Skip to the record
Mmm.. taste the original NoosaWatch™

Original source · versioned page text

SUPERSEDED - Complied Approved Plan - 132005.638.03

of 39

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (120 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
NOOSA SHIRE COUNCIL

PLANS APPROVED

Area outlined in Yellow denotes

Proposed Future Development of proposed aes of casing.

Noosaville Landfill hs une Total Area including proposed

 
Log in to download the original file

SUPERSEDED - Complied Approved Plan - 132005.638.03.pdf · 120 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 38 pages

Page 2

                                                                                                                                                                                                                          ALL DRAWINGS TO BE PRINTED IN COLOUR!
                                                                                                                                                                           NOOSA COUNCIL
                                                                                                                                                                           APPROVED PLAN
                                                                                                                                                                       132005.638.03 15 FEB 2024




                                                                                                                                                                                                                             FILE:C:\Users\dkang\Documents\TMRCust\TempDwgLocation\AcPublish_10044\501042 landfill RRA expansion - capping.dwg DATE:13/Dec/2023 BY:dkang
     E                                                                                                                                                                                         Capital Project Number
     D
                                                        PSM No     NA
                                                                                       NOOSA COUNCIL INFRASTRUCTURE                     EUMUNDI NOOSA ROAD - DOONAN
                                                       (AHD) RL    NA
                                                                                       PLANNING , DESIGN AND DELIVERY                                                                              501042
A3   C
     B
     A 07/12/23   ISSUED FOR REVIEW
                                                      SURVEYED
                                                        DRAWN
                                                                   NA
                                                                  D KANG   12 / 2023
                                                                                        PO BOX 141 TEWANTIN QLD 4565
                                                                                       ph:(07) 5329 6500 email: [email protected]
                                                                                                                                        PROPOSED RESOURCE RECOVERY AREA EXPANSION 2023
                                                                                                                                                                                               Sheet No. - Revision No.

     Rv DATE               REVISIONS   REC.   APPR.   CHECKED                                                                           PROPOSED SITE LAYOUT PLAN                              C02              A

Page 3

                                                                                                                                                                                                                    ALL DRAWINGS TO BE PRINTED IN COLOUR!
                                                                                                                                                         NOOSA COUNCIL
                                                                                                                                                         APPROVED PLAN
                                                                                                                                                     132005.638.03 15 FEB 2024




                                                                                                                                                                                                                       FILE:C:\Users\dkang\Documents\TMRCust\TempDwgLocation\AcPublish_10044\501042 landfill RRA expansion - capping.dwg DATE:13/Dec/2023 BY:dkang
     E                                                                                                                                                                                   Capital Project Number
     D
                                                        PSM No     NA
                                                                                       NOOSA COUNCIL INFRASTRUCTURE                     EUMUNDI NOOSA ROAD - DOONAN
                                                       (AHD) RL    NA
                                                                                       PLANNING , DESIGN AND DELIVERY                                                                        501042
A3   C
     B
     A 07/12/23   ISSUED FOR REVIEW
                                                      SURVEYED
                                                        DRAWN
                                                                   NA
                                                                  D KANG   12 / 2023
                                                                                        PO BOX 141 TEWANTIN QLD 4565
                                                                                       ph:(07) 5329 6500 email: [email protected]
                                                                                                                                        PROPOSED RESOURCE RECOVERY AREA EXPANSION 2023
                                                                                                                                                                                         Sheet No. - Revision No.

     Rv DATE               REVISIONS   REC.   APPR.   CHECKED                                                                           PROPOSED OFFSET PLANTING PLAN                    C02              A

Page 4

Noosa Landfill RRA Flood Assessment




         Noosa Landfill RRA Flood
               Assessment


                                             Prepared By:

                                 Hydrology and Water
                             Management Consulting Pty Ltd

                                             Prepared for:


                                          Noosa Council

                                        Reference: J00352R1V2
                                            Date: 6/04/2022



                                          NOOSA COUNCIL
                                          APPROVED PLAN
                                      132005.638.03 15 FEB 2024



                                               Hydrology and Water Management Consulting Pty Ltd
                                               PO Box 120 Coolum Beach Qld 4573
                                               Mob 0405 194 639
                                               Email [email protected]
                                               Web www.hydrologyandwater.com.au
                                               ABN 25 153 466 981 ACN 153 466 981




J00352R1V2                                                                                         i

Page 5

Noosa Landfill RRA Flood Assessment




Disclaimer

This report has been prepared on behalf of and for the exclusive use of Noosa Council (the client). It is subject to the
provisions of the agreement between Hydrology and Water Management Consulting Pty Ltd (HWMC) and the client.
HWMC accepts no liability or responsibility whatsoever for or in respect of any use of or reliance upon this report by any
third party. This report should not be used for purposes other than those for which it has been prepared.


Copyright
The information and concepts contained in this document are the property of Hydrology and Water Management
Consulting Pty Ltd (HWMC). Use or copying of this document in whole or in part without the written permission of HWMC
constitutes an infringement of copyright.




Document Details

    Item No.                  Data
    Report Title              Noosa Landfill RRA Flood Assessment
    Prepared For              Noosa Council
    Date                      6/04/2022
    Document Ref              J00352R1V2
    Report Status             Final
    Prepared By:
    Name                      Rob Stewart
    Qualifications            BE (Civil)
    Certification By:
    Name                      Rob Stewart
    RPEQ No                   13272
    Signature




J00352R1V2                                                                                                            ii

Page 6

Noosa Landfill RRA Flood Assessment




                                                                 TABLE OF CONTENTS

1      INTRODUCTION ............................................................................................................................................... 1
2      AVAILABLE DATA ............................................................................................................................................. 2
3      BASE CASE MODELLING ................................................................................................................................... 3
     3.1       HYDRAULIC MODEL SOFTWARE ............................................................................................................................. 3
     3.2       TOPOGRAPHY ..................................................................................................................................................... 3
     3.3       STRUCTURES ...................................................................................................................................................... 4
     3.4       HYDRAULIC ROUGHNESS....................................................................................................................................... 5
     3.5       DESIGN RAINFALL ................................................................................................................................................ 6
4      VALIDATION .................................................................................................................................................... 7
5      PROPOSED CASE MODELLING .......................................................................................................................... 8
6      RESULTS ......................................................................................................................................................... 10
7      ADVICE RELATING TO FUTURE PLANNING AND DESIGN ................................................................................. 12
8      CONCLUSIONS ............................................................................................................................................... 13
9      QUALIFICATIONS & LIMITATIONS .................................................................................................................. 14
10     REFERENCES .................................................................................................................................................. 15




List of Appendices

    Appendix A               Rational Method and Design Rainfall
    Appendix B               Base Case Flood Mapping
    Appendix C               Proposed Case Flood Mapping
    Appendix D               Peak Flood Level Impact Mapping




J00352R1V2                                                                                                                                                                   iii

Page 7

Noosa Landfill RRA Flood Assessment




Abbreviations

 1D              One-Dimensional
 2D              Two-Dimensional
 AEP             Annual Exceedance Probability
 ARI             Average Recurrence Interval
 AHD             Australian Height Datum
 ARR             Australian Rainfall and Runoff
 BoM             Bureau of Meteorology
 DEM             Digital Elevation Model
 DFE             Design Flood Event
 DTMR            Department of Transport and Main Roads (Queensland)
 EY              Exceedances Per Year
 FHO             Flood Hazard Overlay
 FMS             Flood Management Strategy
 GIS             Geographic Information Systems
 HWMC            Hydrology and Water Management Consulting Pty Ltd
 EA              Engineers Australia
 FI              Fraction Impervious
 IFD             Intensity Frequency Duration (rainfall intensity data)
 MRM             Modified Rational Method
 RCP             Reinforced Concrete Pipe
 RCBC            Reinforced Concrete Box Culvert
 RFFE            Regional Flood Frequency Estimation
 RRA             Resource Recovery Area
 TIN             Triangular Irregular Network
 TMR             Department of Transport and Main Roads (QLD Gov)
 QUDM            Queensland Urban Drainage Manual




J00352R1V2                                                                iv

Page 8

Noosa Landfill RRA Flood Assessment



1 INTRODUCTION
Hydrology and Water Management Consulting Pty Ltd (HWMC) has been commissioned by Noosa
Council to carryout flood modelling to assess the potential impact of proposed filling associated
with the expansion of the Resource Recovery Area (RRA) at the Noosaville Landfill Site.

The purpose of this assessment is to:

    1. Determine design flood levels that can be used to define minimum floor levels on the site.
    2. Determine whether the proposed fill is expected to cause any adverse flood impacts.

The landfill site is located at 561 Eumundi Noosa Rd, Doonan. The location of the proposed filling
area is shown on Image 1-1




Image 1-1 Proposed Fill Location




J00352R1V2                                                                                     1

Page 9

Noosa Landfill RRA Flood Assessment



2 AVAILABLE DATA
The following information has been supplied to HWMC for use in this project.


Table 2-1      Information Used for this Investigation

    Item
               Information Source
    No.

       1       Aerial imagery and LiDAR of the Landfill Site captured in 2020 by Drone IQ.

       2       Preliminary Stormwater Catchments Plans by Topo (Feb 2021),

       3       Aerial LiDAR Survey captured in 2015.

       4       Design Rainfall Information from the Bureau of Meteorology (BoM).




J00352R1V2                                                                                   2

Page 10

Noosa Landfill RRA Flood Assessment



3 BASE CASE MODELLING
Base case flood modelling has been undertaken with the site in its existing condition.

3.1    Hydraulic Model Software
Hydraulic modelling has been carried out using TUFLOW HPC software developed by BMT WBM
in Brisbane. TUFLOW HPC is a 1D / 2D finite volume numerical model that is used to simulate
hydrodynamic flow in rivers, floodplains and urban catchments. It is widely used in Australia and
overseas.

TUFLOW HPC version 2020-10-AA_64_iSP has been used for this investigation.

3.2    Topography
Model topography is defined using a 2D fixed grid with a 3m cell size. TUFLOW’s Sub Grid
Sampling with a 1m grid size has also been applied to enable the 3m cells to better reflect ground
levels.

Model topography levels are based on Noosa Council’s 2015 Aerial LiDAR Survey (ALS) external
to the site. The landfill site is represented using 2020 LiDAR collected by a drone. Where
necessary local adjustments have been made to ensure key features such as road embankments
are correctly represented in the model.

Model ground levels in the vicinity of the site are shown on Image 3-2.




J00352R1V2                                                                                     3

Page 11

Noosa Landfill RRA Flood Assessment




Image 3-1 Base Case Model Ground Levels in Vicinity of the Site


3.3    Structures
Hydraulic structures have been incorporated into the model based on field inspections and on
council GIS data. There are no pipes or culverts that have a significant impact on flooding
characteristics at the proposed RRA expansion area and therefore survey of hydraulic structures
has not been carried out. Pipes and culverts have been modelled as 1D network elements with
zero blockage. Hydraulic structure locations are shown on Image 3-2.




J00352R1V2                                                                                  4

Page 12

Noosa Landfill RRA Flood Assessment




Image 3-2 Hydraulic Structure Locations


3.4     Hydraulic Roughness
Manning’s ‘n’ hydraulic roughness values applied to the TUFLOW modelling are shown on Table
3-1.

Table 3-1        Manning’s ‘n’ Values

      Landuse / Surface Type                                    Manning’s ‘n’

      Cleared Open Space / Site                                     0.04

      Light Vegetation / Rural Residential                          0.06

      Roads                                                         0.02

      Bushland                                                      0.10

      Waterbodies                                                   0.03

      Culverts                                                      0.013




J00352R1V2                                                                              5

Page 13

Noosa Landfill RRA Flood Assessment


3.5       Design Rainfall
Design rainfall has been applied to the model using direct rainfall on grid. ARR2019 ensemble
temporal patterns have been applied to the model for a range of duration events and then peak
flood characteristics have been selected at each cell based on the critical duration and the
associated median ensemble pattern. This process is undertaken using TUFLOW result
processing tools and is undertaken for each individual cell in the model. This methodology is in
accordance with the latest ARR2019 guidelines.

Modelling has been undertaken for events with durations of 30, 60, 120 and 180 minutes.

Modelling has been carried out for the following design event probabilities for the base case and
proposed case modelling:

      •    50% AEP (Q2)
      •    10% AEP (Q10)
      •    1% AEP Current Climate (Q100)
      •    1% AEP Year 2100 Climate

The following ‘rare’ events have also been simulated for the proposed case:

      •    0.5% AEP (Q200)
      •    0.2% AEP (Q500)
      •    0.1% AEP (Q1000)

The latest available design rainfall intensity data has been taken from the Bureau of Meteorology
(BoM) IFD website.




J00352R1V2                                                                                    6

Page 14

Noosa Landfill RRA Flood Assessment



4 VALIDATION
Validation of peak flows at the proposed RRA fill site has been carried out against a Rational
Method peak flow calculation. Details of the Rational Method calculation are provided in Appendix
A. The peak flow comparison shown below demonstrates a good level of agreement between the
TUFLOW results and the Rational Method.


Table 4-1      Peak Flow Validation at Northern Boundary of the Landfill Site

    Rational Method Peak Flow (1% AEP)            12.8 m3/s

    TUFLOW Peak Flow (1% AEP)
    (Critical Duration of 30 minutes)             14.0 m3/s

    Difference                                     + 9.4%




J00352R1V2                                                                                    7

Page 15

Noosa Landfill RRA Flood Assessment



5 PROPOSED CASE MODELLING
The proposed RRA fill pad has been incorporated into the model using TUFLOW z-point modifiers.
The site fill area has been raised to above the DFE flood level and graded to fall northwards.
Details of the proposed case model topography are shown on image 5-1.




Image 5-1 Proposed Case Model Topography


The proposed case ground level assumptions modelled are appropriate for an initial constraints
assessment but will need to be refined as part of future detail design.

Finished floor levels of any buildings constructed on the fill pad will need to achieve the minimum
levels shown on Image 5-2. This will ensure finished floor levels are a minimum of 300mm above
the DFE peak flood levels.




J00352R1V2                                                                                      8

Page 16

Noosa Landfill RRA Flood Assessment




Image 5-2 Minimum floor heights (300mm freeboard above 1% AEP Year 2100 Flood)




J00352R1V2                                                                       9

Page 17

Noosa Landfill RRA Flood Assessment



6 RESULTS
Base Case and Proposed Case peak flood depth maps are provided in Appendix B and C
respectively. Modelling predicts that the area of proposed filling is subject to peak depths of up to
approximately 700mm in the base case modelling of the DFE event. Peak DFE flood levels are
predicted to increase by up to approximately 600mm around the fill pad in the proposed case.

Peak flood level impact mapping is provided in Appendix D. For ease of reference an extract of
the DFE peak flood level impact map is provided on Image 6-1. The impact mapping shows that
the proposed fill pad is predicted to cause a re-distribution of floodwaters across the northern site
boundary. There are increased flood levels on the western side of the floodplain and reduced
levels on the eastern side downstream of the fill pad. These impacts occur in bushland areas only
so are likely to be of no consequence. If necessary, it would be possible to significantly mitigate
this effect by including a flow spreading channel along the norther edge of the fill.

The predicted flood level increases do not affect any infrastructure on the site or the surrounding
area.

Proposed case peak flood levels in the drains surrounding the RRA fill pad are shown on Image 6-
2.

Proposed case peak flood velocities in the area are less than approximately 1.2m/s.




Image 6-1 Extract of the 1% AEP Year 2100 Peak Flood Level Impact Map (DFE)


J00352R1V2                                                                                        10

Page 18

Noosa Landfill RRA Flood Assessment




Image 6-2 Design Flood Levels Adjacent to RRA Fill Pad




J00352R1V2                                               11

Page 19

Noosa Landfill RRA Flood Assessment



7 ADVICE RELATING TO FUTURE PLANNING AND DESIGN
This assessment has considered a preliminary design of the RRA fill pad. As further design and
planning of this facility proceeds it is likely that the RRA filling will be revised. It is recommended
that HWMC be consulted through this process to ensure that the positive outcomes for this
assessment are maintained.

The fill pad modelled for this assessment excludes filling over the existing bioretention system
northeast of the RRA. HWMC foresee no issue with this bioretention system being removed to
make way for the RRA provided that the site’s water quality obligations are met and site runoff to
this location is appropriately managed.

The fill pad modelled for the current assessment directs local RRA runoff northwards. This was
done to provide a level of conservatism to the results by not having RRA runoff be subject to
storage attenuation associated with the existing sediment pond south of the RRA. HWMC foresee
no issue with directing RRA runoff to the existing sediment pond to the south however this is likely
to alter internal site flood levels and therefore analysis should be undertaken to ensure facilities
maintain appropriate levels of flood immunity.




J00352R1V2                                                                                          12

Page 20

Noosa Landfill RRA Flood Assessment



8 CONCLUSIONS
Hydrology and Water Management Consulting Pty Ltd has completed this flood assessment to
inform preliminary planning and design of a proposed Resource Recovery Area (RRA) at the
Noosaville Landfill Site. This work has been completed for Noosa Council.

Detailed flood models have been established and validated. These have been used to create flood
maps for the existing and proposed cases. The impact on peak design flood levels likely to be
caused by the RRA filling has been described. There is a re-distribution of floodwaters in the
floodplain downstream of the filling however there are no adverse impacts that are likely to affect
any infrastructure on the site or surrounding area.

Results of this assessment should be used to guide planning and design of the project. Flood
modelling will need to be updated as part of future design to ensure positive flood outcomes are
achieved.




J00352R1V2                                                                                      13

Page 21

Noosa Landfill RRA Flood Assessment



9 QUALIFICATIONS & LIMITATIONS
In preparing this report, HWMC has relied upon and assumed accurate data provided by Noosa
Council. Unless otherwise stated in this report, HWMC has not attempted to verify the accuracy
or completeness of any such information. The accuracy of this report is reliant upon the accuracy
of this information.

The results presented in this report are based on modelling of theoretical design flood events. It
is not possible to investigate all possible combinations of real-world storm conditions and it is
important to note that actual flood characteristics and associated impacts may differ from those
presented in this report.

The level of detailed provided in this investigation is appropriate for supporting the current planning
and preliminary design phase of this development. Additional analysis will be required as the
project progresses to more detailed planning and design phases.

This report should be read in full and no excerpts are to be taken as representative of the findings.
No responsibility is accepted by HWMC for use of any part of this report in any other context.

Study results should not be used for purposes other than those for which they were prepared.




J00352R1V2                                                                                          14

Page 22

Noosa Landfill RRA Flood Assessment



10 REFERENCES


    1. BMT WBM, 2018, “TUFLOW User Manual”
    2. Ball J, Babister M, Nathan R, Weeks W, Weinmann E, Retallick M, Testoni I, (Editors),
       Commonwealth of Australia, 2016, “Australian Rainfall and Runoff: A Guide to Flood
       Estimation”
    3. Institute of Public Works Engineering Australasia, Queensland Government, 2016,
       “Queensland Urban Drainage Manual, 4th Edition” (QUDM)
    4. Michael Boyd et al, 2012, “WBNM User Guide”
    5. Michael Boyd et al, 2007, “Details of the Theory Used in WBNM”




J00352R1V2                                                                               15

Page 23

APPENDIX A

Rational Method and Design Rainfall

Page 24

RATIONAL METHOD SUMMARY & RAINFALL DATA

Project:
Location:

Design Rainfall Depths (mm)

J00352_Noosa_Landfill_RRA_Flood_Assessment
Northern Site Outlet

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Duration 63.2% 50% 20% 10% 5% 2% 1%
Duration (minutes) AEP AEP AEP AEP AEP AEP AEP
1 min 1 2.85 3.22 4.36 5.11 5.82 6.73 7.40
2 min 2 4.82 5.48 7.56 8.99 10.40 12.30 13.80
3 min 3 6.81 7.73 10.60 12.60 14.50 17.10 19.10
4min 4 8.64 9.80 13.40 15.80 18.20 21.30 23.60
5 min 5 10.30 11.70 15.90 18.70 21.40 24.90 27.60
10 min 10 16.90 19.10 25.70 30.00 34.10 39.20 43.00
15 min 15 21.50 24.20 32.60 38.10 43.20 49.60 54.40
20 min 20 25.00 28.20 38.00 44.40 50.40 58.10 63.70
25 min 9) 27.80 31.50 42.50 49.70 56.50 65.30 71.70
30 min 30 30.20 34.20 46.30 54.20 61.80 71.60 78.90
45 min 45 35.90 40.60 55.50 65.30 74.90 87.40 96.90
1 hour 60 40.20 45.60 62.70 74.20 85.40 100.00 112.00
1.5 hour 90 46.80 53.40 74.20 88.40 103.00 121.00 136.00
2 hour 120 52.10 59.60 83.60 100.00 117.00 139.00 156.00
3 hour 180 60.60 69.70 99.00 119.00 140.00 168.00 190.00
4.5 hour 270 70.80 81.90 118.00 143.00 168.00 203.00 230.00
6 hour 360 79.30 92.10 133.00 163.00 192.00 232.00 264.00
9 hour 540 93.20 109.00 159.00 195.00 231.00 281.00 320.00
12 hour 720 105.00 122.00 180.00 222.00 264.00 321.00 367.00
18 hour 1080 122.00 144.00 213.00 264.00 315.00 386.00 | 442.00
24 hour 1440 136.00 160.00 239.00 296.00 356.00 | 437.00 503.00
30 hour 1800 148.00 173.00 260.00 323.00 389.00 | 480.00 553.00
36 hour 2160 157.00 184.00 277.00 345.00 | 416.00 516.00 597.00
48 hour 2880 172.00 202.00 304.00 380.00 | 460.00 574.00 667.00
72 hour 4320 192.00 225.00 340.00 | 427.00 520.00 654.00 766.00
96 hour 5760 206.00 241.00 363.00 | 458.00 559.00 706.00 829.00
120 hour 7200 216.00 253.00 381.00 | 479.00 586.00 741.00 871.00
144 hour 8640 225.00 262.00 394.00 | 496.00 606.00 765.00 898.00
168 hour 10080 232.00 271.00 | 406.00 509.00 621.00 781.00 914.00
Catchment Data
Details: Northern Site Outlet
Variable Value Units
Area: 37.00 ha
C10 0.70 fraction
Rational Method Summary
Time of Concentration (tc) 34.0 _ Minutes (or 0.57 hours)
63.2% 50% 20% 10% 5% 2% 1%
Variable AEP AEP AEP AEP AEP AEP AEP
Freq Factor 0.80 0.85 0.95 1.00 1.05 1.15 1.20
Intensity (mm/hr) 56.22 63.63 86.41 101.31 115.73 134.37 148.35
Discharge (m3/s) 3.24 3.89 5.91 7.29 8.75 11.13 12.82

 

 

 

 

 

 

 

 

 

 

Page 25

APPENDIX B

Base Case Flood Mapping

Page 26

             LEGEND
                     DCDB
                     1m Contour (2015 LiDAR)
                     Model Extent
                     Downstream Boundary
                     Culvert (1d_nwk)




                        Depth (m)
                                 <= 0.2
                                 0.2 - 0.5
                                 0.5 - 0.75
                                 0.75 - 1
                                 1 - 1.25
                                 1.25 - 1.5
                                 1.5 - 1.75
                                 1.75 - 2
                                 >2

   Flood mapping only shown where depths are
   greater than 50mm




© Hydrology and Water Management Consulting Pty Ltd (HWMC) 2021.
HWMC endeavours to ensure that the information contained in this
figure is correct at the time of publication. Furthermore, HWMC makes
no representations, warranties or guarantees about its accuracy,
reliability, completeness or suitability for any particular purpose.

HWMC Ref: J00352_Noosa_Landfill_RRA_Flood_Assessment



  Noosa Landfill RRA Flood Assessment

                      Peak Flood Depth

                        Base Case
                   (TUFLOW Case B01a)

                      1% AEP Event
               Future Climate at Year 2100

                    Client: Noosa Council

            Plan Ref: J00352_B01a_d_1pcAEP_CC

Page 27

             LEGEND
                     DCDB
                     1m Contour (2015 LiDAR)
                     Model Extent
                     Downstream Boundary
                     Culvert (1d_nwk)




                        Depth (m)
                                 <= 0.2
                                 0.2 - 0.5
                                 0.5 - 0.75
                                 0.75 - 1
                                 1 - 1.25
                                 1.25 - 1.5
                                 1.5 - 1.75
                                 1.75 - 2
                                 >2

   Flood mapping only shown where depths are
   greater than 50mm




© Hydrology and Water Management Consulting Pty Ltd (HWMC) 2021.
HWMC endeavours to ensure that the information contained in this
figure is correct at the time of publication. Furthermore, HWMC makes
no representations, warranties or guarantees about its accuracy,
reliability, completeness or suitability for any particular purpose.

HWMC Ref: J00352_Noosa_Landfill_RRA_Flood_Assessment



  Noosa Landfill RRA Flood Assessment

                      Peak Flood Depth

                        Base Case
                   (TUFLOW Case B01a)

                         1% AEP Event


                    Client: Noosa Council

              Plan Ref: J00352_B01a_d_1pcAEP

Page 28

             LEGEND
                     DCDB
                     1m Contour (2015 LiDAR)
                     Model Extent
                     Downstream Boundary
                     Culvert (1d_nwk)




                        Depth (m)
                                 <= 0.2
                                 0.2 - 0.5
                                 0.5 - 0.75
                                 0.75 - 1
                                 1 - 1.25
                                 1.25 - 1.5
                                 1.5 - 1.75
                                 1.75 - 2
                                 >2

   Flood mapping only shown where depths are
   greater than 50mm




© Hydrology and Water Management Consulting Pty Ltd (HWMC) 2021.
HWMC endeavours to ensure that the information contained in this
figure is correct at the time of publication. Furthermore, HWMC makes
no representations, warranties or guarantees about its accuracy,
reliability, completeness or suitability for any particular purpose.

HWMC Ref: J00352_Noosa_Landfill_RRA_Flood_Assessment



  Noosa Landfill RRA Flood Assessment

                      Peak Flood Depth

                        Base Case
                   (TUFLOW Case B01a)

                        10% AEP Event


                    Client: Noosa Council

             Plan Ref: J00352_B01a_d_10pcAEP

Page 29

             LEGEND
                     DCDB
                     1m Contour (2015 LiDAR)
                     Model Extent
                     Downstream Boundary
                     Culvert (1d_nwk)




                        Depth (m)
                                 <= 0.2
                                 0.2 - 0.5
                                 0.5 - 0.75
                                 0.75 - 1
                                 1 - 1.25
                                 1.25 - 1.5
                                 1.5 - 1.75
                                 1.75 - 2
                                 >2

   Flood mapping only shown where depths are
   greater than 50mm




© Hydrology and Water Management Consulting Pty Ltd (HWMC) 2021.
HWMC endeavours to ensure that the information contained in this
figure is correct at the time of publication. Furthermore, HWMC makes
no representations, warranties or guarantees about its accuracy,
reliability, completeness or suitability for any particular purpose.

HWMC Ref: J00352_Noosa_Landfill_RRA_Flood_Assessment



  Noosa Landfill RRA Flood Assessment

                      Peak Flood Depth

                        Base Case
                   (TUFLOW Case B01a)

                        50% AEP Event


                    Client: Noosa Council

             Plan Ref: J00352_B01a_d_50pcAEP

Page 30

APPENDIX C

Proposed Case Flood Mapping

Page 31

           LEGEND
                   DCDB
                   1m Contour (2015 LiDAR)
                   Model Extent
                   Downstream Boundary
                   Proposed Case Topo Modifier
                   Culvert (1d_nwk)




                        Depth (m)
                                 <= 0.2
                                 0.2 - 0.5
                                 0.5 - 0.75
                                 0.75 - 1
                                 1 - 1.25
                                 1.25 - 1.5
                                 1.5 - 1.75
                                 1.75 - 2
                                 >2

   Flood mapping only shown where depths are
   greater than 50mm




© Hydrology and Water Management Consulting Pty Ltd (HWMC) 2021.
HWMC endeavours to ensure that the information contained in this
figure is correct at the time of publication. Furthermore, HWMC makes
no representations, warranties or guarantees about its accuracy,
reliability, completeness or suitability for any particular purpose.

HWMC Ref: J00352_Noosa_Landfill_RRA_Flood_Assessment



  Noosa Landfill RRA Flood Assessment

                      Peak Flood Depth

                      Proposed Case
                   (TUFLOW Case P01a)

                      1% AEP Event
               Future Climate at Year 2100

                    Client: Noosa Council

            Plan Ref: J00352_P01a_d_1pcAEP_CC

Page 32

           LEGEND
                   DCDB
                   1m Contour (2015 LiDAR)
                   Model Extent
                   Downstream Boundary
                   Proposed Case Topo Modifier
                   Culvert (1d_nwk)




                        Depth (m)
                                 <= 0.2
                                 0.2 - 0.5
                                 0.5 - 0.75
                                 0.75 - 1
                                 1 - 1.25
                                 1.25 - 1.5
                                 1.5 - 1.75
                                 1.75 - 2
                                 >2

   Flood mapping only shown where depths are
   greater than 50mm




© Hydrology and Water Management Consulting Pty Ltd (HWMC) 2021.
HWMC endeavours to ensure that the information contained in this
figure is correct at the time of publication. Furthermore, HWMC makes
no representations, warranties or guarantees about its accuracy,
reliability, completeness or suitability for any particular purpose.

HWMC Ref: J00352_Noosa_Landfill_RRA_Flood_Assessment



  Noosa Landfill RRA Flood Assessment

                      Peak Flood Depth

                      Proposed Case
                   (TUFLOW Case P01a)

                         1% AEP Event


                    Client: Noosa Council

              Plan Ref: J00352_P01a_d_1pcAEP

Page 33

           LEGEND
                   DCDB
                   1m Contour (2015 LiDAR)
                   Model Extent
                   Downstream Boundary
                   Proposed Case Topo Modifier
                   Culvert (1d_nwk)




                        Depth (m)
                                 <= 0.2
                                 0.2 - 0.5
                                 0.5 - 0.75
                                 0.75 - 1
                                 1 - 1.25
                                 1.25 - 1.5
                                 1.5 - 1.75
                                 1.75 - 2
                                 >2

   Flood mapping only shown where depths are
   greater than 50mm




© Hydrology and Water Management Consulting Pty Ltd (HWMC) 2021.
HWMC endeavours to ensure that the information contained in this
figure is correct at the time of publication. Furthermore, HWMC makes
no representations, warranties or guarantees about its accuracy,
reliability, completeness or suitability for any particular purpose.

HWMC Ref: J00352_Noosa_Landfill_RRA_Flood_Assessment



  Noosa Landfill RRA Flood Assessment

                      Peak Flood Depth

                      Proposed Case
                   (TUFLOW Case P01a)

                        10% AEP Event


                    Client: Noosa Council

             Plan Ref: J00352_P01a_d_10pcAEP

Page 34

           LEGEND
                   DCDB
                   1m Contour (2015 LiDAR)
                   Model Extent
                   Downstream Boundary
                   Proposed Case Topo Modifier
                   Culvert (1d_nwk)




                        Depth (m)
                                 <= 0.2
                                 0.2 - 0.5
                                 0.5 - 0.75
                                 0.75 - 1
                                 1 - 1.25
                                 1.25 - 1.5
                                 1.5 - 1.75
                                 1.75 - 2
                                 >2

   Flood mapping only shown where depths are
   greater than 50mm




© Hydrology and Water Management Consulting Pty Ltd (HWMC) 2021.
HWMC endeavours to ensure that the information contained in this
figure is correct at the time of publication. Furthermore, HWMC makes
no representations, warranties or guarantees about its accuracy,
reliability, completeness or suitability for any particular purpose.

HWMC Ref: J00352_Noosa_Landfill_RRA_Flood_Assessment



  Noosa Landfill RRA Flood Assessment

                      Peak Flood Depth

                      Proposed Case
                   (TUFLOW Case P01a)

                        50% AEP Event


                    Client: Noosa Council

             Plan Ref: J00352_P01a_d_50pcAEP

Page 35

APPENDIX D

Peak Flood Level Impact Mapping

Page 36

           LEGEND
                   DCDB
                   1m Contour (2015 LiDAR)
                   Model Extent
                   Downstream Boundary
                   Proposed Case Topo Modifier
                   Culvert (1d_nwk)




                 Impact (mm)
                          Less than 200
                          -100 to -200
                          -50 to -100
                          -20 to -50
                          -10 to -20
                          10 to -10
                          10 to 20
                          20 to 50
                          50 to 100
                          100 to 200
                          Greater than 200
                          Was Wet - Now Dry
                          Was Dry - Now Wet


   Flood mapping only shown where depths are
   greater than 50mm




© Hydrology and Water Management Consulting Pty Ltd (HWMC) 2021.
HWMC endeavours to ensure that the information contained in this
figure is correct at the time of publication. Furthermore, HWMC makes
no representations, warranties or guarantees about its accuracy,
reliability, completeness or suitability for any particular purpose.

HWMC Ref: J00352_Noosa_Landfill_RRA_Flood_Assessment



  Noosa Landfill RRA Flood Assessment

                Peak Flood Level Impacts

             Proposed Case Vs Base Case
              (TUFLOW Case P01a - B01a)

                      1% AEP Event
               Future Climate at Year 2100

                    Client: Noosa Council

   Plan Ref: J00352_P01a_Diff_h_vs_B01a_1pcAEP_CC

Page 37

           LEGEND
                   DCDB
                   1m Contour (2015 LiDAR)
                   Model Extent
                   Downstream Boundary
                   Proposed Case Topo Modifier
                   Culvert (1d_nwk)




                 Impact (mm)
                          Less than 200
                          -100 to -200
                          -50 to -100
                          -20 to -50
                          -10 to -20
                          10 to -10
                          10 to 20
                          20 to 50
                          50 to 100
                          100 to 200
                          Greater than 200
                          Was Wet - Now Dry
                          Was Dry - Now Wet


   Flood mapping only shown where depths are
   greater than 50mm




© Hydrology and Water Management Consulting Pty Ltd (HWMC) 2021.
HWMC endeavours to ensure that the information contained in this
figure is correct at the time of publication. Furthermore, HWMC makes
no representations, warranties or guarantees about its accuracy,
reliability, completeness or suitability for any particular purpose.

HWMC Ref: J00352_Noosa_Landfill_RRA_Flood_Assessment



  Noosa Landfill RRA Flood Assessment

                Peak Flood Level Impacts

             Proposed Case Vs Base Case
              (TUFLOW Case P01a - B01a)

                         1% AEP Event


                    Client: Noosa Council

      Plan Ref: J00352_P01a_Diff_h_vs_B01a_1pcAEP

Page 38

           LEGEND
                   DCDB
                   1m Contour (2015 LiDAR)
                   Model Extent
                   Downstream Boundary
                   Proposed Case Topo Modifier
                   Culvert (1d_nwk)




                 Impact (mm)
                          Less than 200
                          -100 to -200
                          -50 to -100
                          -20 to -50
                          -10 to -20
                          10 to -10
                          10 to 20
                          20 to 50
                          50 to 100
                          100 to 200
                          Greater than 200
                          Was Wet - Now Dry
                          Was Dry - Now Wet


   Flood mapping only shown where depths are
   greater than 50mm




© Hydrology and Water Management Consulting Pty Ltd (HWMC) 2021.
HWMC endeavours to ensure that the information contained in this
figure is correct at the time of publication. Furthermore, HWMC makes
no representations, warranties or guarantees about its accuracy,
reliability, completeness or suitability for any particular purpose.

HWMC Ref: J00352_Noosa_Landfill_RRA_Flood_Assessment



  Noosa Landfill RRA Flood Assessment

                Peak Flood Level Impacts

             Proposed Case Vs Base Case
              (TUFLOW Case P01a - B01a)

                        10% AEP Event


                    Client: Noosa Council

     Plan Ref: J00352_P01a_Diff_h_vs_B01a_10pcAEP

Page 39

           LEGEND
                   DCDB
                   1m Contour (2015 LiDAR)
                   Model Extent
                   Downstream Boundary
                   Proposed Case Topo Modifier
                   Culvert (1d_nwk)




                 Impact (mm)
                          Less than 200
                          -100 to -200
                          -50 to -100
                          -20 to -50
                          -10 to -20
                          10 to -10
                          10 to 20
                          20 to 50
                          50 to 100
                          100 to 200
                          Greater than 200
                          Was Wet - Now Dry
                          Was Dry - Now Wet


   Flood mapping only shown where depths are
   greater than 50mm




© Hydrology and Water Management Consulting Pty Ltd (HWMC) 2021.
HWMC endeavours to ensure that the information contained in this
figure is correct at the time of publication. Furthermore, HWMC makes
no representations, warranties or guarantees about its accuracy,
reliability, completeness or suitability for any particular purpose.

HWMC Ref: J00352_Noosa_Landfill_RRA_Flood_Assessment



  Noosa Landfill RRA Flood Assessment

                Peak Flood Level Impacts

             Proposed Case Vs Base Case
              (TUFLOW Case P01a - B01a)

                        50% AEP Event


                    Client: Noosa Council

     Plan Ref: J00352_P01a_Diff_h_vs_B01a_50pcAEP

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.