Skip to the record
NoosaWatch™: The source of truth.

Council archive · source document

Appendix E - Stormwater Management Plan · MCU12/0133

From the archive Development Application Part 2 of 2, 2 - Forms, Owner's Consent, Charitable Organisation Status, 3 - Town Planning Report (Noosa FLC), Appendix A - Code Ass Tables.,Appendix B - Proposal Plans.Appendix C - Archit Design Statement. File date in the archive: 2012-08-27 16:45.

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
Bligh Tanner Consulting Engineers                                                            Page 1
Noosa Flexi Learning Centre Stormwater Management Plan
August 2012



1 INTRODUCTION
This stormwater management plan has been prepared in accordance with the requirements
for Site Based Stormwater Management Plans as outlined in the Urban Stormwater Planning
Guidelines (DERM 2010) as referenced under the State Planning Policy 4/10 Healthy
Waters.

It described the stormwater strategy for the site and considers erosion and sediment control,
stormwater management (water quality and hydrology), and flooding, and has been prepared
to support a Development Application for the site. Key details about the site are listed in
Table 1 below.

The Noosa Flexi-Learning Centre aims to create a welcoming and distinctly un-institutional
learning environment for disenfranchised and disengaged youth in the Noosa Region. The
design response is to create a beach-house style environment which minimises its impact on
the site, as well as on the planet’s resources.

The young people that will use the centre are approaching life with few privileges. By
creating a learning environment that embodies great sustainability features, the design team
hopes to provide accelerated opportunities for them to understand and interact with the types
of environmental knowledge that we believe will be important to the world they are inheriting.
Such learning opportunities can help build their pride, self-confidence and a sense of
purpose.

The stormwater management strategy helps create such a place by:
   • Preserving the natural hydrology across most of the site by building on piers, and
       minimizing soil compaction during construction.
   • Harvesting rainwater and using a prominent elevated rainwater tank that both
       symbolizes the responsible use of water and reduces the electricity needed for
       pumping.


Table 1 Key site information

Submission date                                 August 2012
Developer’s name                                Edmund Rice Education and the Flexible
                                                Learning Centre Network
Principal Consultant                            Fulton Trotter Architects
Consultant’s name                               Bligh Tanner Consulting Engineers
Current and proposed land use of                The site is currently vacant. The
development site                                proposed use is for a Flexible Learning
                                                Centre.
Description of site location                    The site is on Girraween Crt, Sunshine
                                                Beach Qld, opposite the Sunshine Beach
                                                High School and adjacent to Tennis
                                                Noosa. The site has recently been
                                                subdivided from the parent Lot 3 on
                                                RP887636 (at the time of writing the plan
                                                hasn’t been sealed).
Coordinates                                     26°24’25”S
                                                153°06’06”
Reference to associated documents.              Fulton trotter Architectural Drawings
                                                DA-01 to DA-06

Used in these records

About this file

File size
1.1 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Appendix E - Stormwater Management Plan.pdf · 1.1 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.