7. Attachment F - Bushfire Hazard Assessment

of 47

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

SOLUTIONS

Bushfire Hazard Assessment and
Management Plan

199 Beddington Road, Doonan

Prepared for Katie Rose Cottage Hospice

Prepared by:

Green ‘J ape

SOLUTIONS -

Green Tape Solutions / ABN 20 162 130 627
PO BOX 282, Morayfield, QLD, 4506 / PO BOX 416 Rockhampton, QLD, 4700
Telephone: 07 5428 6372 / Email: [email protected]
www.greentapesolutions.com.au
Log in to download the original file

7. Attachment F - Bushfire Hazard Assessment.pdf · 3.8 MB (large file)

The download may take up to a minute.

Full text of the other 46 pages

Page 2

                                                          Bushfire Hazard Assessment and Management Plan




DISCLAIMER

Apart from fair dealing for the purposes of private study, research, criticism, or review as permitted under
the Copyright Act, no part of this report, its attachments or appendices may be reproduced by any
process without the written consent of Green Tape Solutions.

Green Tape Solutions has prepared this report for the sole purposes of the Client. This report is strictly
limited to the purpose and the facts and matters stated in it and does not apply directly or indirectly and
will not be used for any other application, purpose, use or matter. The reproduction, adaptation, use or
communication of the information contained within this report may not be used without the written
permission of Green Tape Solutions.

In preparing this report we have assumed that all information and documents provided to us by the
Client, or as a result of a specific request or enquiry, were complete, accurate and up-to-date. Where
we have obtained information from a government register or database, we have assumed that the
information is accurate. Where an assumption has been made, we have not made any independent
investigations with respect to the matters the subject of that assumption. We are not aware of any reason
why any of the assumptions are incorrect.

In this note, a reference to loss and damage includes past and prospective economic loss, loss of profits,
damage to property, injury to any person (including death) costs and expenses incurred in taking
measures to prevent, mitigate or rectify any harm, loss of opportunity, legal costs, compensation,
interest and any other direct, indirect, consequential or financial or other loss.

Document Records - Quality



 TITLE        Bushfire Hazard Assessment and Management Plan for 199 Beddington Road, Doonan.



 FILED AS     PR20258_BHAMP_199 Beddington Road, Doonan_VerA




                                   Prepared by                 Reviewed by              Approved by
  Revision        Date
                                    (name/title)               (name/ title)             (name/title)


                                    Jacob Gack               Richard Hanson,
 Version A     17/02/2023                                                                   Client
                                Graduate Ecologist           Senior Ecologist


                                    Jacob Gack               Richard Hanson,
 Version B     10/10/2023                                                                   Client
                                Graduate Ecologist           Senior Ecologist




                                                   PR22428_BHAMP_199 Beddington Road, Doonan            Page ii

Page 3

                                                                                   Bushfire Hazard Assessment and Management Plan



Table of Contents
  1.1        Background ............................................................................................................................... 2
  1.2        Site Description ......................................................................................................................... 2
  1.3        Scope of Work ........................................................................................................................... 3
  1.4        Qualifications and Experience .................................................................................................. 3

  2.1        State Planning Policy (SPP) ..................................................................................................... 5
  2.2        Noosa Plan 2020 ....................................................................................................................... 6
  2.3        AS3959:2018 Construction of Buildings in Bushfire Prone Areas ............................................ 7

  3.1     Hazard Assessment .................................................................................................................. 8
     3.1.1     Step 1 – Fire Weather Severity.......................................................................................... 9
     3.1.2     Step 2 - Vegetation Hazard Classes and Potential Fuel Loads ........................................ 9
       3.1.2.1     Vegetation Hazard Classes ........................................................................................ 9
       3.1.2.2     Potential Fuel Loads ................................................................................................. 15
     3.1.3     Step 3 - Site and Effective Slope ..................................................................................... 15
     3.1.4     Step 4 - Remodelling of Bushfire Hazard ........................................................................ 16
  3.2     Radiant Heat Exposure and Bushfire Attack Levels ............................................................... 18

  4.1    Agencies / Persons Responsible ............................................................................................ 21
  4.2    Owner / Occupier Responsibilities .......................................................................................... 21
  4.3    Reporting and Auditing ........................................................................................................... 21
  4.4    Siting of Buildings.................................................................................................................... 22
  4.5    Asset Protection Zones ........................................................................................................... 22
  4.6    Access and egress .................................................................................................................. 23
  4.7    Electricity Supply ..................................................................................................................... 24
  4.8    Water Supply ........................................................................................................................... 24
  4.9    Climate Change and Fire Weather – Projections for 2050 ..................................................... 24
  4.10 Emergency Response Procedures ......................................................................................... 24
  4.11 Emergency Information Providers ........................................................................................... 24
  4.12 Local Resources ..................................................................................................................... 25
     4.12.1 Queensland Fire and Emergency Services (QFES) Stations. ......................................... 25
     4.12.2 Neighbourhood Safe Places and Evacuation Centres. ................................................... 25




Appendix 1 ............................................................................................................................................. 33
Appendix 2 ............................................................................................................................................. 34

FIGURES

Figure 1 Site location (Source: Queensland Globe). ............................................................................... 3
Figure 2 Excerpt from DSDMIP SPP IMS – Bushfire prone area (Source: DSDMIP SPP IMS). ............ 6
Figure 3 Excerpt from Noosa Plan 2020 – Bushfire hazard overlay (Source: NSC IntraMaps 9, 2023). 7
Figure 4 State-mapped Vegetation hazard Classes (VHCs). ................................................................ 13
Figure 5 Ground-truthed Vegetation Hazard Classes (VHCs). ............................................................. 14
Figure 6 Bushfire Attack Levels ............................................................................................................. 20

TABLES

Table 1: Property Information .................................................................................................................. 2
Table 2: Potential fuel loads for classified vegetation within 150 m assessment area. ........................ 15
Table 3: Slope angles for assessable fire runs to the development site ............................................... 16
Table 4: Potential fireline intensity ranges and bushfire hazard classes .............................................. 16
Table 5: Potential fireline intensity for classified VHCs within 150 m assessment area ....................... 17
Table 6: Determination of Bushfire Attack Level (BAL) minimum separation distances for bushfire-
    prone vegetation............................................................................................................................. 19
Table 7: Assessment against the Noosa Plan 2020 – Bushfire Hazard Overlay Code. ....................... 27



                                                                      PR22428_BHAMP_199 Beddington Road, Doonan                                  Page iii

Page 4

                                                                            Bushfire Hazard Assessment and Management Plan



PLATES

Plate 1: Proposed development site location. Facing north east towards maintained gardens. ........... 11
Plate 2: VHC 42.6 – Beddington Road to the west of the site. Facing north. ....................................... 11
Plate 3: Vegetation Community 1 – 4 metre buffer of unmanaged vegetation on neighbour’s boundary
     to the site, before mowed grounds and gardens. ........................................................................... 12
Plate 4: Vegetation Community 1 hazardous vegetation to the east of the development’s location.
     Facing North East. (VHC 8.1) ........................................................................................................ 12
Plate 5: Ground cover and leaf litter on the road reserve. Facing East (VHC 39.2). ............................ 12
Plate 6: Vegetation on the road reserve to the east of the site. (VHC8.1). Facing North East. ............ 12
Plate 7: VHC 39.2 – Vegetation to the north of the site on neighbouring lot. Facing North East. ......... 12
Plate 8: Vegetation to the east of the site (VHC 8.1) ............................................................................ 12




                                                               PR22428_BHAMP_199 Beddington Road, Doonan                           Page iv

Page 5

                                                 Bushfire Hazard Assessment and Management Plan




Acronyms and Glossary

Terms           Definitions

APZ             Asset Protection Zone

BAL             Bushfire Attack Level

BHA             Site-specific bushfire hazard assessment

BMP             Bushfire Management Plan

BPA             Bushfire Prone Areas

DCCEEW          Department of Climate Change, Energy, the Environment and Water (Cwth)

DES             Department of Environment and Science (QLD)

DOR             Department of Resources (QLD)

DSDILGP         State Development, Infrastructure, Local Government and Planning (QLD)

ERP             Emergency Response Plan

GTRE            Ground-truthed regional ecosystem

HSE             Health Safety and Environment

IPA             Inner Protection Area

OPA             Outer Protection Area

QFES            Queensland Fire Emergency Services

RE              Regional ecosystem

SARA            State assessment and referral agency

SDAP            State development assessment provisions

                Refers to the area within which development, over- and under-ground
Site
                services, access tracks and other associated infrastructure may be located.

Site boundary   The extent of the properties that the project is located within

SPP             State Planning Policy

VM Act          Vegetation Management Act 1999 (Qld)




                                        PR22428_BHAMP_199 Beddington Road, Doonan       Page 1

Page 6

                                                          Bushfire Hazard Assessment and Management Plan




1      Introduction
1.1 Background

Green Tape Solutions was engaged by Katie Rose Cottage Hospice to prepare a bushfire hazard
assessment and management plan (BHAMP) for a property located at 199 Beddington Road, Doonan
(described as Lot 6 on RP225627 and referred to as the ‘site’).

This report has been prepared for a development application for the construction of a new care wing at
Katie Rose Cottage Hospice. The development will introduce five (5) new beds into the hospice and
provide the facilities to manage the End-of-Life Care within the facility. The development will also involve
the constructions of tranquil gardens and spaces for the clients.

The site currently supports an existing dwelling and associated outbuildings and structures, including
sheds and an external office. The current house supports capacity for three (3) clients, this building will
be reclassified for administration use. Access to the site is provided by an entry and exit access onto
Beddington Road.

The new wing has been proposed to come off the existing dwelling on the southern side of the building.
The development has been designed to primarily utilise existing cleared areas; however, some removal
of vegetation may be required. The proposed development layout is provided in Appendix 1.

1.2 Site Description

The site is located on a single lot comprising a total area of approximately 10, 680 m2 (1.068 ha) within
the Noosa Council (NSC) local government area (Figure 1). The site is bounded by Beddington Road
that runs along the western boundary and surrounded by similar sized low-density vegetated rural
residential lots.

The site has been historically cleared for the development of the existing house and lawns, a small
orchard and several gardens. The site has retained remnant native vegetation across the property, a
large has been retained to the back of the lot. A more detailed description of the vegetation communities
within and surrounding the site is provided in Section 3.1.2

Table 1 provides the detail of the development site. Figure 1 depicts the location of the site.’

                                       Table 1: Property Information

                     Address              199 Beddington Road, Doonan.

                     Lot / Plan           Lot 6 on RP225627

                     Area (m2)            10, 680 m2 (1.068 ha)

                     LGA                  Noosa Council

                     Zone                 Rural Residential




                                                 PR22428_BHAMP_199 Beddington Road, Doonan           Page 2

Page 7

                                                        Bushfire Hazard Assessment and Management Plan




                            Figure 1 Site location (Source: Queensland Globe).

1.3 Scope of Work

The purpose of this BHAMP is to provide a site-specific assessment of bushfire hazard and to assess
compliance of the proposed development with the outcomes sought by the Noosa Council Planning
Scheme 2020 (Noosa Plan 2020), in particular the assessment benchmarks outlined in the Bushfire
hazard overlay code. The BHAMP also provides a plan for bushfire risk management including building
construction requirements, asset protection zones, fuel management, access requirements and
emergency responses measures. Recommendations are consistent with legislative requirements to
reduce the risk to life and property.

1.4 Qualifications and Experience

The Queensland Fire and Emergency Service (QFES) Bushfire Resilient Communities Technical
Reference Guide for the State Planning Policy State Interest ‘Natural Hazards, Risk and resilience –
Bushfire’ October 2019 (‘BRC Technical Guide’) (QFES, 2019) provides guidance on suitably qualified
people for assessments identified in the BRC Technical Guide. This guidance includes the following
recommendations:

    •   Fine-scale assessment of vegetation communities in accordance with the ‘Vegetation Hazard
        Class’ assessment methodology be undertaken by a suitably qualified person with experience
        in botanical survey methods; and

    •   Applicant-initiated assessments and reports be prepared or peer-reviewed by suitably qualified
        and experienced people with degree (AQF Level 8) qualifications in environmental science,
        environmental management (or an equivalent discipline), demonstrated experienced in




                                                PR22428_BHAMP_199 Beddington Road, Doonan      Page 3

Page 8

                                                        Bushfire Hazard Assessment and Management Plan



        botanical surveys and spatial analysis methods, including use of geographic information
        systems (GIS) software); demonstrated experience in the assessment of bushfire hazard and
        risks or technical qualifications in environmental science, environmental management (or and
        equivalent discipline) and demonstrated relevant industry experience in the assessment of
        bushfire hazard and risks for a minimum of five years.

The author of this report meets QFES’ criteria as follows:

    •   possesses knowledge and experience in applying relevant legislation, plans, policies, standards
        and guidelines relating to bushfire hazard and fire ecology relating to Queensland requirements
        and South-east Queensland conditions;

    •   has knowledge, experience in botanical survey methods and GIS analysis and at least 5 years’
        experience in undertaking bushfire hazard assessment and preparing bushfire management
        plans, including experience in undertaking fine-scale assessment of vegetation communities
        and application of the QFEs Bushfire Hazard Assessment methodology outlined in the BRC
        Technical Guide; and

    •   has qualifications and experience in the field of ecology, environmental management or similar
        to assess and protect site-based and strategic biodiversity values relating to South-east
        Queensland.




                                               PR22428_BHAMP_199 Beddington Road, Doonan        Page 4

Page 9

                                                       Bushfire Hazard Assessment and Management Plan




2       Bushfire Regulatory Framework
Given that bushfire hazard can cause harm to people and social wellbeing, damage to property and
impacts to the economy and environment, the management of bushfire hazard in Queensland is
considered an integral component of land use planning and development decisions.

There are three regulatory mechanisms/instruments applicable to the site that regulate development to
avoid and mitigate potential impacts associated with bushfire hazard:

    •   State Planning Policy (SPP) and associated guidelines (Department of Infrastructure‚ Local
        Govenment and Planning (DILGP), July 2017);

    •   Noosa Plan 2020 (Noosa Council Council, 2020); and

    •   Australian Standard AS3959:2018 – Construction of Buildings in Bushfire-prone Areas
        (Standards Australia, 2018).

2.1 State Planning Policy (SPP)

The SPP identifies the Queensland Government’s policies about matters of state interest in land use
planning and development (Department of Infrastructure‚ Local Govenment and Planning (DILGP), July
2017). The SPP is a broad and comprehensive statutory planning instrument. It sits above regional
plans, standard planning scheme provisions and local government planning schemes within the
hierarchy of planning instruments outlined in the Planning Act 2016.

The SPP is supported by the following guidance material:

    •   The SPP state interest guidance material - Natural hazards, risk and resilience - Bushfire (‘SPP
        guidance’) (DSDMIP, 2019), which provides further context to the SPP and explains how the
        SPP policies can be applied, in particular for local government when making or amending local
        planning instruments. The SPP guidance is also intended to assist assessment managers and
        practitioners in applying the SPP assessment benchmarks when state interests have not been
        integrated into the local planning scheme (where applicable).

    •   The ‘Bushfire Resilient Communities – Technical Reference Guide for the State Planning Policy
        State Interest - Natural Hazards, Risk and Resilience – Bushfire (‘BRC Technical Guide’)
        (QFES, 2019), which provides technical guidance and policy positions of the Queensland Fire
        and Emergency Services (QFES). It includes procedures for undertaking a bushfire hazard
        assessment (BHA), calculating asset protection zones and preparing a Bushfire Management
        Plan.

The SPP assessment benchmarks outlined in Part E of the SPP and Section 4.0 of the SPP guidance
apply to development to the extent that the development is assessable against a planning scheme and
only to the extent that the planning scheme is inconsistent with the SPP.

The SPP is also supported by a state-wide map of bushfire prone areas (BPA) (also referred to as
‘bushfire hazard area’) that was developed based on the CSIRO modelling of potential fireline intensity
using the methodology described by Leonard et al. (2014). The BPA mapping identifies areas of Very
High (>40,000 kW/m), High (20,000 – 40, 000 kW/m) and Medium (4,000 – 20,000 kW/m) Potential
Bushfire Intensity. The Potential Impact Buffer includes all land within 100 metres of any area with a




                                               PR22428_BHAMP_199 Beddington Road, Doonan         Page 5

Page 10

                                                        Bushfire Hazard Assessment and Management Plan



potential fireline intensity greater than 4,000 kW/m (i.e. medium, high or very high bushfire
hazard/potential bushfire intensity). This mapping triggers assessment against the State Planning Policy
Assessment Benchmarks.

An excerpt from the SPP Assessment Benchmark – BPA mapping published on the SPP Interactive
Mapping System (IMS) is provided in Figure 2. The site is mapped as containing areas of Very High
Potential Bushfire Intensity and Potential Impact Buffer.




       Figure 2 Excerpt from DSDMIP SPP IMS – Bushfire prone area (Source: DSDMIP SPP IMS).

2.2 Noosa Plan 2020

The site is located within the Noosa local government area and is subject to the provisions of the Noosa
Plan 2020. The planning scheme’s Bushfire hazard overlay maps the site as containing areas of High
Potential Bushfire Intensity and Potential Impact Buffer. An excerpt from the overlay map identifying the
mapped bushfire hazard areas in relation to the proposed development site is shown in Figure 3.

Noosa Shire Council’s Bushfire hazard overlay mapping designates bushfire prone areas for the
purposes of Section 12 of the Building Regulation 2006. The provisions of the Building Code of Australia
(BCA) or Queensland Development Code (QDC) are applicable to any building assessment work in a
designated bushfire prone area.

The Noosa Plan 2020 Bushfire overlay code notes that a site-based assessment may be used to ground-
truth the extent of hazardous vegetation and the extent and nature of the bushfire hazard area (bushfire
prone area), but does not specify acceptable methodologies. The site-specific bushfire assessment




                                                PR22428_BHAMP_199 Beddington Road, Doonan         Page 6

Page 11

                                                         Bushfire Hazard Assessment and Management Plan



provided in this plan has been undertaken in accordance with the BRC Technical Guide (Queensland
Fire and Emergency Services (QFES), 2019).




   Figure 3 Excerpt from Noosa Plan 2020 – Bushfire hazard overlay (Source: NSC IntraMaps 9, 2023).

2.3 AS3959:2018 Construction of Buildings in Bushfire Prone Areas

The Australian Standard AS3959:2018 Construction of Buildings in Bushfire-Prone Areas (Standards
Australia, 2009) specifies the requirements for the construction of buildings in bushfire-prone areas in
order to improve their resistance to bushfire attack. AS3959:2018 applies to those areas where a
regulated map (i.e. a planning scheme overlay map) identifies an area as a bushfire prone area (or
similar), requiring calculation of Bushfire Attack Level (BAL) in accordance with a methodology outlined
in the standard.

AS3959:2018 thus prescribes the construction details for buildings depending on the calculated BAL.
The detailed requirements relating to construction methods and materials are typically dealt with as part
of building design and enabled via private certification in accordance with the Building Code of Australia.




                                                PR22428_BHAMP_199 Beddington Road, Doonan           Page 7

Page 12

                                                        Bushfire Hazard Assessment and Management Plan




3       Bushfire Hazard Assessment
A site-specific bushfire hazard assessment (BHA) for the site has been undertaken in accordance with
the methodology outlined in the ‘Bushfire Resilient Communities’ (BRC) technical document (QFES,
2019). The methodology underpinning the BHA process consists of three stages:

    1. An assessment to verify the reliability of existing BPA mapping over the site and land
        surrounding the site (the ‘assessment area’).

    2. A hazard assessment involving field investigations to ground-truth the accuracy of the BPA
        mapping for the site, where required. The hazard assessment area must include the
        development area and all land within 150 metres of the development footprint.

    3. Using the results of the site-specific assessment, the asset protection zone width needed to
        achieve the requisite radiant heat flux levels is calculated using the SPP Bushfire asset
        protection zone (APZ) width calculator or Method 2 of AS3959:2018.

Where the precision and/or accuracy of BPA mapping or map input datasets are insufficient (e.g. where
there has been changes in land use and vegetation cover within the assessment area), the process
enables applicants to create a local-scale BPA map based on the results of the site investigation and to
apply modified input variables that reflect changes that have occurred over time. The BHA process
adapts the method used to generate the state-wide BPA mapping, described in Leonard et. al. (2014)
with further refinement to allow for the downgrade and/or filtering of small patches and narrow corridors
where needed in accordance with contemporary mapping rules outlined in the BRC technical guide and
Leonard and Opie (2017).

Where effective fuel loads have been reduced based on patch size and isolation in accordance with the
patch and corridor filtering rules outlined in 4.2.6 of the QFES BRC technical guide, reduced effective
fuel loads can be used as inputs into a Method 2 Bushfire Attack Level (BAL) assessment.

The assessment has been based on vegetation existing within, adjacent and nearby to the site including
any areas subject to revegetation or regrowth, which have been assessed as if these areas have
reached their mature state.

3.1 Hazard Assessment

The following steps have been undertaken to assess spatial factors that contribute to potential bushfire
intensity for the site and surrounding land:

    •   Step 1: Identification of Fire weather severity

        Identification of all Forest Fire Danger Index (FFDI) values estimated at a 1:20 year (5%) Annual
        Exceedance Probability (AEP) using the Bushfire Hazard Area – Bushfire Prone Area – Inputs
        dataset from the Queensland Government data portal.

    •   Step 2: Identification of Vegetation Hazard Classes

        Assessment of vegetation communities to identify the relevant vegetation hazard classes
        (VHCs) using a combination of remnant and pre-clearing regional ecosystem maps, high-
        resolution aerial imagery and a ground-truthed assessment of vegetation present within the site
        and within the required 150 m assessment area.




                                               PR22428_BHAMP_199 Beddington Road, Doonan          Page 8

Page 13

                                                             Bushfire Hazard Assessment and Management Plan



    •      Step 3: Slope assessment

           Identification of site slope and effective slope, and determination of whether proposed buildings
           are upslope or downslope of hazardous vegetation using Bushfire Hazard Area – Bushfire
           Prone Area – Inputs dataset from the Queensland Government data portal and 1 m LiDAR-
           derived contour data.

    •      Step 4: Remodeling of bushfire hazard and calculation of potential fireline intensity -
           Where a change to the distribution, extent and/or classification of VHCs within the assessment
           area is proposed, remodeling of bushfire hazard is undertaken to determine how the changes
           to VHCs and associated fuel loads affect potential fireline intensity. Potential fireline intensity is
           to be calculated in accordance with the method outlined in Leonard et. al. (2014).

VHCs and associated potential fuel loads are in accordance with Leonard et al. (2017), as provided in
the BRC Technical Guide and SPP Bushfire APZ width calculator published by the Queensland Fire
and Emergency Services (QFES).

Relevant spatial datasets published by the QFES were accessed via the Queensland Spatial Catalogue
(QSpatial) and the Catalyst Fire Management System (Queensland Fire and Emergency Services,
2020).

3.1.1 Step 1 – Fire Weather Severity

South-east Queensland has a subtropical climate with warm humid summers and mild winters and is
subject to influence from monsoonal climate systems and easterly troughs. Seasonality is not
pronounced; however the ‘wet’ season generally occurs during the December – April period. The fire
danger season usually occurs from spring to mid-summer (August/September to December) with the
greatest danger after a dry winter and spring and when deep, low-pressure systems near Tasmania
bring strong, hot and dry westerly winds to the coastal districts (Bureau of Meteorology, 2021). Severe
bushfire weather is characterised by days with high temperatures over 35 degrees, low relative humidity
and winds from the north to north-west.

The Forest Fire Danger Index (FFDI) provides an annual accumulated index of fire weather severity (i.e.
the potential danger of a bushfire) based on a combination of vegetation dryness, air temperature, wind
speed and humidity. The relevant FFDI for the site was derived from the Fire Weather Severity (Forest
Fire Danger Index) raster provided as part of the Bushfire Hazard Area – Bushfire Prone Area – Inputs
dataset.

The FFDI for the site and surrounding land is 48.

3.1.2 Step 2 - Vegetation Hazard Classes and Potential Fuel Loads

3.1.2.1 Vegetation Hazard Classes

Different types of vegetation communities determine the rate at which dry fuel accumulates. Some
vegetation communities protect fuel from drying out in all but extreme bushfire seasons and can then
be susceptible to very destructive bushfires. Alternatively, vegetation communities may expose fuels to
drying and therefore be frequently available for burning. Frequent bushfires can result in the
development of bushfire-tolerant grassy woodlands or grasslands and less destructive bushfire
behaviour.




                                                    PR22428_BHAMP_199 Beddington Road, Doonan             Page 9

Page 14

                                                        Bushfire Hazard Assessment and Management Plan



Vegetation Hazard Classes (VHCs) provided within the Bushfire Prone Area – Vegetation hazard class
– South east Queensland spatial dataset were reviewed for the site and surrounding land (Figure 4).
The following VHCs are mapped within the required 150 m assessment area:

     •   8.1 – Wet eucalypt tall open forest;

     •   39.2 – Low to moderate tree cover in built-up areas;

     •   41.4 – Discontinuous low grass or tree cover; and

     •   42.6 – Nil to very low vegetation cover.

The reliability of State-mapped VHCs was assessed through:

     •   review of Vegetation management remnant and pre-clearing regional ecosystem (RE) mapping
         published by the Department of Resources (DoR);

     •   an assessment of existing vegetation within corridors undertaken by Green Tape Solutions in
         February 2023 as part of site investigations to support preparation of a BHAMP.

DoR’s remnant RE mapping shows that small patches of remnant vegetation are mapped within the
assessment area. These patches are identified as containing the following REs (Figure 5):

     •   RE12.9-10.14 – Open Forest of Eucalyptus grandis, Lophostemon confertus, Eucalyptus
         microcorys, Syncarpia glomulifera subsp. glomulifera +/- E. pilularis. Occurs on Cainozoic and
         Mesozoic sediments especially sandstone in wet gullies and southern slopes.

     •   RE12.9-10.1 – Tall open forest often with Eucalyptus resinifera, Eucalyptus grandis, Eucalyptus
         robusta and Corymbia intermedia on sedimentary rocks, usually coastal.

The site assessment determined that vegetation within the 150 m assessment area consists of a mosaic
of native vegetation, landscape vegetation (including streetscape vegetation) and areas of maintained
grassland/lawn with low tree cover. The site supports a several mature trees in close proximity to the
house, the central proportion of the lot has been cleared for an open lawn and retained vegetation in
the eastern proportion has been left relatively untouched. Vegetation adjacent to and within proximity of
the development consists of two (2) site-verified communities.

 •       Vegetation community 1 – Wet Eucalypt Forest

         Remnant native vegetation in the eastern portion of the site and on surrounding properties
         consists predominantly of a canopy of Flooded Gum (Eucalyptus grandis), Brush Box
         (Lophostemon confertus) Pink Bloodwood (Corymbia Intermedia), Tallowwood (Eucalyptus
         microcorys) and several species of Syzygium. These areas include a dense understory of Soap
         tree (Alphitonia excelsa), Mango (Mangifera indica), Golden cane palm (Dypsis lutescens) and
         several other native species. Common weed species within this community include Blue Lillies
         (Agapanthus praecox) Umbrella tree (Heptapleurum actinophyllum), Climbing Asparagus
         (Asparagus africanus) and Asparagus fern (Asparagus aethiopicus).

         This community is mapped as Category B (remnant) vegetation within the retained vegetation
         sections in the east of the site containing the regional ecosystem (RE) 12.9-10.14a – Open
         Forest of Eucalyptus grandis, Lophostemon confertus, Eucalyptus microcorys, Syncarpia




                                                PR22428_BHAMP_199 Beddington Road, Doonan        Page 10

Page 15

                                                          Bushfire Hazard Assessment and Management Plan



          glomulifera subsp. glomulifera +/- E. pilularis. Occurs on Cainozoic and Mesozoic sediments
          especially sandstone in wet gullies and southern slopes. The ground-truthed vegetation
          assessment determined that this vegetation meets the criteria for remnant status and is
          generally consistent with RE 12.9-10.14a.

          Vegetation community 1 – Wet Eucalyptus Forest within the site and on adjoining land has been
          classified as VHC 8.1 – Wet Eucalypt Tall Open Forest.

 •        Vegetation community 2 – Landscape vegetation

          The development footprint area and the western half of the subject site is mapped as Category
          X (non-remnant). Vegetation in these areas consists predominantly of a canopy of Flooded Gum
          (Eucalyptus grandis), Brush Box (Lophostemon confertus) Pink Bloodwood (Corymbia
          Intermedia), Tallowwood (Eucalyptus microcorys) and several species of Syzygium. The shrub
          and ground cover layer has been predominantly removed from these areas. The managed
          gardens around the property have been planted principally with native ground cover species but
          also includes exotic species and a fruit tree orchard. Adjoining properties also include areas of
          managed landscape vegetation.

          Landscape vegetation on site and within the 150 m assessment area has been classified as
          VHC 39.2 – Low to moderate tree cover in built-up areas.

Non-vegetated areas (roads, footpaths and buildings) and low-threat vegetation (including grassland
maintained in a minimal fuel condition, maintained lawns, maintained public reserves and parklands and
cultivated gardens) within the 150 m assessment area have been classified as VHC 42.6 – Nil to very
low vegetation cover. These areas have been excluded from the BAL assessment as they meet the
criteria for exclusion as low threat vegetation. Figure 5 depicts the location of ground-truthed VHCs
within the 150 m assessment area.




      Plate 1: Proposed development site location.      Plate 2: VHC 42.6 – Beddington Road to the west
     Facing north east towards maintained gardens.                  of the site. Facing north.
                      (VHC 39.2)




                                                PR22428_BHAMP_199 Beddington Road, Doonan          Page 11

Page 16

                                                       Bushfire Hazard Assessment and Management Plan




Plate 3: Vegetation Community 1 – 4 metre buffer        Plate 4: Vegetation Community 1 hazardous
    of unmanaged vegetation on neighbour’s              vegetation to the east of the development’s
boundary to the site, before mowed grounds and             location. Facing North East. (VHC 8.1)
                    gardens.




 Plate 5: Ground cover and leaf litter in the road   Plate 6: Vegetation in the road reserve to the east
         reserve. Facing East (VHC 39.2).                 of the site. (VHC8.1). Facing North East.




Plate 7: VHC 39.2 – Vegetation to the north of the   Plate 8: Vegetation to the east of the site (VHC 8.1)
   site on neighbouring lot. Facing North East.




                                               PR22428_BHAMP_199 Beddington Road, Doonan           Page 12

Page 17

     Property Boundaries
       Including 150 m Buffer

     Queensland Digital Cadastral Database.

Mapped Vegetation hazard Classes.

     VHC 39.2
     VHC 41.4
     VHC 42.6
     VHC 8.1

Page 18

Figure 5: Ground-truthed
Vegetation Hazard Classes
Project: PR22448_199 Beddington
Rd, Doonan

          Property boundary
          150 m assessment area
          VHC 8.1
          VHC 39.2
          VHC 42.6




Notes:
- VHC data by Green Tape Solutions.
- Site Infrastructure and Impact Areas from Client.
- Base map Copyright (c) Esri and its data suppliers.




Created By: RH
Date: 16/02/2023
Version: 1

Page 19

                                                            Bushfire Hazard Assessment and Management Plan



3.1.2.2 Potential Fuel Loads

Fuel loads have been allocated for each VHC to represent the long-unburnt condition that would be
typically exhibited 10 years after fire. In accordance with the values provided in Figure 14 of the BRC
Technical Guide (QFES, 2019a), the potential fuel load values for ground-truthed VHCs within and
surrounding the site are as provided in Table 2.

            Table 2: Potential fuel loads for classified vegetation within 150 m assessment area.


                                     Total      Total
                                    potential   overall
              VHC                   surface     potential        Prone type 1            Fuel continuity2
                                    fuel load   fuel load
                                     (t/ha)     (t/ha)

        Wet eucalypt tall open                                     Bushfire-prone –
8.1                                   31.0        35.0       1                           1    Continuous
                forest.                                           Forest / Shrub fires


        Low to moderate tree                                      Non-bushfire prone
39.2                                  5.0          8.0       3                           2   Discontinuous
        cover in built-up areas.                                     – Low hazard.


       Nil to very low vegetation                                 Non-bushfire prone
42.6                                  2.0          2.0       3                           2   Discontinuous
                cover.                                               – Low hazard.


3.1.3 Step 3 - Site and Effective Slope

Two slope input parameters are required for the estimation of fire behaviour and separation. Site slope
is the slope of the ground between the edge of the proposed development (or site boundary) and the
edge of hazardous vegetation. Effective slope refers to the slope of the land beneath hazardous
vegetation. Effective slope is the more important parameter as it has a direct influence on the potential
rate of fire spread, fuel consumption and thus, potential fireline intensity. For each vegetation hazard
class, the effective slope is determined by assessing the slope beneath classified vegetation (in
degrees) which most influences bushfire behaviour and the relative position of land supporting
hazardous vegetation in relation to the development i.e. upslope or downslope. Where there is more
than one slope beneath classified vegetation, each slope should be individually assessed, and the
worst-case scenario adopted.

The topography of the site and surrounding land is undulating with variable slopes due to dissection by
gullies and watercourses. Slope measurements have calculated using LiDAR-derived 1 metre contour
data published by the Department of Resources and verified by site measurement. The site slopes
gently down from the western portion of the site to the east.

The site slope and effective slope angles for all hazardous vegetation within the assessment area have
been calculated and are shown in Table 3.




1 Prone type taken from the VHC Data sheet of the SPP Bushfire APZ Calculator.
2 Fuel continuity type taken from Figure 14 of the QFES BRC Technical Guide.




                                                 PR22428_BHAMP_199 Beddington Road, Doonan          Page 15

Page 20

                                                            Bushfire Hazard Assessment and Management Plan




                     Table 3: Slope angles for assessable fire runs to the development site


     Slope location in
                                Max effective       Max site slope     Fire run in relation
 relation to development                                                                       Fire run scale
                               slope (degrees)        (degrees)         to development
           area


                                                                                                Short fire run
           East                      5.5                 7.27              Downslope
                                                                                                   (140m)


                                                                                                Short fire run
        South-east                   3.06                4.53              Downslope
                                                                                                   (140m)


                                                                                               Fully Developed
        North-east                   2.0                 5.8               Downslope
                                                                                                    Fire


                                                                                                Short fire run
        South-west                   9.5                 4.2               Downslope
                                                                                                   (150m)




3.1.4 Step 4 - Remodelling of Bushfire Hazard

Given that site-specific assessment determined that VHCs provided within the BPA – VHC – South east
Queensland spatial dataset do not entirely reflect the ground-truthed VHCs, remodelling of bushfire
hazard has undertaken to determine how the changes to VHCs and associated fuel loads affect potential
fireline intensity. Potential fireline intensity has been calculated in accordance with the method outlined
in Leonard et. al. (2014).

Potential fireline intensity (PFI) is a standard measure of the rate at which an advancing fire would
consume fuel energy per unit time per unit length of the fire front. This metric combines potential fuel
load (PFL), maximum landscape slope (slope) and fire weather severity (FFDI) to provide a potential
fireline intensity metric. The potential fireline intensity (PFI) is represented as the following equation:

PFI = 0.62 PFL2 x FFDI exp (0.069 x slope)

Where: PFI = Potential fire line intensity (kW/m), PFL = Potential fuel load (tonnes / ha), FFDI = Potential
severe fire weather (FFDI) and Slope = Max slope

Table 4 shows the potential fireline intensity ranges (in kilowatts per metre) and the corresponding
potential bushfire hazard classes.

                    Table 4: Potential fireline intensity ranges and bushfire hazard classes


                  Potential Fireline Intensity (kW/m)     Potential Bushfire Hazard Class

                             40,000+ kW/m                              Very high




                                                  PR22428_BHAMP_199 Beddington Road, Doonan             Page 16

Page 21

                                                                    Bushfire Hazard Assessment and Management Plan




                             20,000 – 40,000 kW/m                                   High


                              4,000–20,000 kW/m                                   Medium


                                0 – 4,000 kW/m                          Low/Not bushfire prone


Section 4.2.6 of the QFES BRC technical guide provides a series of mapping rules (‘patch and corridor
filtering’) for modifying the potential fireline intensity of bushfire-prone areas to reflect the likelihood of
lower potential fireline intensities in smaller vegetation patches and narrow vegetated corridors. These
rules are applied as follows:

       1. Remove patches of continuous fuel < 1 ha in area that are surrounded by either no fuel or non-
             continuous fuel and are further than 100 m from any other continuous fuel greater than 2 ha;

       2. Downgrade the effective fuel load of small patches of continuous fuel measuring a. 1 – 2 ha –
             downgrade by 66% and b. 2 – 3 ha – downgrade by 50 % if the patch is surrounded by either
             non-continuous fuel or a low-hazard vegetation or land-use type and if the patch is further than
             100m from any other continuous -fuel vegetation patch greater than 2 ha; and

       3. Remove narrow corridors and area of continuous fuel that are less than 50 m in width.

Based on the results of the site-specific assessment, vegetation within the assessment area does not
meet any of the patch and corridor filtering rules outlined in QFES (2019).

The potential fireline intensity was calculated for bushfire-prone vegetation within 150 m of the site using
the inputs from Steps 1 - 3. In accordance with Section 7.6 of the BRC Technical Guide, fireline intensity,
radiant heat flux and bushfire attack level is not required to be calculated for non-bushfire prone (i.e.
VHCs with a prone type of 2) or low hazard VHCs (i.e. VHCs with a prone-type of 3), therefore VHCs
39.3 and 42.6 have been excluded from calculation of potential fireline intensity. Remodelled potential
fireline intensity for bushfire-prone vegetation to the south and south-west of the site is provided in Table
5:

               Table 5: Potential fireline intensity for classified VHCs within 150 m assessment area


     Location of                                  Effective slope –
     classified                              average slope beneath         Fire       Potential   Potential   Remodelled
 vegetation in                                     bushfire-prone        weather       fireline   bushfire     bushfire
                       VHC         Status
     relative to                             vegetation in relation      severity     intensity    hazard       hazard
 development                                      to development          (FFDI)        (PFI)       class       class
        area                                            (degrees)


                                                                                       47,192
         E             8.1        Remnant        5.5        Downslope       48                    Very High   Very High
                                                                                     290 kW/m


                                                                                       39,880
        SE             8.1        Remnant        3.06       Downslope       48                      High        High
                                                                                       kW/m


                                                                                       37,067
        NE             8.1        Remnant        2.0        Downslope       48                      High        High
                                                                                       kW/m




                                                         PR22428_BHAMP_199 Beddington Road, Doonan               Page 17

Page 22

                                                              Bushfire Hazard Assessment and Management Plan




                                                                             62,193   Very High   Very High
        SW          8.1       Remnant       9.5      Downslope        48
                                                                              kW/m


The results of the potential fireline intensity calculation for bushfire-prone vegetation within the
assessment area show that vegetation within the site (VHC 8.1) has a potential bushfire hazard class
of ‘High’ or ‘Very High’. Section 5 outlines the requirements for management and mitigation of bushfire
hazard for the bushfire-prone vegetation within the site.

3.2 Radiant Heat Exposure and Bushfire Attack Levels

Bushfire attack levels (BALs) are used to quantify the levels of attack (radiant heat exposures/flux) that
built structures may experience during a fire event. The BAL is defined as ‘a means of measuring the
severity of a building’s potential exposure to ember attack, radiant heat and direct flame contact, using
increments of radiant heat expressed in kilowatts per metre squared, and the basis for establishing the
requirements for construction to improve protection of building elements from attack by bushfire’
(Standards Australia, 2018).

AS3959:2018 adopts six BAL categories, which are based on the level of radiant heat flux to which
buildings may be exposed to during a bushfire event. This level of heat flux generally relates to the type
of vegetation, effective slope and how far a building is from hazardous vegetation. BALs apply to
buildings and any attached or adjacent structure within 6 m of the building.

The BRC Technical Guide requires that radiant heat exposure/bushfire attack levels (BALs) are
calculated using either the SPP Bushfire APZ calculator (QFES, 2019b), which is the preferred method
or Method 2 of AS3959:2018. Where Method 2 is used, the following inputs are to be used:

    •    Site-specific values for FFDI (Step 1)

    •    Ground-truthed VHCs (Step 2) and their associated fuel loads (provided in Figure 14 of the BRC
         Technical Guide); and

    •    Site and effective slopes (Step 3).

The site is located within a large patch of remnant open forest. Given the extent of this patch, a potential
continuous fire run greater than 150m is highly likely to the north-east, but not to the east and south-
east. Accordingly, a short fire run methodology is relevant to this site for the east and south-east fire
runs. The following fuel loads have been used in the Method 2 assessment for all fire runs to the site–

    •    Understorey - potential fuel load of 31.0 t/ha;

    •    Total fuel load – potential fuel load of 35.0 t/ha

The Flamesol Method 2 Minimum Distance calculator has been used to calculate the minimum
separation distance required between the development and bushfire-prone vegetation for each BAL.
These results are provided in Appendix 2 and Figure 6 and summarised in Table 6.




                                                  PR22428_BHAMP_199 Beddington Road, Doonan          Page 18

Page 23

                                                         Bushfire Hazard Assessment and Management Plan



Table 6: Determination of Bushfire Attack Level (BAL) minimum separation distances for bushfire-prone
                                              vegetation.


  Bushfire        BAL-
   Attack         Flame         BAL-40        BAL-29          BAL-19          BAL-12.5         BAL-10
Level (BAL)     zone (FZ)


East            0 - < 21.7m   21.7 - < 27m   27 - < 35.2m   35.2 - < 44.6m   44.6 - < 50.3m   50.3- <100m


South-east      0 - < 19.8m   19.8-< 24.9m   24.9- < 2.6m   32.6 - < 41.6m   41.6 - < 47m     47 - < 100m


North-east      0 - < 19.8m   19.8-< 26.2m   26.2-<36.8m    36.8 - < 49.8m   49.8 - < 57.7m   57.7 -<100m


South-west      0 - < 26.8m   26.8-< 32.9m   32.9-<42m      42 - < 52.7m     52.7 - < 59.2m   59.2 -<100m




The ‘QFES BRC Document 2019’ (section 9.4) specifies that vulnerable uses (i.e. Hospices, Age Care
Facilities, child care etc.) in bushfire prone areas must not be exposed to a radiant heat flux level of
greater than 10 kW/m2 at all development footprint boundaries. To comply with AO1.2 of the Bushfire
Overlay Code in the Noosa Plan 2020 the development will be required to maximise the setback from
hazardous vegetation to achieve an acceptable risk therefore the development is required to have a
setback from the hazardous vegetation in accordance with the distances in Table 6 above for BAL 10.
The proposed new building can comply with this requirement.




                                              PR22428_BHAMP_199 Beddington Road, Doonan           Page 19

Page 24

Figure 6: Bushfire Attack
Level map
Project: PR22448_199 Beddington
Rd, Doonan
          Property boundary
          Hazourdous vegetation
Bushfire Attack Levels
          BAL Flamezone
          BAL 40
          BAL 29
          BAL19
          BAL 12.5
          BAL10




Notes:
- BALs by Green Tape Solutions
-Site Infrastructure and Impact Areas from Client
-Base map Copyright (c) Esri and its data suppliers.




Created By: RH
Date: 9/10/2023
Version: 2

Page 25

                                                          Bushfire Hazard Assessment and Management Plan




4       Bushfire Management Plan
The SPP requires that where it is not possible to avoid a bushfire prone area, development mitigates
bushfire risk to people and property to an acceptable or tolerable level. This can be achieved through
development design and siting, hazard reduction practices and emergency mitigation measures for any
buildings bordering potentially bushfire-susceptible vegetation. These practices and measures include
fuel reduction and management, road infrastructure to provide safe access and egress, appropriate
building design and construction standards, procedures for fighting bushfires and fire intensity reduction
management measures.

The development does not seek to mitigate bushfire hazard through additional vegetation clearing
beyond the development area boundary and shall contain all bushfire management and mitigation
measures within the development area.

4.1 Agencies / Persons Responsible

The responsible fire authority is the Queensland Fire and Emergency Services (QFES). It is the
responsibility of the proponent to ensure that the relevant measures required by this plan are in place
prior to inspection by the Council and the building certifier, and to ensure that the measures are in place
prior to enacting the approval. Furthermore, it is the responsibility of the proponent to ensure that a copy
of this report is always on hand at the site.

4.2 Owner / Occupier Responsibilities

It is the responsibility of the relevant lot owner to maintain each lot in accordance with the conditions
outlined in this report. The owner / occupier responsibilities include:

    •   An Asset Protection Zone (APZ) is to be established and maintained between the new wing and
        bushfire-prone vegetation. The APZ is to be managed in accordance with the measures outlined
        in Section 4.5.

    •   All access routes are to remain clear of obstacles to enable effective emergency vehicle access
        and egress; and

    •   No burning is to be undertaken on-site without a Permit to Burn as issued by the local Fire
        Warden (and approval if required, in writing, from Council).

    •   The storage or handling of hazardous chemicals on the premises must not result in an
        unacceptable risk to people, property and the environment. Hazardous chemicals should not
        present a risk to or impose upon emergency services when responding to an emergency or
        evacuation.

4.3 Reporting and Auditing

This bushfire report is a controlled working document that is to be updated and revised to reflect adaptive
management and constructive feedback. Some sections of the plan may be modified, new procedures
may be implemented, and responsibilities altered, depending on feedback and application.

This bushfire report will only ever be modified with the agreement of Noosa Council. This agreement
allows for changes to the plan scope, as determined through consultation and the acceptance of the




                                                PR22428_BHAMP_199 Beddington Road, Doonan           Page 21

Page 26

                                                         Bushfire Hazard Assessment and Management Plan



proponent. That is, where further actions are deemed necessary or where actions can be reduced in
scope.

4.4 Siting of Buildings

In accordance with the SPP 2017 (and associated guidance material) and the Noosa Plan 2020, the
proposed design has considered the key principles when siting development. The relevant clauses that
have been considered are:

    •    Utilising land that is predominantly cleared to minimise ecological impacts to native vegetation;

    •    Maximising where practicable building frontage setbacks from any hazardous vegetation; and

    •    Siting of buildings so that elements of the development that are least susceptible to fire are
         situated closest to the bushfire hazard (e.g. driveways, parking areas and protective landscape
         treatments).

4.5 Asset Protection Zones

The use of an APZ is the most effective defence against flame and radiant heat and to a lesser extent,
ember attack. The APZ incorporates defendable space and allows for managing heat intensities at the
building surface. Appropriate vegetation management measures shall be required to manage fine fuels,
which have the greatest influence on the spread of a conventional flame front-driven bushfire
(Queensland Government and CSIRO, 2020).

The QFES BRC Document specifies that vulnerable uses (i.e. Hospices, Age Care Facilities etc.) in
bushfire prone areas must not be exposed to a radiant heat flux level of greater than 10 kW/m2 at all
development footprint boundaries. An Asset Protection Zone (APZ) must be established on the property
on all sides of the proposed new building, to ensure that it will be able to achieve and maintain a BAL-
10 construction rating (Figure 6). The APZ will cover all areas on Figure 6 outside of the mapped
‘hazardous vegetation’ area. This APZ will have the following characteristics:

    •    Inner Protection Area (IPA): 0 – 10m from the edge of the new building. This area is to be
         maintained as an area that is effectively free of flammable material to provide defendable space
         and for managing heat intensities at the building surface. The IPA is to be managed as follows:

             o   Removal of all canopy trees and shrubs within the IPA. New trees are not to be planted
                 in the IPA.

             o   Landscaping treatments within the IPA shall comprise low threat vegetation, including
                 lawn areas managed in a minimal fuel condition (i.e. ≤ 100 mm nominal height as
                 specified in AS3959:2018) and landscape garden plant species that are of low
                 combustibility (i.e. species with high leaf moisture content, low volatile oil content,
                 absence of shedding bark, low production of leaf litter etc.). Flammable plants are not
                 permitted.

             o   Plants must be arranged to minimise vertical and horizonal connectivity of plant
                 material.

             o   Plants must be no closer than 5 metres from an exposed window or door.

             o   Mulches within any landscaped areas are to be non-combustible.




                                               PR22428_BHAMP_199 Beddington Road, Doonan          Page 22

Page 27

                                                             Bushfire Hazard Assessment and Management Plan



            o   Non-habitable structures such as sheds are permitted in the IPA, as long as they are
                made from non-combustible materials and are located greater than 6m from any
                habitable dwellings.

            o   In-ground swimming pools are permitted in the IPA, as long as they are made from non-
                combustible materials (including associated landscaping/paving etc).

            o   Any fencing is to be constructed from non-combustible materials.


    •   Outer Protection Area (OPA): 10m – outer edge of APZ. This area is to be maintained in
        low/reduced fuel load state to deprive an advancing fire front of fuel continuity. The OPA is to
        be managed as follows:

            o   To minimise clearing of native canopy vegetation, removal of existing trees is not
                proposed within the OPA. These trees are to be retained. However, removal of sub-
                canopy trees and flammable understorey vegetation (shrub layer) is required to remove
                continuous and ladder fuels.

            o   Landscaping treatments within the OPA shall comprise low threat vegetation, including
                lawn/grassed areas managed in a minimal fuel condition (i.e. ≤ 100 mm nominal height
                as specified in AS3959:2018) and plant species that are of low combustibility (i.e.
                species with high leaf moisture content, low volatile oil content, absence of shedding
                bark, low production of leaf litter etc.).

            o   Plants must also be arranged to minimise vertical and horizonal connectivity of plant
                material.

            o   Garden beds and shrubs are not to be located under trees.

            o   All trees are to have lower limbs removed up to a height of 2 metres above the ground.

            o   Mulches within any landscaped garden areas should be of non-combustible materials
                (e.g. pebbles).

            o   Non-habitable structures such as sheds are permitted in the OPA, as long as they are
                made from non-combustible materials and are located greater than 6m from any
                habitable dwellings.

            o   In-ground swimming pools are permitted in the OPA, as long as they are made from
                non-combustible materials (including associated landscaping/paving etc).

            o   Any fencing is to be constructed from non-combustible materials

Regular maintenance of the APZ should be undertaken to remove fuels and debris, particularly prior to
and during the fire season (i.e. late Winter to early Summer). This must include regular vegetation
management and maintenance where necessary and practicable (e.g. grass slashing, weed removal
etc.) and removal of debris and rubbish.

4.6 Access and egress

The site directly adjoins Beddington Rd and access to the new building will be provided via a driveway
along the western boundary of the site to Beddington Road. Easy access is also provided to the rear of
the property via the proposed vehicle driveways and manoeuvring areas. The development maintains




                                                PR22428_BHAMP_199 Beddington Road, Doonan          Page 23

Page 28

                                                         Bushfire Hazard Assessment and Management Plan



both adequate access for local firefighting appliances and adequate egress for residents and emergency
services personnel away from the most likely direction of an approaching bushfire. Evacuations are
available via the Entrance and Exit areas, where there is appropriate space for Queensland Fire and
Emergency Vehicles to be able to turn around and provide defence against ember attack or approaching
bushfires. The rear of the lot contains an appropriately sized fire break between the hazardous
vegetation and the maintained gardens and lawns of the hospice.

4.7 Electricity Supply

The proposed development will have access to mains electricity supply. Where practicable, electrical
transmission lines will be installed underground.

4.8 Water Supply

The site does not have access to a reticulated water supply. The proposed building will have the required
minimum level of stored, dedicated, on-site water supply for fire-fighting purposes. The site has access
to a 48,000-litre drinking water supply and an additional two (2) 5,000 litre water tanks used for gardens,
and a 50,000-litre swimming pool, therefore complying with AO3.2 of the Noosa Plan 2020 Bushfire
Hazard Overlay Code.

4.9 Climate Change and Fire Weather – Projections for 2050

Climate change can act in two ways to affect fire behaviour. First, it is likely to exacerbate the fire-
weather risk on any given day, leading to increased frequency or intensity of extreme and very extreme
fire-weather days particularly within the fire season. Secondly, an increase in the accumulated fire risk
over a year might represent a longer fire season and a reduction in the number of days suitable for
prescribed burning.

It is recommended to review this document and associated bushfire procedures at the site over the
coming decades in response to any potential increases of bushfire risk from climate change.

4.10 Emergency Response Procedures

An onsite fire management and evacuation strategy should be developed and available to implement in
the event of an emergency. In the event of a pending fire emergency, assistance is to be obtained by
contacting dialling 000.

4.11 Emergency Information Providers

In the event of a bushfire emergency, information can be sourced from:

Local Radio:

    •   90.3 FM Local ABC;
    •   91.9 Sea FM;
    •   95.3 FM Local ABC; and
    •   101.3 FM Noosa.




                                               PR22428_BHAMP_199 Beddington Road, Doonan           Page 24

Page 29

                                                          Bushfire Hazard Assessment and Management Plan



Noosa Shire Council – Disaster Dashboard.

Its recommended to sign up to the Noosa ALERTS system to receive SMS messages regarding
information regarding arising local disasters, severe weather and emergency events.

    •   Accessible by: http://disaster.noosa.qld.gov.au/

State Government, Queensland Fire Emergency Services – Current Warnings

    •   Accessible by: https://www.qfes.qld.gov.au/Current-Incidents

In the event of a bushfire emergency, do not rely on a single source of information, check multiple
places to stay up to date.

4.12 Local Resources

4.12.1 Queensland Fire and Emergency Services (QFES) Stations.
There are several Queensland Fire and Rescue and Queensland Rural Fire Services (Volunteer)
brigades within the close proximity (under 10km) of the site including:
    •   3.0 Km Doonan Rural Fire Brigade: 700 Eumundi Noosa Rd, Doonan Qld 4562;
    •   7.3 Km Tinbeerwah And District Rural Fire Brigade: 863 Sunrise Rd, Tinbeerwah Qld 4563;
    •   7.4 Km Verrierdale Rural Fire Brigade: 478 Verrierdale Rd, Verrierdale Qld 4562;
    •   7.9 Km Noosa Heads Tewantin Fire & Rescue Station: 2 Langura St, Noosa Heads Qld 4567;
    •   9.9 Km Eumundi Rural Fire Brigade: Napier Rd, Eumundi Qld 4562.


4.12.2 Neighbourhood Safe Places and Evacuation Centres.
Neighbourhood Safe Places and Evacuation Centres will be opened by the Noosa Council in the event
of an emerging bushfire or natural disaster event. The location of these centres will be dependent on
the type of emergency or disaster and will be provided in Noosa Shire Council’s Disaster Dashboard.

These centres are only for places of last resort and only to be used if all other options are exhausted
and you cannot seek refuge with family or friends outside the area impacted by the bushfire or only
attend the centre if directed by State or Local government officers (including police, firefighters etc.) or
the fire has escalated, and evacuation and refuge at these shelters is your ONLY safe option.




                                                PR22428_BHAMP_199 Beddington Road, Doonan           Page 25

Page 30

                                                     Bushfire Hazard Assessment and Management Plan




5     Assessment Against the Bushfire Hazard Overlay Code
The site is mapped with the Noosa Plan 2020 Bushfire Hazard Overlay, which triggers a response to
the Bushfire Hazard Overlay Code. An assessment against this code is provided in Table 7.




                                            PR22428_BHAMP_199 Beddington Road, Doonan       Page 26

Page 31

                                                                                                                          Bushfire Hazard Assessment and Management Plan



                                          Table 7: Assessment against the Noosa Plan 2020 – Bushfire Hazard Overlay Code.


           Performance Outcomes                                       Acceptable Outcomes                                            Compliance Assessment

Safety of people and property
         Development maintains the safety of                Development which will materially increase the number of
         people and property from the adverse               people living or congregating on premises, including           COMPLIES WITH PO1
         impacts of bushfire.                       AO1.1   reconfiguring a lot, is not located within a medium or high
                                                            bushfire hazard area.                                          The proposed new building will have an
                                                                                                                           appropriate setback for a vulnerable use, not
 PO1                                                        Development maximises setbacks from hazardous                  being exposed to greater than 10kW/m2 of
                                                            vegetation to achieve an acceptable risk.                      radiant heat.
                                                    AO1.2
                                                            Editor’s Note — PSP8 Natural Hazards provides
                                                            guidance for assessing bushfire hazard risk and
                                                            preparing a bushfire hazard management plan.
Impacts on Ecologically Important Areas
         Bushfire mitigation measures do not                No acceptable outcome provided
         adversely impact on:                                                                                              COMPLIES WITH PO2

         a. biodiversity values, connectivity and                                                                          The development footprint will result in the
         ecosystem functioning; and                                                                                        removal of a small number if native trees. The
         b. the long term physical integrity of                                                                            proposed APZ does not require any additional
 PO2     waterways, wetland and areas of native                                                                            native vegetation clearing. Therefore, the
         vegetation.                                                                                                       proposal will have minimal impacts on
                                                                                                                           biodiversity values, connectivity and ecosystem
                                                                                                                           functioning. The proposal will also not impact on
                                                                                                                           the long term physical of waterways, wetlands or
                                                                                                                           areas of mapped native vegetation
Water Supply for Fire Fighting Purposes
         Development provides an adequate                   Premises are connected to the reticulated water supply.
         water supply for fire fighting purpose                                                                            COMPLIES WITH AO3.2
         which is reliable, safely located and              Editor's note—For reconfiguring a lot, water supply needs
         freely accessible.                         AO3.1   to provide for a minimum flow and pressure of 10 litres a      The proposed dwelling will have the required
 PO3                                                        second at 200kPa at all times for fire fighting purposes.      minimum level of stored, dedicated, on-site
                                                                                                                           water supply for fire-fighting purposes. The site
                                                            OR                                                             has access to a 48,000-litre drinking water
                                                    AO3.2   Where there is no available reticulated water supply, the      supply and an additional two (2) 5,000 litre water




                                                                                                              PR22428_BHAMP_199 Beddington Road, Doonan                Page 27

Page 32

                                                                                                                         Bushfire Hazard Assessment and Management Plan



                                                            premises has:                                                  tanks used for gardens, and a 50,000-litre
                                                                                                                           swimming pool.
                                                            a.      an accessible dam, swimming pool or water tank
                                                            available for fire fighting purposes with an onsite water
                                                            volume of not less than 5,000 litres; and
                                                            a.      a water supply outlet pipe 50 millimetres in
                                                            diameter fitted with a standard fire brigade fitting
                                                            connected to the water supply (other than where the
                                                            water supply is in a swimming pool or dam).

                                                            Editor’s Note—Water supply capacity for fire fighting
                                                            purposes is in addition to water supply capacity for other
                                                            uses and activities on the premises.
Essential Community Infrastructure
         Essential community infrastructure is              Development involving essential community infrastructure
         able to function effectively during and            is not located within a medium or high bushfire hazard   Not applicable – the development does not
         immediately after bushfire events.                 area.                                                    constitute essential community infrastructure
                                                    AO4.1
                                                            OR

                                                            Where located in a medium or high bushfire hazard area,
 PO4                                                        development involving essential community infrastructure
                                                            is designed to function effectively during and after a
                                                            bushfire event in accordance with a Bushfire Hazard
                                                    AO4.2   Management Plan.

                                                            Editor’s Note— PSP8 Natural Hazards provides guidance
                                                            for assessing bushfire hazard risk and preparing a
                                                            bushfire hazard management plan.
Hazardous Materials
         Public safety and the environment are              Hazardous materials are not manufactured or stored in
         not adversely affected by the impacts of           bulk in a bushfire hazard area.                              Not applicable - The development will not store on
 PO5                                                AO5
         bushfire on hazardous materials                                                                                 manufacture hazardous materials.
         manufacturing or storing in bulk.
Access and Evacuation Routes
         Roads provide for easy and safe                    The road layout provides for through-roads and avoids
         evacuation of residents of premises and            cul-de-sacs and dead-end roads.                                COMPLIES WITH PO6
 PO6                                                AO6.1
         access by emergency services.
                                                            OR



                                                                                                             PR22428_BHAMP_199 Beddington Road, Doonan             Page 28

Page 33

                                                                                                                             Bushfire Hazard Assessment and Management Plan



                                                            The development has a perimeter road reserve with a               The development maintains both adequate
                                                            minimum width of 20 metres and maximum gradient of                access for local firefighting appliances and
                                                    AO6.2   12.5%.                                                            egress for residents. The site directly adjoins
                                                                                                                              Beddington Rd and easy access is provided to
                                                            OR                                                                the rear of the property. Residents leaving the
                                                            Cul-de-sacs or no-through roads are provided with fire            site can travel either north or south on
                                                            trails or access easements, which are capable of being            Beddington rd to escape bushfire threat.
                                                    AO6.3
                                                            navigated by conventional vehicles and which link to
                                                            through roads.                                                    The rear of the lot contains an appropriately
                                                            Safe access and egress is available at all times to all of        sized fire break between the hazardous
                                                    AO6.4                                                                     vegetation and the maintained gardens and
                                                            the development for emergency vehicles and personnel.
                                                            Where an emergency access point is required, it                   lawns of the hospice.
                                                    AO6.5   complies with the relevant works codes and PSP6
                                                            Engineering Design Standards.
Lot design
         Lot design and building siting minimises            Each residential lot:
         bushfire hazard risk to people and                                                                                   COMPLIES WITH PO7
         property.                                           a.     includes a building envelope, identified on a plan
                                                             of subdivision;                                                  The proposed new building is located in the most
                                                             a.     is of sufficient size and shape to allow for efficient    appropriate location on the property from a
                                                             emergency access to buildings for fire fighting                  bushfire hazard perspective, being furthest from
                                                             appliances (e.g. by avoiding battle-axe/hatchet lots and         hazardous vegetation and close to the road
                                                             long narrow lots with long access driveways to                   frontage.
 PO7                                                AO7
                                                             buildings);
                                                             a.     where more than 2500m², achieves setbacks
                                                             from hazardous vegetation in line with Bushfire Attack
                                                             Level 29 requirements as per AS3959; and
                                                             a.     is designed so that buildings and structures are
                                                             sited in locations of lowest hazard within the lot and
                                                             elements of the development least susceptible to fire
                                                             are closest to the fire hazard.
Firebreaks and fire access tracks
         Firebreaks and fire access tracks                   Where development involves the creation of a new
         provide:                                            road and lots, a firebreak is provided by providing a           COMPLIES WITH PO8.
                                                             cleared road reserve not less than 20 metres wide and
         a.     adequate access for fire fighting            maximum gradient of 12.5% around the perimeter of                The development maintains both adequate
 PO8                                                AO8.1
         and other emergency vehicles; and                   the subdivision, between the created lots and                    access for local firefighting appliances and
         a.     adequate access for the                      surrounding vegetated lands.                                     adequate egress for residents and emergency
         evacuation of residents and emergency                                                                                services personnel. The site directly adjoins
         personnel in an emergency situation.                OR                                                               Beddington Rd and easy access is provided to




                                                                                                                PR22428_BHAMP_199 Beddington Road, Doonan               Page 29

Page 34

                                                              Bushfire Hazard Assessment and Management Plan



        Fire access tracks are provided between the created    the rear of the property via the proposed vehicle
        lots and surrounding vegetated land that:              driveways and manoeuvring areas.

        a.    have a cleared minimum width of 6 metres;        The rear of the lot contains an appropriately
        a.    have a maximum gradient of 12.5%;                sized fire break between the hazardous
        a.    provide unbroken access for fire fighting        vegetation and the maintained gardens and
AO8.2
        vehicles;                                              lawns of the hospice.
        a.    provide passing bays and turning areas;
        a.    are located within an access easement that is    Evacuations are accessible via the Entrance and
        granted in favour of Noosa Council and the             Exit areas, where there is appropriate space for
        Queensland Fire and Rescue Service.                    Queensland Fire and Emergency Vehicles to be
                                                               able to turn around and provide defence against
        Bushfire management measures are carried out on the    ember attack or approaching bushfires.
AO8.3   subject property and not any adjoining property.




                                                      PR22428_BHAMP_199 Beddington Road, Doonan           Page 30

Page 35

                                                         Bushfire Hazard Assessment and Management Plan




6     Conclusion
This report has been prepared to provide a site-specific bushfire hazard assessment and management
plan for a proposed new residential hospice building at 199 Beddington Road, Doonan (Katie Rose
Cottage Hospice). The bushfire assessment has been undertaken in accordance with a contemporary
methodology i.e. the methodology outlined in the QFES Bushfire Resilient Communities Technical
Reference Guide (QFES, 2019) and utilises QFES-published inputs (FFDI and fuel loads) for hazardous
vegetation classified in accordance with the QFES vegetation hazard classification system.

The results of the assessment show that vegetation associated with the Wet Eucalypt Forest (VHC 8.1)
to the east, south-east, north-east and south-west of site has a potential bushfire hazard class of ‘high’
or ‘very high’. All other vegetation within 150 m of the development site is not classified as bushfire-
prone and therefore, calculation of radiant heat flux/bushfire attack level (BAL) is not applicable.

The QFES Bushfire Resilient Communities document states that vulnerable uses (such as residential
hospices) are to be sited so they achieve a radiant heat flux of no more than 10 kW/m 2. The proposed
new hospice building complies with this requirement. A bushfire Asset Protection Zone (APZ) has been
proposed on the property to achieve this outcome. Regular fuel maintenance within the APZ will be
required by the occupants of the dwelling to ensure ongoing protection of the dwelling. Most of the
understory vegetation within the APZ is already cleared and managed on a regular basis, so the impact
on ecological values from the APZ construction and maintenance will be minimal.

The site directly adjoins Beddington Rd and easy access is provided to the rear of the property via
the proposed vehicle driveways and manoeuvring areas. Direct access to the new building is provided
via a driveway along the western boundary of the site to Beddington Road. This driveway will provide
for the safe egress of residents in the event of an approaching bushfire. The driveway surface is
capable of supporting Rural Fire Service 4WD vehicles, and the longitudinal gradient of the driveway
does not exceed 12.5%. The rear of the lot contains an appropriately sized fire break between the
hazardous vegetation and the maintained gardens and lawns of the hospice.

The site does not have access to a reticulated water supply. The proposed building will have the required
minimum level of stored, dedicated, on-site water supply for fire-fighting purposes. The site has access
to a 48,000-litre drinking water supply and an additional two (2) 5,000 litre water tanks used for gardens,
and a 50,000-litre swimming pool, therefore complying with AO3.2 of the Noosa Plan 2020 Bushfire
Hazard Overlay Code.

The adjoining property to the south contains mostly non-bushfire prone vegetation (landscaped gardens
and lawns) along with some small patches of native vegetation. The proposed development is still
subject to bushfire risk by virtue of being located in a bushfire hazard area, but these risks will be
mitigated by the management plan in section 5 of this report and internal documents from Katie Rose
Cottage Hospice (KRCH) that illustrate the operational procedures for bushfire emergencies (KRCH
Bushfire Survival Plan, Emergency Evacuation Plan; and Bushfire Risk Management Plan). The
proposed development complies with State Planning Policy 2017 Natural Hazards, Risk and Resilience
Assessment Benchmarks and the Noosa Plan 2020 Bushfire Hazard Overlay Code.




                                               PR22428_BHAMP_199 Beddington Road, Doonan           Page 31

Page 36

                                                       Bushfire Hazard Assessment and Management Plan




7     References
Department of Infrastructure‚ Local Govenment and Planning (DILGP). (July 2017). State Planning
        Policy. Brisbane: Department of Infrastructure, Local Govenment and Planning (DILGP)
        Retrieved from https://dilgpprd.blob.core.windows.net/general/spp-july-2017.pdf

DSDMIP. (2019). State Planning Policy State Interest Guidance Material - Natural Hazards, Risk and
        Resilience - Bushfire, December 2019. Retrieved from
        https://dsdmipprd.blob.core.windows.net/general/spp-guidance-natural-hazards-risk-
        resilience-bushfire.pdf

Leonard, J., & Opie, K. (2017, 2017). Estimating the potential bushfire hazard of vegetation patches
        and corridors. Retrieved from https://publications.csiro.au/rpr/pub?pid=csiro:EP167343

Leonard, J., Opie, K., Newnham, G., & Blanchi, R. (2014). A new methodology for State-wide mapping
        of bushfire prone areas in Queensland. Retrieved from Brisbane:
        https://www.qfes.qld.gov.au/opendata/Bushfire_Prone_Area_Mapping_Report_5_Feb_2014_
        Low_Res.pdf

QFES. (2019). Bushfire Resilient Communities - Technical Reference Guide for the State Planning
        Policy State Interest 'Natural Hazards, Risk and Resilience - Bushfire', October 2019.
        Retrieved from https://www.ruralfire.qld.gov.au/Bushfire_Planning/Documents/Bushfire-
        Resilient-Communities.pdf

Queensland Fire and Emergency Services. (2020). Catalyst Fire Management System. Retrieved from
        https://catalyst.qfes.qld.gov.au/

Queensland Fire and Emergency Services (QFES). (2019). Bushfire Resilient Communities: Technical
        Reference Guide for the State Planning Policy State Interest 'Natural Hazards, Risk and
        Resilience' (October 2019). Queensland Fire and Emergency Services Retrieved from
        https://www.ruralfire.qld.gov.au/Bushfire_Planning/Pages/Bushfire-Resilient-
        Communities.aspx

Noosa Council Planning Scheme (2020). Noosa Plan 2020. Retrieved from:

        https://noo-prod-icon.saas.t1cloud.com/Pages/Plan/Book.aspx?exhibit=Current

Standards Australia. (2018). AS 3959-2018 Construction of buildings in bushfire-prone areas.
        Retrieved from Sydney: https://law.resource.org/pub/au/ibr/as.3959.2009.pdf




                                             PR22428_BHAMP_199 Beddington Road, Doonan           Page 32

Page 37

        Bushfire Hazard Assessment and Management Plan




                                  Appendix 1

Proposed Development Layout




PR22428_BHAMP_199 Beddington Road, Doonan     Page 33

Page 38

NOTE:-

THIS PLAN WAS PREPARED TO SHOW THE PROPOSED LOCATION OF THE
HOUSE ON THE SUBJECT LOT AND SHOULD NOT BE USED FOR ANY OTHER
                                                                                                             PROPERTY DESCRIPTION
PURPOSE. THE DIMENSIONS, AREAS, OFFSETS AND RL'S SHOWN HEREON ARE
SUBJECT TO CHANGE DUE TO CONSTRUCTION CONSTRAINTS, GOOD BUILDING
PRACTICES, REQUIREMENT OF COUNCIL AND ANY AUTHORITY WHICH MAY HAVE                                           LOT 6 ON RP225627
REQUIREMENTS UNDER ANY RELEVANT LEGISLATION. IN PARTICULAR, NO
RELIANCE SHOULD BE PLACED ON THE INFORMATION ON THIS PLAN FOR ANY                                            PARISH OF WEYBA
FINANCIAL DEALINGS INVOLVING THE LAND.
THIS NOTE IS AN INTEGRAL PART OF THIS PLAN.
                                                                                                             COUNTY OF MARCH
                                                                                                             NOOSA SHIRE COUNCIL
                                                                                                             LAND SIZE: 10680m²
                                                                                                             EXISTING DWELLING SIZE: 426.5m²
                                                                                                             PROPOSD DWELLING AREA: 424.61m²
                                                                                                             TOTAL AREA: 856.43m²
                                 NORTH                                                                       TOTAL SIZE COVER: 8.2%




                                                                                                                                                    ENTRY




                                                                                                                                                                                                                                                       DROP
                                                                                                                                                                                                                                                        OFF
                                                                                                                                                                                                                                                       ZONE




                                                                        .3
                                                                      40
                                                        .19
                                                      40                 STOP

                                                                        .22
                                                                      40
                                                          .1
                                                        40                               375∅
                                                                                    IL:38.99
                                                                .03         .14
                                                              40          40
                                                                                    .13
                                                                   .03            40
                                                                 40
                                                                                       .14                                                                                                                         SHARED
                                                                                     40                             0
                                                                                                       ST       90 0
                                                                          40
                                                                            .04                                                                                                                                     AREA
                                                                                                         .18
                                                                                                      40
                                                           .85                                                  .21
                                                         39                                      .08         40                                                                                                              PWD
                                                                                                                                                                                               86 . '20"
                                                                                                                                                                                               152




                                                                                               40               0.1
                                                                                                                   1
                                                                                                              4
                                                                                                                                                                                                   011




                                                                                                       .09
                                                                                                                                                                                                    °3




                                                                                            .97      40
                                                                                          39

                                                                                                                  .07                                                                                                                                                                                                                                                              0
                                                                                                                40                                                                                                                                                                                                                                                              .60
                                                                                                                                                                                                                                                                                                                                                                             150 4'0"
                                                                                                                                 4     .2                                                                                                                                                                                                                                      62°
                                                                                                                              0.1    40
                                                                                                                          4




                                                                                                                                              .19
                                                                                                                                            40                   .13
                                                                                                                                                       .21     40
                                                                                                                                                     40
                                                                                                                                                                                                                                                                                                 9   1
                                                                                                                                                                                                                                                                                             161
                                                                                                                                                       .16
                                                                                                                                                     40

                                                                                                                                                                                      .7
                                                                                                                                                                                    39
                                                                                                                        Screw in Kb RL:39.816
                                                                                                                                                                       40
                                                                                                                                                                                                                                                                                                                               181
                                                                                                                                                                                                                                                                                                                                  87




                                                                                                                                                                              .87
                                                                                                                                                                            39
                                                                                                                                                                                                             .36
                                                                                                                                                                                                           39

                                                                                                                                                                                             .64
                                                                                                                                                                                           39
                                                                                                                                                             BE
                                                                                                                                                                DD




                                                                                                                                                                                                                               .92
                                                                                                                                                                                                                             38
                                                                                                                                                                                                                                                  0∅
                                                                                                                                                                                                                                                30
                                                                                                                                                                                                     .49                                  .79
                                                                                                                                                                  ING




                                                                                                                                                                                                   39                                38
                                                                                                                                                                                                                                 IL:
                                                                                                                                                                                TO




                                                                                                                                                                                                                       .29
                                                                                                                                                                                                                     39
                                                                                                                                                                                    NR




                                                                                                                                                                                                                                                EXIT                                         41                                 NOTE: SEALING ONLY TO FRONT SECTION OF
                                                                                                                                                                                                                                                                                                                                DRIVEWAY AND PARKING AREAS (SOUTHERN
                                                                                                                                                                                      OA




                                                                                                                                                                                                                                                                                    .58
                                                                                                                                                                                                                                                                                  40
                                                                                                                                                                                                                                                                                                                                AND WESTERN SIDE).
                                                                                                                                                                                        D




                                                                                                                                                                                                                                .08
                                                                                                                                                                                                                              39

                                                                                                                                                                                                                                                       38
                                                                                                                                                                                                                                                         .93                                                                    GRAVEL TO BALANCE OF AREAS (NORTHERN SIDE)
                                                                                                                                                                                                                                                                                            .67
                                                                                                                                                                                                                                                                                          40

                                                                                                                                                                                                                                                                                 .37
                                                                                                                                                                                                                                                                               38
                                                                                                                                                                                                                                                                         .69                             Project Description
                                                                                                                                                                                                                                                                       38
                                                                                                                                                                                                                                                                 .72
                                                                                                                                                                                                                                                               38


                                                                                                                                                                                                                                                                                                         PROPOSED ADDITIONS
                                                                                                                                                                                                                                                                                                         Project Address                                                                PROPOSED SITE PLAN
                                                                                                                                                                                                                                                                                                         199 BEDDINGTON ROAD, DOONAN QLD 4562




                                                                                                                                                                                                                                                                                                                                                                                                                                                                      4/10/2023 12:27:11 PM
                                                                                                                                                                                                                                                                                                                                                                                        Project number   CCC36387

                                                                                                                                                                                                                                                                                                         Client Name
                                                                                                                                                                                                                                                                                                                                                                                        Date             04.10.2023                     WD.04
                                                                                                                                                                                                                                                                                                                                                                                        Drawn by                AG
                                                                                                                                                                                                                                                                                                         KATIE ROSE COTTAGE HOSPICE                                                     Checked by                -   Scale   1 : 350           Wind Category   TBC

Page 39

                          Bushfire Hazard Assessment and Management Plan




                                                    Appendix 2
Flamesol Method 2 Minimum Distance Calculations




                  PR22428_BHAMP_199 Beddington Road, Doonan     Page 34

Page 40

2/16/23, 3:47 PM

Flamesol - powered by FPA Australia

&

FPA | MES

AUSTRALIA

Calculated February 16, 2023, 4:46 pm (MDc v.4.9)

199 Beddington Rd East fire run SFR

Inputs
Fire Danger 48
Index
Vegetation Forest

classification

Understorey
fuel load

Total fuel
load

Vegetation
height

Effective
slope

Site slope

Flame width

Windspeed

Heat of
combustion

Flame
temperature

31 t/ha

35 t/ha

n/a

5.5°

7.27 °

49.58 m

n/a

18,600 kJ/kg

1,200 K

Rate of
spread

Flame length

Flame angle

Elevation of
receiver

Fire intensity

Transmissivity

Viewfactor

Minimum
distance to <
40 kW/m2

Minimum
distance to <
29 kW/m2

Minimum
distance to <
19 kW/m2

Minimum
distance to <
12.5 kW/m?

Minimum
distance to <
10 kW/m2

Outputs

2.6 km/h

21.16m

61.27 °, 66.27 °,
70.27 °, 74.27 °,
76.27 ° & 86,27 °

6.51 m, 6.24 m, 5.46
m, 4.49 m, 3.86 m &
Om

47,192 kW/m

0.848, 0.831,
0.8090000000000001,
0.79, 0.78 & 0.732

0.42, 0.3123, 0.2091,

0.1413, 0.1146 &

0.0305

21.7m

27m

35.2m

44.6m

50.3 m

tools.flamesol.com.au/MDc_output.php?CALCTITLE=199+Beddington+Rd+East+fire+run+SFR&EFFECTIVESLOPE=5.5&SITESLOPE=7.27&VE... 1/2

Page 41

2/16/23, 3:47 PM Flamesol - powered by FPA Australia
Rate of Spread - Mcarthur, 1973 & Noble et al., 1980
Flame length - NSW Rural Fire Service, 2001 & Noble et al., 1980
Elevation of receiver - Douglas & Tan, 2005
Flame angle - Douglas & Tan, 2005

Radiant heat flux - Drysdale, 1999, Sullivan et al., 2003, Douglas & Tan,
2005

tools.flamesol.com.au/MDc_output.php?CALCTITLE=199+Beddington+Rd+East+firetrun+SFR&EFFECTIVESLOPE=5.5&SITESLOPE=7.27&VE... 2/2

Page 42

2/16/23, 3:58 PM

Flamesol - powered by FPA Australia

&

FPA | MES

AUSTRALIA

Calculated February 16, 2023, 4:58 pm (MDc v.4.9)

199 Beddington Rd north-east fire run

Inputs
Fire Danger 48
Index
Vegetation Forest

classification

Understorey
fuel load

Total fuel
load

Vegetation
height

Effective
slope

Site slope

Flame width

Windspeed

Heat of
combustion

Flame
temperature

31 t/ha

35 t/ha

n/a

5.8 °

100 m

n/a

18,600 kJ/kg

1,200 K

Outputs

Rate of
spread

Flame length

Flame angle

Elevation of
receiver

Fire intensity

Transmissivity

Viewfactor

Minimum
distance to <
40 kW/m2

Minimum
distance to <
29 kW/m2

Minimum
distance to <
19 kW/m2

Minimum
distance to <

2.04 km/h

17.52m

68.8 °,
74,8 °,
78.8 °,
81.8 °,
82.8° &
88.8 °

6.15 m, 5.79
m, 4.85 m,
3.61 m, 2.83
m&Om

37,067 kW/m

0.848, 0.828,
0.802, 0.779,
0.769 &
0.716

0.4202,
0.3129,
0.2118,
0.1431,
0.1161 &
0.0312

19.8 m

26.2m

36.8 m

49.8 m

tools.flamesol.com.au/MDc_output.php?CALCTITLE=199+Beddington+Rd+north-east+fire+run& EFFECTIVESLOPE=2&SITESLOPE=5.8&VEGE... 1/2

Page 43

2/16/23, 3:58 PM Flamesol - powered by FPA Australia
12.5 kW/m?

Minimum
distance to < 57.7m
10 kW/m2

Rate of Spread - Mcarthur, 1973 & Noble et al., 1980

Flame length - NSW Rural Fire Service, 2001 & Noble et al., 1980
Elevation of receiver - Douglas & Tan, 2005

Flame angle - Douglas & Tan, 2005

Radiant heat flux - Drysdale, 1999, Sullivan et al., 2003, Douglas
& Tan, 2005

tools.flamesol.com.au/MDc_output.php?CALCTITLE=199+Beddington+Rd+north-east+fire+run& EFFECTIVESLOPE=2&SITESLOPE=5.8&VEGE... 2/2

Page 44

2/16/23, 3:44 PM

Flamesol - powered by FPA Australia

&

FPA | MES

AUSTRALIA

Calculated February 16, 2023, 4:44 pm (MDc v.4.9)

199 Beddington Rd South-east fire run SFR

Inputs
Fire Danger 48
Index
Vegetation Forest

classification

Understorey
fuel load

Total fuel
load

Vegetation
height

Effective
slope

Site slope

Flame width

Windspeed

Heat of
combustion

Flame
temperature

31 t/ha

35 t/ha

n/a

3.06 °

4.53 °

49.58 m

n/a

18,600 kJ/kg

1,200 K

Rate of
spread

Flame length

Flame angle

Elevation of
receiver

Fire intensity

Transmissivity

Viewfactor

Minimum
distance to <
40 kW/m2

Minimum
distance to <
29 kW/m2

Minimum
distance to <
19 kW/m2

Minimum
distance to <
12.5 kW/m?

Minimum
distance to <
10 kW/m2

Outputs

2.2 km/h

18.53 m

61.53 °, 65.53 °,
70.53 °, 73.53 °,
75.53 ° & 83.53 °

6.57 m, 6.46 m, 6.15
m, 5.59 m, 5.24m&
1.59 m

39,880 kW/m

0.852, 0.835,
0.8139999999999999,
0.795, 0.785 & 0.736

0.4184, 0.3096,

0.2083, 0.1403,

0.1138 & 0.0303

19.8 m

24.9m

32.6 m

41.6m

47m

tools.flamesol.com.au/MDc_output.php?CALCTITLE=199+Beddington+Rd+South-east+firetrun+SFR&EFFECTIVESLOPE=3.06&SITESLOPE=4... 1/2

Page 45

2/16/23, 3:44 PM Flamesol - powered by FPA Australia
Rate of Spread - Mcarthur, 1973 & Noble et al., 1980
Flame length - NSW Rural Fire Service, 2001 & Noble et al., 1980
Elevation of receiver - Douglas & Tan, 2005
Flame angle - Douglas & Tan, 2005

Radiant heat flux - Drysdale, 1999, Sullivan et al., 2003, Douglas & Tan,
2005

tools.flamesol.com.au/MDc_output.php?CALCTITLE=199+Beddington+Rd+South-east+firetrun+SFR&EFFECTIVESLOPE=3.06&SITESLOPE=4... 2/2

Page 46

2/17/23, 10:58 AM

Flamesol - powered by FPA Australia

&

FPA | MES

AUSTRALIA

Calculated February 17, 2023, 11:58 am (MDc v.4.9)

199 Beddington Rd SW fire run SFR

Inputs
Fire Danger 48
Index
Vegetation Forest

classification

Understorey
fuel load

Total fuel
load

Vegetation
height

Effective

slope

Site slope

Flame width

Windspeed

Heat of
combustion

Flame
temperature

31 t/ha

35 t/ha

n/a

9.5°

4.2°

53.12 m

n/a

18,600 k3/kg

1,200 K

Rate of
spread

Flame length

Flame angle

Elevation of
receiver

Fire intensity

Transmissivity

Viewfactor

Minimum
distance to <
40 kW/m2

Minimum
distance to <
29 kW/m2

Minimum
distance to <
19 kW/m2

Minimum
distance to <
12.5 kW/m2

Outputs

3.43 km/h

26.55 m

57.2 °, 61.2 °,
65.2 °, 70.2 °,
72.2 ° & 82.2 °

9.19 m,
9.210000000000001
m,
8.960000000000001
m,
8.619999999999999
m,
8.289999999999999
m & 4.43 m

62,193 kW/m

0.839, 0.821, 0.8,
0.78, 0.77 & 0.723

0.4242, 0.3146,
0.2124, 0.1432,
0.116 & 0.0309
26.8 m
32.9m

42m

52.7m

tools.flamesol.com.au/MDc_output.php?CALCTITLE=199+Beddington+Rd+SW+fire+run+SFR&EFFECTIVESLOPE=9.5&SITESLOPE=4.2&VEG... 1/2

Page 47

2/17/23, 10:58 AM Flamesol - powered by FPA Australia

Minimum
distance to < 59.2m
10 kW/m?

Rate of Spread - Mcarthur, 1973 & Noble et al., 1980

Flame length - NSW Rural Fire Service, 2001 & Noble et al., 1980
Elevation of receiver - Douglas & Tan, 2005

Flame angle - Douglas & Tan, 2005

Radiant heat flux - Drysdale, 1999, Sullivan et al., 2003, Douglas & Tan,
2005

tools.flamesol.com.au/MDc_output.php?CALCTITLE=199+Beddington+Rd+SW+fire+run+SFR&EFFECTIVESLOPE=9.5&SITESLOPE=4.28&VEG... 2/2

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.