Skip to the record
The definitive source for everything Noosa Council.

Council archive · source document

Appendix E - Stormwater Management Plan · MCU12/0133

From the archive Development Application Part 2 of 2, 2 - Forms, Owner's Consent, Charitable Organisation Status, 3 - Town Planning Report (Noosa FLC), Appendix A - Code Ass Tables.,Appendix B - Proposal Plans.Appendix C - Archit Design Statement. File date in the archive: 2012-08-27 16:45.

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
Bligh Tanner Consulting Engineers                                                               Page 18
Noosa Flexi Learning Centre Stormwater Management Plan
August 2012




7 CONCLUSION
The proposed stormwater management strategy for the Noosa Flexi Learning Centre will
satisfy the requirements for the site for:
    • Stormwater quality
    • Hydrology (frequent flows)
    • Flood mitigation
    • Erosion and sediment control.

The strategy is simple and feasible, and is closely linked to the architectural design of the
site.

It addresses the specific environmental requirements of the high value receiving
environment, and is consistent with the aspiration to create a special place for
disenfranchised young people.

Used in these records

About this file

File size
1.1 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Appendix E - Stormwater Management Plan.pdf · 1.1 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.