Council archive · source document
Appendix E - Stormwater Management Plan · MCU12/0133
From the archive Development Application Part 2 of 2, 2 - Forms, Owner's Consent, Charitable Organisation Status, 3 - Town Planning Report (Noosa FLC), Appendix A - Code Ass Tables.,Appendix B - Proposal Plans.Appendix C - Archit Design Statement. File date in the archive: 2012-08-27 16:45.
Plans and drawings: the text below has words only, no drawings.
Bligh Tanner Consulting Engineers Page 10
Noosa Flexi Learning Centre Stormwater Management Plan
August 2012
CARPARK WITH CONTINGENCY LOCATION
AREAS TO BE PROTECTED REVEGETATED AREAS USING
PERMEABLE WHERE THE LANDSCAPE
DURING CONSTRUCTION EXISTING/RELOCATED PLANTS
PAVEMENT COULD BE DEPRESSED FOR
(INCLUDING UNDERSTOREY FLOOD DETENTION (1 M3) OR
PLANTING) BIORETENTION
ROOF AREA
DRAINING
`
DIRECTLY TO
INFILTRATION
ROOF AREA
DRAINING TO
RAINWATER
TANKS, WITH
OVERFLOW TO
INFILTRATION
CATCHMENT
EXTENT FOR SLAB-ON-GROUND
OVERLAND FLOWS CONSTRUCTION
Figure 2 Site plan showing relevant features of the stormwater strategy
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Appendix E - Stormwater Management Plan.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.1 MB (small file)
- File type
No other editions are linked here.