Original source · versioned page text
SUPERSEDED - Complied Approved Plan - 132005.638.03
The original of this document is very large (120 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnNoosa Landfill RRA Flood Assessment Abbreviations 1D One-Dimensional 2D Two-Dimensional AEP Annual Exceedance Probability ARI Average Recurrence Interval AHD Australian Height Datum ARR Australian Rainfall and Runoff BoM Bureau of Meteorology DEM Digital Elevation Model DFE Design Flood Event DTMR Department of Transport and Main Roads (Queensland) EY Exceedances Per Year FHO Flood Hazard Overlay FMS Flood Management Strategy GIS Geographic Information Systems HWMC Hydrology and Water Management Consulting Pty Ltd EA Engineers Australia FI Fraction Impervious IFD Intensity Frequency Duration (rainfall intensity data) MRM Modified Rational Method RCP Reinforced Concrete Pipe RCBC Reinforced Concrete Box Culvert RFFE Regional Flood Frequency Estimation RRA Resource Recovery Area TIN Triangular Irregular Network TMR Department of Transport and Main Roads (QLD Gov) QUDM Queensland Urban Drainage Manual J00352R1V2 iv
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.