Skip to the record
Mmm.. taste the original NoosaWatch™

Council archive · source document

Appendix E - Stormwater Management Plan · MCU12/0133

From the archive Development Application Part 2 of 2, 2 - Forms, Owner's Consent, Charitable Organisation Status, 3 - Town Planning Report (Noosa FLC), Appendix A - Code Ass Tables.,Appendix B - Proposal Plans.Appendix C - Archit Design Statement. File date in the archive: 2012-08-27 16:45.

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
Bligh Tanner Consulting Engineers                                                                                                   Page ii
Noosa Flexi Learning Centre Stormwater Management Plan
August 2012



TABLE OF CONTENTS

EXECUTIVE SUMMARY ...................................................................................................... IV
GLOSSARY .......................................................................................................................... V
1 INTRODUCTION ............................................................................................................. 1
 1.1 Locality Plan ............................................................................................................ 2
 1.2 Site Characteristics................................................................................................. 2
 1.3 Proposed Land Uses .............................................................................................. 3
 1.4 Location Conditions ............................................................................................... 3
 1.5 Rainfall zone ............................................................................................................ 3
 1.6 Soil Category ........................................................................................................... 3
2 DESIGN OBJECTIVES ................................................................................................... 5
 2.1 Stormwater Treatment Objectives ......................................................................... 5
 2.2 Hydrologic Objectives ............................................................................................ 6
 2.3 Water Savings Targets ........................................................................................... 6
 2.4 Construction Phase Objectives ............................................................................. 7
   Erosion Hazard Assessment ........................................................................................... 7
3 STRATEGY DESCRIPTION AND PLAN ........................................................................ 8
 3.1 Erosion and Sediment Control Strategy................................................................ 9
 3.2 Stormwater Treatment Strategy ............................................................................. 9
4 STORMWATER QUALITY ASSESSMENT................................................................... 11
5 HYDROLOGIC ASSESSMENT ..................................................................................... 14
 5.1 Flooding of the site ............................................................................................... 14
 5.2 Flooding impacts downstream of the site ........................................................... 14
 5.3 Frequent flow impacts downstream of the site ................................................... 16
6 IMPLEMENTATION ...................................................................................................... 17
 6.1 Construction.......................................................................................................... 17
7 CONCLUSION .............................................................................................................. 18
8 REFERENCES .............................................................................................................. 19

List of Figures
Figure 1 Locality Plan showing the site in relation to relevant receiving environments ........... 2
Figure 2 Site plan showing relevant features of the stormwater strategy .............................. 10
Figure 3 MUSIC model schematic........................................................................................ 12
Figure 4: Comparison of runoff volumes and pollutant loads, which shows that the mitigated
pollutant loads are close to existing levels and well below a conventional ‘best-practice’
approach (note logarithmic scale). Actual values are presented in Table 6. ........................ 12
Figure 5 Catchment boundary and overland flow paths ....................................................... 14
Figure 6 Comparison of pre and post developed peak flows (without mitigation). The increase
in peak flow for the Q100 is about 140 litres per second. ..................................................... 15
Figure 7: Comparison of pre and post development flow frequency showing that the
proposed development avoids increasing the wetness of the downstream ecosystem......... 16

List of Tables
Table 1 Key site information.................................................................................................. 1
Table 2: Soil Properties estimated using the Atlas of Australian Soils .................................... 3
Table 3 How the proposal responds to the Noosa Plan.......................................................... 5
Table 4 Values used in erosion hazard estimation ................................................................. 7

Used in these records

About this file

File size
1.1 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Appendix E - Stormwater Management Plan.pdf · 1.1 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.