL CROSS—SECIRCUITION APPROX.
HIGH, 400mm WIDE.

PLACE THE FILTER AT OPENING LEAVING AT LEAST
100mm BETWEEN KERB INLET AND SLEEVE. MAINTAIN
OPENING WITH SPACER BLOCKS.

FORM A SEAL WITH KERB TO PREVENT SEDIMENT
BYPASS.

SANDBAGS FILLED WITH GRAVEL CAN SUBSTITUTE FOR
THE MESH OR GEOTEXTILE PROVIDED THEY ARE PLACED
SO THAT THEY FIRMLY ABUT EACH OTHER AND.
SEDIMENT LADEN WATERS CANNOT PASS BETWEEN

150mm

  
 
   
   
 

VV Vv

   
   
 
    
  

1.5m TIMBER STAKES
AT MAX 2.5m CENTRES

SEDIMENT FENCE

e

‘SEDIMENT

NOTE: POINTS @ AT SAME
ELEVATION

SEDIMENT FENCES

Sediment Fence installed across the contour,
~ uncontoured concentration of flow should be avoided
NOT TO REGULAR SCALE

;SEDIMENT FENCE CONSTRUCTION NOTES

1. CONSTRUCTION SEDIMENT FENCES AS CLOSE AS
POSSIBLE TO BEING PARALLEL TO THE CONTOURS OF THE
SITE, BUT WITH SMALL RETURNS. THE CATCHMENT AREA.
SHOULD BE SMALL ENOUGH TO LIMIT WATER FLOW IF
CONCENTRATED AT ONE POINT.

2. CUT A 150—-mm DEEP TRENCH ALONG THE UPSLOPE
LINE OF THE FENCE FOR THE BOTTOM OF THE FABRIC TO
BE ENTRENCHED.

3. DRIVE TIMBER STAKES INTO GROUND AT 2.5m
INTERVALS (MAX) AT THE DOWNSLOPE EDGE OF THE TRENCH.
4. — FIX SELF—SUPPORTING GEOTEXTILE TO THE UPSLOPE
SIDE OF THE POSTS ENSURING IT GOES TO THE BASE OF
THE TRENCH. FIX THE GEOTEXTILE WITH WIRE RECOMMENDED
BY THE MANUFACTURER. THE USE OF SHADE CLOTH FOR
THIS PURPOSE IS NOT SATISFACTORY.

5. JOIN SECTIONS OF THE FABRIC AT A SUPPORT POST
WITH A 150mm _ OVERLAP.

6. BACKFILL THE TRENCH OVER THE BASE OF THE FABRIC
AND COMPACT IT THOROUGHLY OVER THE GEOTEXTILE.

PIY

LINDSAY CONSULTING 2
CLI

   

REO 4928.

  
   

 

OFF. 2¢/82 PARKER ATREET, MAROOGAYDDRE PH

 

THIS DRAWING REMAINS HE PROPERTY OF
LINDSAY CONSULTING PTY LTD AND IS FOR
THE SOLE USE OF THE CLIENT. NO PART
MAY BE USED IN PART OR WHOLE WITHOUT
PRIOR EXPRESS WRITTEN CONSENT OF
LINDSAY CONSULTING PTY LTD

 

CLIENT AND PROJECT DESCRIPTION
GJ GARDNER NOOSA
PROPOSED RESIDENCE

NO.217 WEYBA ROAD
NOOSAVILLE

 

DRAWING TITLE

SEDIMENT & EROSION
DETAILS

 

SCALES

 

SURVEY DATUM

 

ASSOCIATED CONSULTANTS

 

 

REVISION LIST
A

ORIGINAL ISSUE 20/06/24

 

B

 

C

 

 

 

 

 

 

 

 

 

 

 

 

 

fomputer File

2400450W.DWG

 

DRAWING NUMBER SHEET] REV.

24-0045-C6 6A

 

 

 

 

 

 

 
Log in to download the original file

Appendix B - Engineering Plans.pdf · 4.3 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.