Skip to the record
Mmm.. taste the original NoosaWatch™

Original source · versioned page text

2017-12-12 Planning & Environment Committee Agenda

of 95

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (10.4 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                         12 DECEMBER 2017


    Car Parking
    9.    The rear carparking and garaging area must be used for staff parking and deliveries
          only.
    10.   All car parking areas and access driveways must be maintained exclusively for
          vehicle parking and manoeuvring and kept in a tidy and safe condition at all times.
          Stormwater Drainage
    11. Stormwater runoff from the development must be connected to the existing drainage
        system.
    Damage to Services and Assets
    12.   Any damage caused to existing services and assets as a result of the development
          works must be repaired at no cost to the asset owner at the following times:
          a.   where the damage would cause a hazard to pedestrian or vehicle safety,
               immediately; or
          b.   where otherwise, upon completion of the works associated with the
               development.
          Any repair work which proposes to alter the alignment or level of existing services
          and assets must first be referred to the relevant service authority for approval.
    Waste Disposal
    13.   The developer must provide waste storage and disposal facilities in accordance with
          Planning Scheme Policy No. 9 “Waste Management Multi-Dwellings and Commercial
          and Industrial Premises”. The facilities must include an external impervious area
          correctly sized for all refuse and recycling containers and suitably screened from
          public places and neighbouring properties. A bin wash area is required with a cold-
          water tap, hose and drain outlet connected to sewer, via a bucket trap. The drain
          outlet must be designed to prevent storm water entry to the sewerage system. This
          can be achieved with a nib wall 50mm high and up to 700mm x 700mm wide (max
          0.5m²), or alternatively the waste area can be roofed, or any other design approved
          by Council.
    14.   Refuse containers must be provided in accordance with the requirements of the
          Environmental Protection (Interim Waste) Regulation 1996 and (Waste Management)
          Regulation 2000, for the storage and collection of refuse.
    Site contamination
    15.   Within three months of the date of this approval a detailed site contamination
          assessment report prepared by a suitably qualified and experienced person in
          accordance with the procedures and practices detailed in the National Environment
          Protection (Assessment of Site Contamination) Measure 1999 (NEPM) must be
          prepared and submitted to Council. The report must conclude:
          a.   whether any site contamination associated with the dangerous goods
               infrastructure within the road reserve is causing, or is likely to cause,
               ‘environmental harm’ (as defined under the Environmental Management and
               Pollution Control Act 1994); and
          b.   whether any site contamination associated with the dangerous goods
               infrastructure within the road reserve presents an occupational health and
               safety risk to workers involved in redevelopment of the site.
          If the assessment report concludes that remediation and/or management strategies
          are necessary to avoid risks to human health or the environment, a proposed
          remediation and/or management plan must also be submitted to Council. Any
          remediation or management plan involving soil disturbance must include a detailed
          soil and water management plan to prevent off-site transfer of potentially-
          contaminated soil or stormwater.

                                                                               Page 73 of 95
Log in to download the original file

2017-12-12 Planning & Environment Committee Agenda(PDF, 10MB).pdf · 10.4 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.