Skip to the record
Trusted by locals. Built for Noosa.

Council archive · source document

Appendix E - Stormwater Management Plan · MCU12/0133

From the archive Development Application Part 2 of 2, 2 - Forms, Owner's Consent, Charitable Organisation Status, 3 - Town Planning Report (Noosa FLC), Appendix A - Code Ass Tables.,Appendix B - Proposal Plans.Appendix C - Archit Design Statement. File date in the archive: 2012-08-27 16:45.

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
Bligh Tanner Consulting Engineers                                                                                     Page 16
Noosa Flexi Learning Centre Stormwater Management Plan
August 2012



                        •     In the front of the site there is an area of landscape that will be revegetated, and this
                              area could be easily depressed to create 1 m³ of shallow flood detention (0.1m depth
                              over 10 m²)
                        •     As additional airspace within rainwater tanks.

Further guidance will be sought from Council at Operational Works to confirm this
requirement. In any case, the proposed development layout is compatible with attenuating
flooding impacts downstream.


5.3 Frequent flow impacts downstream of the site
According to the Girraween Stormwater Management Plan (Ecological Engineering 2006),
the increased frequency of surface runoff is considered to be the primary threat to the wet
heath vegetation of that ecosystem.

The strategy to minimise impervious areas and to harvest and infiltrate stormwater is
consistent with preserving the hydrology of this receiving environment.

Pre and post development flow frequency curves are presented in Figure 7 below. It shows
that the strategy is effective in avoiding any increase in runoff for all rainfall events within the
simulation period (1973 – 1983). Exact replication of pre-developed flows is the ideal
outcome, and the results show modest reduction in flows. The following points are noted:
     • The results are generated from MUSIC in the absence of any calibration data to
         reflect the sandy soils of the site (nonetheless, the relative impact between pre and
         post development would probably not change greatly)
     • The reduction is modest (it is only apparent when plotted on a logarithmic scale)
     • A reduction is preferable to an increase (the wet heath is at risk from losing its drying
         phase), and there is already surplus wetting already occurring from other parts of the
         catchment, so a small reduction from this site is desirable.


                             100


                              10
  Daily flow (m³/day)




                               1


                              0.1                                                   pre
                                                                                    post
                             0.01


                            0.001
                                    0%         20%           40%           60%             80%        100%
                                                           Cumulative frequency

Figure 7: Comparison of pre and post development flow frequency showing that the
proposed development avoids increasing the wetness of the downstream ecosystem.

Used in these records

About this file

File size
1.1 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Appendix E - Stormwater Management Plan.pdf · 1.1 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.