Original source · versioned page text
MCU23/0090 Application For Material Change Of Use – Hotel (Extension To Existing Hotel) And DBW23/0073 - Building Work (Demolition) At 118 Poinciana Ave & 26 Diyan St, Tewantin · Attachment 3 – (MCU23/0090 & DBW23/0073) - Proposal Plans
Plans and drawings: the text below has words only, no drawings.
Very large file (23.3 MB): may take a few minutes to open.
Original PDF page 13, section 1. The text section number identifies this passage in the reader.
MATERIAL LEGEND
CODE DESCRIPTION IMAGE
DULUX ACRATEX SIENNA NATURAL
RN-01
TEXTURED RENDER. A CRASHIELD TOP
COAT
COLOUR CODE: WHITE POLAR SW1C5
PC-01 DULUX DURALLOY SOLID COLOUR
RANGE.
COLOUR: NATURAL WHITE
COLOUR CODE: 272380M
NEW PERGOLA FULL HT SOLID NEW SIGNAGE IN UP AND DOWN 2800MM HIGH PE-01 PERGOLA RENDER FINISH
STRUCTURE ACOUSTIC WALL POWDERCOATED LIGHTING ACOUSTIC WALL STRUCTURE WITH TO NEW WALL DULUX EXTERNAL WEATHERSHIELD
IN TIMBER FINISH FINISH. PINNED OFF FIXTURES
PERGOLA 2 ROOF LINE LIGHTWEIGHT ROOF
PA-18
PERGOLA ROOF LINE RL +14,257 LOW SHEEN.
WITH TRANSLUCENT FACADE, FRONT AW-01
COLOUR CODE: TO MATCH RN01
LASERLITE ROOF RL +13,903 ILLUMINATED AW-02
(WHITE POLAR SW1C5)
PE-01 AW-01
BEER GARDEN PERGOLA STRUCTURE,
PE-01
ROOF FASCIA, ROOF BEAM AND
COLUMN.
DULUX POWDERCOAT:
RN-01 RN-01 RN-01 RN-01 RN-01 RN-01 RN-01 RN-01 RN-01 RN-01 RN-01
COLOUR CODE: TERRAIN GM243A
GROUND FLOOR
3105
SATIN
10.780 m RN-01
2000
BEER GARDEN ROOF:
BEER GARDEN AW-01
LASERLITE 2000 GRECA
10.000 m COLOUR: CLEAR
PARKING
9.800 m
BEER GARDEN ENTRY
BEER GARDEN ROOF:
LIQUORLAND DRIVEWAY AW-02
COLORBOND ROOFING TRIMDEK
8.810 m SHEET:
FINISH: COLOURBOND SURFMIST
NORTH BEER GARDEN FENCING:
TM-04
SPOTTED GUM TIMBER FINISH TO TOP
RAIL WITH STAINLESS STEEL ROD
1 PROPOSED BEER GARDEN ELEVATION. RAILING
-- 1 : 100
BEER GARDEN WINDOW:
G-01
TOUGHENED CLEAR GLASS GLAZING
BY CONTRACTOR
C:\Users\dexter.dionisio\Documents\AVC0013 - Royal Mail Hotel_DA 20250204_dexter.dionisio.rvt
PLANNING APPROVAL
NOT FOR CONSTRUCTION
0 0.5 2.0 4.0 5.0
SCALE IN METRES
Rev Description By Date Project Name Project No. Drawn
1 FOR COORDINATION DD 30.01.2023
AVC0013 Author
2 TOWN PLANNING ISSUE DD 16.06.2023
ROYAL MAIL HOTEL
Date Checked
3 TOWN PLANNING ISSUE DD 05.07.2023 Site Address
OCT 2024 Checker
4 TOWN PLANNING ISSUE DD 07.07.2023 Scale Certified
120 POINCIANA AVE, TEWANTIN QLD 4565, AUSTRALIA 1 : 100 @ A1 R. OVCARIC
4/02/2025 2:37:54 PM
5 FOR INFORMATION DD 21.03.2024
6 FOR INFORMATION DD 04.04.2024 Drawing Title Drawing No. Revision
7 TOWN PLANNING ISSUE DD 30.08.2024
8 DA -REVISED TOWN PLANNING RO 24.09.2024
9 REVISED TOWN PLANNING ISSUE DD 03.02.2025 PROPOSED EXTERNAL TP11 10
10 REVISED TOWN PLANNING ISSUE - CARPARKING DD 04.02.2025
ELEVATIONS
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.