Council archive · source document
Decision Notice - Change to an Existing Approval - 010.2008.00000611.002 [As Published] · 142008.611.02
2008/611
Plan / Rev. Plan / Document Name Date
Document No.
08/23-1 A Working Drg – John Norden & February 2008
Associates
GAD2 0 25 July 2004
Airberth Secured to Jetty Posts –
Airberth
GAD1 0 25 July 2004
Airberth Secured to Jetty Posts –
Airberth
and as may be amended by these conditions.
2. Structures should be designed and constructed such that they are free standing within the
waterway and are not connected to or behind the revetment wall.
3. The boat lifting device is to be located in conjunction with the approved jetty and shall not
extend beyond the end of the approved jetty and with an overall width no greater than 3.0m.
4. The boat lifting device is to be fixed to the approved jetty as such it forms part of the structure
and generally perpendicular to the revetment wall.
5. There shall be no electrical reticulation system carrying electricity in excess of 24 volts beyond
the revetment wall.
6. Lighting associated with the use shall be designed, installed, operated, and maintained in
accordance with Section 3 of AS4282 Control of the Obtrusive Effects of Outdoor Lighting.
7. The boat lifting device is to be used for private purposes only with no commercial operations to
be undertaken.
8. Boat repair activities will not be permitted on site.
9. Wastewater and sullage shall only be disposed of at approved pumpout facilities.
10. The mooring facility shall not be utilised for live-aboard purposes.
11. Any construction and post construction activity is not to impact on the condition of the
waterway, and is to be conducted so as not to breach the Environmental Protection Act EPA
(1994) and the Environmental Protection (Water) Policy 1997.
12. The approval or conditions do not constitute a ruling on structural safety and the applicant
must make their own arrangement to ensure adequacy of design and work. Also any approval
granted does not warrant that such plans and specifications have been checked in detail, nor
does it absolve the owner of the land from complying with all the conditions of this approval
and/or relevant Council By-Laws and Policies and/or relevant statues and/or statutory
regulations in the execution and/or performance of said works. The Council does not accept
any responsibility for the accuracy of such plans
13. Certification by a Registered Professional Engineer of Queensland that states that the boat
lifting device has been constructed in accordance with best practice methods and are
structurally sound shall be submitted to Council prior to the return of any bond monies held by
Council. A final inspection and approval of the structures by Council’s Inspector is also
required prior to the return of any bond monies held by Council. Please contact Council’s
Land Development Section to arrange the inspection.
14. The boat lifting device shall be licensed with the Council upon completion of the structural
work and shall be licensed annually thereafter.
5 REFERRAL AGENCY CONDITIONS
The referral agencies applicable to this application are:
Page 2 of 6
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - Change to an Existing Approval - 010.2008.00000611.002 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 54 KB (small file)
- File type
No other editions are linked here.