This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn AMENDMENTS
16-07-22 7.1 -- SHADE STRUCTURE MOVED 1000mm OFF
BOUNDARY LINE
X -
0
785
100
re landscape 7.1 5
APPROVED PLAN
post
entire waterfront 51995.1701.03
stee E2 NOOSA COUNCIL
8 AUGUST 2022
steel edge beam to engineers detail
l ed
ge b
eam
to e
ngin
eers
new roof deta
il
to line with existing
0
100
first floor balcony 7.1
3330
NEW SHADE STRUCTURE ROOF dotted line is
extent of new 900
roof over post gate powder room to be
demolished and
post reconstructed with new
Z Z
remove existing door wall, make good boil water demolish existing window and wall to
new timber and replace with new glass door unit under exhaust ground floor annd install new external
frame stairs swinging out stove 920w2100h alum frame glass door (frosted)and frame
700
and landing oven
line of existing
remove existing door
verandah sink and replace with new
on first floor
900 1400 600 plasterboard wall TME
E1
alum slid door 21w21h
X NEW
600
600
remove existing dw micro
remove existing post STORE
and replace with new kitchen and replace move ldy to remove existing concrete pathway
with new
450
waste first floor install new concrete slab, fall to sump
remove existing sliding door and tile over with new
intergrated
1200
and replace with new sliding door
500
dwr refrig
with security mesh screen
remove existing door
re landscape and steel frame, replace with new replace existing awning
entire waterfront remove existing post REMOVE ALL CORNICE
demolish part of existing wall solid core door and frame cover with new awing cover
and replace with new ARCHITRAVE AND SKIRTING
REPLACE WITH NEW SQR SET (the no loading part) and make good exist
CEILING, ARCH AND SKIRT shown red dotted pipe
from remove existing door
alum slid door 21w21h
increase bulkhead to line above and frame, replace with new
with opposite solid core door and frame
all secret doors-push to open
remove existing sliding door extend existing stair new kitchen pantry
and replace with new sliding door void cupboard to line cupboard and associated
with security mesh screen with existing ceiling joinery wall
bulkhead. construct in
joinery to match pantry
with secret touch door
GROUND FLOOR PLAN DRAWING PREPARED BY DEZIGNTEAM PROJECTS PTY LTD
BUILDING DESIGN OPEN QBCC Licence Number: 15268548
PROPOSED ALTERATIONS AND QUAY WEST DWG NO- DZT NOOSA / A 101 (7) SCALE 1:50 @ A3 DATE 18-02-2022
PROPOSED SHADE STRUCTURE ROOF LOT 5 GTP 104767 5/19 LABURNUM CRESCENT NOOSAVILLE QLD 4566
Document Set ID: 22066879
Version: 1, Version Date: 10/08/2022
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.