Appendix E - Stormwater Management Plan · MCU12/0133

From the archive Development Application Part 2 of 2, 2 - Forms, Owner's Consent, Charitable Organisation Status, 3 - Town Planning Report (Noosa FLC), Appendix A - Code Ass Tables.,Appendix B - Proposal Plans.Appendix C - Archit Design Statement. File date in the archive: 2012-08-27 16:45.

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
Bligh Tanner Consulting Engineers                                                                  Page 3
Noosa Flexi Learning Centre Stormwater Management Plan
August 2012



Girraween Court has existing stormwater drains and kerb and channel. The stormwater pit in
front of the site has an invert at RL 31.27, about 1 metre below the lowest surface level on
the site.
At the end of the existing stormwater drain is a bioretention/infiltration system which was
inspected and had adequate plant coverage and no evidence of impeded infiltration.


1.3 Proposed Land Uses
The site is proposed to be used as Flexible Learning Centre, which seeks to respond to the
needs of young people disenfranchised and disengaged from education.

It will consist of a series of small buildings that create a learning environment for about 80
young people and about 10 staff.


1.4 Location Conditions
The site is located upstream of the environmentally sensitive Noosa National Park and the
Girraween Nature reserve, which Burgess Creek passes through. The stormwater
management priorities for this area are set out in the Girraween Stormwater Management
Plan (Ecological Engineering 2006) as follows:
    1. Reinstate the natural hydrology of the catchment
    2. Repair channel incision at existing stormwater outfalls and remove invasive aquatic
       weeds
    3. Treat urban stormwater to current best practice standards

1.5 Rainfall zone
The nearest rainfall gauge is Noosaville (Bureau of Meteorology Station ID 040995). This
rainfall station commenced in 2009, and so does not provide a sufficient period of record for
stormwater quality modelling. Accordingly the Cooroy Composite gauge (ID 40059) has
been used for long term simulations in accordance with the MUSIC Modelling Guidelines
Version 1.0 (Water by Design 2010).


1.6 Soil Category
For the purposes of this stormwater management plan, soils have been categorised by a
field inspection and from the Atlas of Australian Soils (accessed via the Australian Soil
Resource Information System). Full soil tests will be undertaken as part of a geotechnical
investigation as part of the detailed design and included with the operational works
application.

The site is characterised by fine, free draining sands with modest organic material and
limited fines (consistent with the dunal vegetation present on site). The Soils are in zone
Ca10. The five dominant principle profile forms for this zone, and their typical properties, are
outlined in Table 2 below.

Table 2: Soil Properties estimated using the Atlas of Australian Soils
Principal      Median A horizon Texture      Median A Horizon kSat
profile forms (Northcote class)              (log10) (mm/hr)
Uc2.2          1 (Uniform Coarse)            9 +/-2
Uc2.3          1 (Uniform Coarse)            9 +/-2
Uc1.22         1 (Uniform Coarse)            9 +/-2
O              3 (Uniform Fine)              9 +/-2
Gn2.94         2 (Uniform Medium)            7 +/-2

Used in these records

About this file

File size
1.1 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Appendix E - Stormwater Management Plan.pdf · 1.1 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.