Appendix E - Stormwater Management Plan · MCU12/0133
From the archive Development Application Part 2 of 2, 2 - Forms, Owner's Consent, Charitable Organisation Status, 3 - Town Planning Report (Noosa FLC), Appendix A - Code Ass Tables.,Appendix B - Proposal Plans.Appendix C - Archit Design Statement. File date in the archive: 2012-08-27 16:45.
Plans and drawings: the text below has words only, no drawings.
Bligh Tanner Consulting Engineers Page ii Noosa Flexi Learning Centre Stormwater Management Plan August 2012 TABLE OF CONTENTS EXECUTIVE SUMMARY ...................................................................................................... IV GLOSSARY .......................................................................................................................... V 1 INTRODUCTION ............................................................................................................. 1 1.1 Locality Plan ............................................................................................................ 2 1.2 Site Characteristics................................................................................................. 2 1.3 Proposed Land Uses .............................................................................................. 3 1.4 Location Conditions ............................................................................................... 3 1.5 Rainfall zone ............................................................................................................ 3 1.6 Soil Category ........................................................................................................... 3 2 DESIGN OBJECTIVES ................................................................................................... 5 2.1 Stormwater Treatment Objectives ......................................................................... 5 2.2 Hydrologic Objectives ............................................................................................ 6 2.3 Water Savings Targets ........................................................................................... 6 2.4 Construction Phase Objectives ............................................................................. 7 Erosion Hazard Assessment ........................................................................................... 7 3 STRATEGY DESCRIPTION AND PLAN ........................................................................ 8 3.1 Erosion and Sediment Control Strategy................................................................ 9 3.2 Stormwater Treatment Strategy ............................................................................. 9 4 STORMWATER QUALITY ASSESSMENT................................................................... 11 5 HYDROLOGIC ASSESSMENT ..................................................................................... 14 5.1 Flooding of the site ............................................................................................... 14 5.2 Flooding impacts downstream of the site ........................................................... 14 5.3 Frequent flow impacts downstream of the site ................................................... 16 6 IMPLEMENTATION ...................................................................................................... 17 6.1 Construction.......................................................................................................... 17 7 CONCLUSION .............................................................................................................. 18 8 REFERENCES .............................................................................................................. 19 List of Figures Figure 1 Locality Plan showing the site in relation to relevant receiving environments ........... 2 Figure 2 Site plan showing relevant features of the stormwater strategy .............................. 10 Figure 3 MUSIC model schematic........................................................................................ 12 Figure 4: Comparison of runoff volumes and pollutant loads, which shows that the mitigated pollutant loads are close to existing levels and well below a conventional ‘best-practice’ approach (note logarithmic scale). Actual values are presented in Table 6. ........................ 12 Figure 5 Catchment boundary and overland flow paths ....................................................... 14 Figure 6 Comparison of pre and post developed peak flows (without mitigation). The increase in peak flow for the Q100 is about 140 litres per second. ..................................................... 15 Figure 7: Comparison of pre and post development flow frequency showing that the proposed development avoids increasing the wetness of the downstream ecosystem......... 16 List of Tables Table 1 Key site information.................................................................................................. 1 Table 2: Soil Properties estimated using the Atlas of Australian Soils .................................... 3 Table 3 How the proposal responds to the Noosa Plan.......................................................... 5 Table 4 Values used in erosion hazard estimation ................................................................. 7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Appendix E - Stormwater Management Plan.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.1 MB (small file)
- File type
No other editions are linked here.