Skip to the record
The definitive source for everything Noosa Council.

Council archive · source document

Appendix E - Stormwater Management Plan · MCU12/0133

From the archive Development Application Part 2 of 2, 2 - Forms, Owner's Consent, Charitable Organisation Status, 3 - Town Planning Report (Noosa FLC), Appendix A - Code Ass Tables.,Appendix B - Proposal Plans.Appendix C - Archit Design Statement. File date in the archive: 2012-08-27 16:45.

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
Bligh Tanner Consulting Engineers
Noosa Flexi Learning Centre Stormwater Management Plan
August 2012



TSS Flow In (kg/yr),37.4551,24.3717,19.9417,122.603
TSS ET Loss (kg/yr),0,0,0,0
TSS Infiltration Loss (kg/yr),0,12.6527,13.0389,10.7399
TSS Low Flow Bypass Out (kg/yr),0,0,0,0
TSS High Flow Bypass Out (kg/yr),0,0,0,0
TSS Orifice / Filter Out (kg/yr),19.606,0,0,0.244347
TSS Weir Out (kg/yr),0.335678,0,0,0.006478
TSS Transfer Function Out (kg/yr),0,0,0,0
TSS Reuse Supplied (kg/yr),6.52001,0,0,0
TSS Reuse Requested (kg/yr),0,0,0,0
TSS % Reuse Demand Met,0,0,0,0
TSS % Load Reduction,46.7584,100,100,99.7954
TP Flow In (kg/yr),0.207126,0.13449,0.125607,0.235956
TP ET Loss (kg/yr),0,0,0,0
TP Infiltration Loss (kg/yr),0,0.0878825,0.0923026,0.0696649
TP Low Flow Bypass Out (kg/yr),0,0,0,0
TP High Flow Bypass Out (kg/yr),0,0,0,0
TP Orifice / Filter Out (kg/yr),0.123547,0,0,0.000999727
TP Weir Out (kg/yr),0.00206,0,0,2.11818E-5
TP Transfer Function Out (kg/yr),0,0,0,0
TP Reuse Supplied (kg/yr),0.0609768,0,0,0
TP Reuse Requested (kg/yr),0,0,0,0
TP % Reuse Demand Met,0,0,0,0
TP % Load Reduction,39.3571,100,100,99.5673
TN Flow In (kg/yr),2.61547,1.7208,1.64523,1.135
TN ET Loss (kg/yr),0,0,0,0
TN Infiltration Loss (kg/yr),0,1.40174,1.44888,0.790341
TN Low Flow Bypass Out (kg/yr),0,0,0,0
TN High Flow Bypass Out (kg/yr),0,0,0,0
TN Orifice / Filter Out (kg/yr),1.61898,0,0,0.00909755
TN Weir Out (kg/yr),0.0262464,0,0,0.000343
TN Transfer Function Out (kg/yr),0,0,0,0
TN Reuse Supplied (kg/yr),0.833146,0,0,0
TN Reuse Requested (kg/yr),0,0,0,0
TN % Reuse Demand Met,0,0,0,0
TN % Load Reduction,37.0962,100,100,99.1682
GP Flow In (kg/yr),28.8132,18.9831,0,12.5424
GP ET Loss (kg/yr),0,0,0,0
GP Infiltration Loss (kg/yr),0,0,0,0
GP Low Flow Bypass Out (kg/yr),0,0,0,0
GP High Flow Bypass Out (kg/yr),0,0,0,0
GP Orifice / Filter Out (kg/yr),0,0,0,0
GP Weir Out (kg/yr),0,0,0,0
GP Transfer Function Out (kg/yr),0,0,0,0
GP Reuse Supplied (kg/yr),0,0,0,0
GP Reuse Requested (kg/yr),0,0,0,0
GP % Reuse Demand Met,0,0,0,0
GP % Load Reduction,100,100,100,100

No Generic treatment nodes

Other nodes
Location,Pre-Development Node,Post-Development Node
ID,2,12
Node Type,PreDevelopmentNode,PostDevelopmentNode
IN - Mean Annual Flow (ML/yr),2.90,2.02

Used in these records

About this file

File size
1.1 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Appendix E - Stormwater Management Plan.pdf · 1.1 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.