Original PDF page 20, section 1. The text section number identifies this passage in the reader.

      LEGEND                                                                                                                                                                                  BACKFILL NOTE:
                                                                                        SLABS ON GROUND:                                                                                      ·        BACKFILL MATERIAL SHALL BE GRAVEL OR LIGHTLY COMPACTED                                                      RETENTION PILE SYSTEM
                                                                                                                                                                                                                                                                                                                   SHORING SYSTEM        NOTES:
                                                                                                                                                                                                                                                                                                                                      NOTES:
      SLABS                                                                             UNLESS NOTED OTHERWISE, ALL SLABS ON GROUND TO BE                                                              GRANULAR MATERIAL.                                                                                          ·    SHORING SYSTEM PILES TO BE DESIGNED, RPEQ CERTIFIED AND
               - DENOTES SLAB STEP - REFER ARCHITECT & DETAILS                          CONSTRUCTED AS FOLLOWS:                                                                               ·        CONTROLLED FILL TO BE PLACED, COMPACTED, TESTED AND                                                              INSTALLED BY A SPECIALIST CONTRACTOR IN ACCORDANCE WITH
       FALL
                                                                                        ·    120 THICK SLABS:
                                                                                             ###                                                                                                       CERTIFIED IN ACCORDANCE WITH AS3798 AND THE EARTHWORKS                                                           AS 2159 (AND ANY APPLICABLE STANDARDS REFERENCED THEREIN).
               - FALL DIRECTION IN SLAB - REFER ARCHITECT                                   REINFORCEMENT - SL82 FABRIC TOP                                                                            PROCEDURE OUTLINED IN THE GEOTECHNICAL REPORT.                                                                   SHORING SYSTEM PILES TO BE DESIGNED FOR THE TEMPORARY
               - XX DEEP WET AREA SETDOWN.                                                  N12 CONTINUOUS PERIMETER TRIMMERS ALL EDGES (500 LAP)                                                                                                                                                                       CASE (i.e. BRACED, ANCHORED OR CANTILEVERED DURING
        X
      -X




                 (50mm MAXIMUM SETDOWN - CONFIRM WITH ARCHITECT)                                                                                                                                                                                                                                                        CONSTRUCTION) AND THE PERMANENT CASE (i.e. PROPPED BY
                                                                                        ·     200 THICK SLABS OVER BACKFILL (N.S.O.P.):
       120     - DENOTES SLAB ON GRADE THICKNESS
                                                                                            REINFORCEMENT - SL82 FABRIC TOP                                                                  NOTE:                                                                                                                      BUILDING SLABS) INCLUDING ANY IMPOSED BUILDING LOADS
                                                                                                                                                                                             THE PRINCIPLE CONTRACTOR IS TO NOTIFY THE STRUCTURAL ENGINEER                                                              SPECIFIED ON THESE DRAWINGS.
      DKJ - DOWELLED KEY JOINT - REFER DETAIL                                                               - SL92 FABRIC BOTTOM
                                                                                            N12 CONTINUOUS PERIMETER TRIMMERS ALL EDGES (500 LAP)                                            OF ANY EASEMENTS, SERVICES, OBSTRUCTIONS ETC. CONTAINED ON OR
      ET# - SLAB EDGE THICKENING - REFER DETAIL                                                                                                                                              AROUND THE SITE PRIOR TO CONSTRUCTION AS THIS FOUNDATION                                                              ·    THE BUILDER IS RESPONSIBLE FOR ENSURING THAT THE SPECIALIST
                                                                                                                                                                                             DESIGN MAY NEED TO BE AMENDED.                                                                                             SHORING SYSTEM CONTRACTOR COMPLIES WITH THE INTENDED
                                                                                        ·   WHERE SAW CUTS ARE REQUIRED AT 200 THICK SLAB ZONES, STOP                                                                                                                                                                   DESIGN AND CONSTRUCTION PERFORMANCE CRITERIA. EXTENT,
      FOOTINGS                                                                              BOTTOM FABRIC 50mm EACH SIDE OF JOINT & INCREASE SAW CUT                                                                                                                                                                    LAYOUT, LEVELS OF SHORING SYSTEM, ELEVATIONS AND SECTION
                                                                                            DEPTH LOCALLY TO 60mm.                                                                                                                                                                                                      DETAILS ARE TO BE CONFIRMED ON SITE BY CONTRACTOR SUBJECT
      FB# - FOOTING BEAM - REFER DETAILS
                                                                                                                                                                                                                                                                                                                        TO GEOTECHNICAL ENGINEER'S ADVICE.
             - DENOTES SCREW PILE TO ALLOWABLE WORKING LOAD INSTALLED                   ·   REFER PAVEMENT & SUBBASE PREPARATION NOTES FOR
               TO PILING CONTRACTORS DESIGN & CERTIFICATION                                 FOUNDING REQUIREMENTS.                                                                                                                                                                                                 ·    REFER XXXXXXXXXXXXXXXXXXX PLAN FOR CAPPING BEAM LEVELS
      FTG - DENOTES FOOTING STEP - REFER DETAIL                                                                                                                                                                                                                                                                         AND VERTICAL LOADS. THE LOADS PROVIDED ARE ULTIMATE
                                                                                        ·   ALL SLAB JOINTS ARE TO BE REFLECTED THROUGH BRITTLE                                                                                                                                                                         MAXIMUM LOADS APPLIED TO CAPPING BEAM FOR PILE DESIGN. THE
                                                                                            FINISHES.                                                                                                                                                                                                                   SHORING CONTRACTOR IS TO NEGLECT COMBINED AXIAL FORCES
      WALLS/COLUMNS UNDER AND/OR OVER                                                                                                                                                                                                                                                                                   TO DETERMINE CRITICAL BENDING MOMENTS FOR PILING DESIGN.
                                                                                        ·   REFER GENERAL NOTES SHEET 1.0 FOR CONCRETE GRADE, COVER
               - DENOTES LOAD BEARING WALL/COLUMN UNDER                                     AND ADDITIONAL DETAILS.                                                                                                                                                                                                ·    SHORING PILES TO BE DESIGNED FOR ANY ULTIMATE BENDING
               - DENOTES LOAD BEARING BLOCK OVER - BW1 U.N.O                                                                                                                                                                                                                                                            MOMENTS RESULTING FROM ECCENTRIC LOADING AND PERMISSIBLE
                                                                                                                                                                                                                                                                                                                        POSITIONAL DEVIATIONS OUTLINED IN SECTION 7.2 OF AS2159.
               - DENOTES NON LOAD BEARING BLOCK OVER - BW1 U.N.O
                                                                                        WATERPROOFING NOTE:                                                                                                                                                                                                             WHERE POSITIONAL TOLERANCES EXCEED THE LIMITS OF AS2159,
               - DENOTES LOAD BEARING CONCRETE WALL/COLUMN/RCB OVER -                   A CONTINUOUS WATERPROOFING SYSTEM IS TO BE APPLIED AND                                                                                                                                                                          WESTERA PARTNERS ARE TO BE NOTIFIED PRIOR TO COMMENCING
                 CW1 U.N.O                                                              CERTIFIED BY A SPECIALIST WATERPROOFING CONTRACTOR ENGAGED                                                                                                                                                                      FURTHER CONSTRUCTION WORKS.
                                                                                        BY THE BUILDER. THE WATERPROOFING SYSTEM IS TO INCLUDE ALL SLAB
                                                                                        AND WALL JOINT SEALANTS/WATERSTOPS AS REQUIRED. REFER                                                                                                                                                                      ·    MAXIMUM LATERAL DEFLECTION OF SHORING SYSTEM TO BE 15mm
      BLOCK / MASONRY WALLS & COLUMNS                                                                                                                                                                                                                                                                                   AT NATURAL SURFACE LEVEL. APPROPRIATE SURVEY MARKS ARE TO
                                                                                        ARCHITECT FOR FURTHER DETAILS.
      BW# - BLOCK WALL OVER - REFER SCHEDULE ON SHEET 2.0                                                                                                                                                                                                                                                               BE PLACED ALONG TOP OF WALL AT 7.5m CRS AND PLAN LOCATION
                                                                                                                                                                                                                                                                                                                        IS TO BE PROVIDED TO +/- 3mm BY A LICENSED SURVEYOR
      BCJ - BLOCK CONTROL JOINT - REFER DETAIL ON SHEET 2.0

                                                                                                                                                                                                                                                                                                                                             TBC
                                                                                                                                                                                                                                                                                                                        IMMEDIATELY AFTER INSTALLATION OF SHORING SYSTEM.
                                                                                        TEMPORARY EXCAVATION BATTER
      NLB - NON LOAD BEARING BLOCKWORK WALL - REFER DETAIL
                                                                                        A SAFE TEMPORARY EXCAVATION TO BE BATTERED/BENCHED IN                                                                                                                                                                      ·    IT IS THE CONTRACTORS RESPONSIBILITY TO OBTAIN ALL
                                                                                        ACCORDANCE WITH GEOTECHNICAL ENGINEERS REQUIREMENTS. TO BE                                                                                                                                                                      NECESSARY APPROVALS FOR SHORING SYSTEM (INCLUDING
                                                                                        CONFIRMED ON SITE.
      CONCRETE COLUMNS, WALLS & BEAMS                                                                                                                                                                                                                                                                                   GROUND ANCHORS WHERE APPLICABLE) AND TO LOCATE AND
                                                                                                                                                                                                                                                                                                                        AVOID CLASHES WITH ALL SERVICES LIKELY TO BE AFFECTED.
      CW# - CONCRETE WALL - REFER DETAIL ON SHEET 2.2
                                                                                        CONTROLLED FILL MATERIAL                                                                                                                                                                                                   ·    TO LIMIT THE IMPACT ON NEIGHBOURING PROPERTY AND
      NOTES:                                                                            CONTROLLED FILL TO BE PLACED, COMPACTED, TESTED AND CERTIFIED IN                                                                                                                                                                INFRASTRUCTURE DURING INSTALLATION (SUCH AS NOISE &
                                                                                        ACCORDANCE WITH AS3798 AND THE EARTHWORKS PROCEDURE OUTLINED                                                                                                                                                                    VIBRATION) IMPLEMENTATION OF THE FOLLOWING MEASURES (BUT
      N1 - FOOTING BEAM TO BLOCKWORK CONNECTION - REFER DETAIL                          BY THE PROJECT ENGINEER IN THE GEOTECHNICAL REPORT.                                                                                                                                                                             NOT LIMITED TO) ARE RECOMMENDED:
                                                                                                                                                                                                                                                                                                                          - SURVEY AND VIBRATION MONITORING
                                                                                                                                                                                                                                                                                                                          - DILAPIDATION REPORTS OF NEIGHBOURING PROPERTIES
                                                                                        BCJ - DENOTES BLOCKWORK CONTROL JOINT.
                                                                                        ·    WHERE NOT SPECIFICALLY LOCATED ON PLAN, THE BUILDER IS TO                                                                                                                                                             ·    THE PROPOSED SHORING SYSTEM DESIGN DOCUMENTATION SHALL
                                                                                             CLEARLY MARK THE PROPOSED LOCATIONS OF ALL BCJ'S ON A PLAN                                                                                                                                                                 BE SUBMITTED TO WESTERA PARTNERS FOR REVIEW PRIOR TO
                                                                                             FOR APPROVAL BY THE ARCHITECT AND ENGINEER.                                                                                                                                                                                EXCAVATION. THIS DOCUMENTATION SHALL INCLUDE:
                                                                                        ·    BCJ LOCATIONS ARE TO COMPLY WITH NOTE M16 ON SHEET 1.1 AND
                                                                                             THE TYPICAL DETAILS ON SHEET 2.0.                                                                                                                                                                                     -    PROPOSED SHORING PILE LAYOUTS AND BRACING/ANCHORING
 FOUNDATION CRITERIA                                                                                                                                                                                                                                                                                                    REQUIREMENTS.
 FOOTING BEAMS TO BE SUPPORTED VIA SCREW PILES TO SOCKET INTO                                                                                                                                                                                                                                                      -    ALL APPLICABLE DETAILS, NOTES AND DESIGN ASSUMPTIONS
 MEDIUM DENSE (OR DENSER) SAND WITH A MINIMUM ALLOWABLE END                                                                                                                                                                                                                                                        -    PROPOSED INSTALLATION SEQUENCE/METHODOLOGY.
 BEARING CAPACITY OF 600kPa.                                                            EXISTING SERVICES:                                                                                                                                                                                                         -    LOADS TO BE IMPOSED BY THE SHORING SYSTEM ON THE BUILDING
                                                                                        ·    EXISTING SERVICES (SEWER & STORMWATER ETC. AS APPLICABLE)                                                                                                                                                                  STRUCTURE, OR ANY PART OF THE SHORING SYSTEM TO BE
 WHERE FOOTINGS NOT SUPPORTED VIA SCREW PILES FOOTINGS TO FOUND                              AND PROPERTY CONNECTION TO BE ACCURATELY LOCATED ON                                                                                                                                                                        DESIGNED BY ANOTHER PARTY (e.g. SHOTCRETE INFILL AND
 INTO MEDIUM DENSE SAND (OR DENSER) WITH A MINIMUM ALLOWABLE                                 SITE PRIOR TO CONSTRUCTION. CLEARANCES TO BE IN                                                                                                                                                                            CAPPING BEAM).
 BEARING CAPACITY OF 100kPa                                                                  ACCORDANCE WITH QDC. MP1.4 AND LOCAL COUNCIL AUTHORITY.                                                                                                                                                               -    THE PILING CONTRACTOR IS TO CONFIRM THE SHORING SYSTEM
                                                                                                                                                                                                                                                                                                                        DESIGN DOCUMENTATION REMAINS VALID DURING EXCAVATION
 WHERE GROUND SLABS FOUNDED ON NATURAL SOILS/FILL FOOTINGS TO                           ·    NO HEAVY MACHINERY IS TO BE USED OVER EASEMENT ZONES.                                                                                                                                                                      WORKS.
 FOUND INTO RECOMPACTED/MEDIUM DENSE SAND WITH A MINIMUM                                     UNLESS APPROVED BY THE RELEVANT AUTHORITY.
 ALLOWABLE BEARING CAPACITY OF 100kPa TO SUIT A SOIL REACTIVITY OF A
                                                                                                                                                                                                                                                                                                                   ·    THE PILING CONTRACTOR IS TO NOTIFY THE ARCHITECT AND
 CLASS 'S'
                                                                                        ·    SERVICE LOCATIONS ARE TO BE PROVIDED TO WESTERA PARTNERS                                                                                                                                                                   ENGINEER OF ANY SHORING PILE DISCREPANCIES COMPARED TO
                                                                                             FOR REVIEW PRIOR TO CONSTRUCTION. ANY VARIATIONS OR                                                                                                                                                                        CONSULTANT DOCUMENTATION.
 ALL FOUNDING STRATA IN THE BASE OF FOOTINGS (NOT SUPPORTED VIA
 SCREW PILES) TO BE INSPECTED BY A SUITABLY QUALIFIED AND                                    CLASHES WITH PROPOSED FOOTINGS ARE TO BE SUBMITTED TO
 EXPERIENCED GEOTECHNICAL ENGINEER.                                                          WESTERA PARTNERS FOR REVIEW AND ADVICE PRIOR TO FOOTING                                                                                                                                                               ·    PILE TOLERANCES ARE TO NOT EXCEED ±75mm - REFER PILING
 ANY VARIANCE TO ABOVE FOUNDING CRITERIA MAY RESULT IN THIS PLAN                             EXCAVATION.                                                                                                                                                                                                                CONTRACTOR AND AS2159 SECTION 7.2 FOR ADDITIONAL PILE
 REQUIRING AMENDING                                                                                                                                                                                                                                                                                                     TOLERANCE NOTES AND DETAILS.

C1      ##.##.####   REVISION NAME                                                                                                                                                        BRISBANE
                                                                               DESIGNED:          APPROVED:
                                                                                                                                                                                     T: 07 3852 4333    CONSULTANTS:                                                                       PROJECT: PROPOSED RESIDENTIAL DEVELOPMENT                                   PROJECT NUMBER
                                                                                                                                                                                                        CONSULTANTS NAME                                                                                                                                                  S24-###
                                                                                                                                            WE S TE R A
                                                                                                                                                                                       GOLD COAST
                                                                               DRAWN:
                                                                                                                                                                                     T: 07 5571 1599                                                                                       LOCATION: PROJECT LOCATION
                                                                                                                                                                                   SUNSHINE COAST
                                                                                                                                                                                                                                                                                                                                                                        SHEET NUMBER
                                                                               CHECKED:
                                                                                                                                            PART NE RS                               T: 07 5391 3777
                                                                                                                                                                                    NORTHERN NSW
                                                                                                                                                                                                       USE FIGURED DIMENSIONS ONLY. DO NOT SCALE, IF A DISCREPANCY ARISES CHECK WITH THE
                                                                                                                                                                                                       PROJECT ENGINEER AND/OR SUPERVISING AUTHORITY. DO NOT WORK FROM REDUCED SCALE
                                                                                                                                                                                                                                                                                           TITLE:    STRIP FOOTING DETAILS
                                                                                                                                                                                                                                                                                                                                                                            3.5
                                                                                                                                                                                                                                                                                                                                                                             .
                                                                               DATE:                                           STRUCTURAL+CIVIL+ENVIRONMENTAL ENGINEERS                                DRAWINGS (A1-A3 SIZE PAPER). COPYRIGHT OF ALL DRAWINGS & WORKS EXECUTED FROM
                                                                                                                                                                                     T: 02 6674 8047   THEM IS VESTED IN WESTERA PARTNERS AND USE OF THERE FORE WITHOUT PERMISSION IS
                                                                                                                                                                                  CENTRAL VICTORIA
                                                                                                                                                                                                                                                                                                     CLIENT NAME                                                                    ##
                                                                                                                                                                                                       STRICTLY PROHIBITED! IT IS THE BUILDERS RESPONSIBILITY TO ENSURE ALL WORKS ARE
                                                                               PAGE SIZE:   A3    For and on behalf of          www.westerapartners.com.au   ABN 52 097 417 975
                                                                                                                                                                                                       CARRIED OUT WITHCARE AND DUE DILIGENCE TO COMPLY WITH THE CONTRACT DOCUMENTS.       CLIENT:                                                                     REVISION
No.         DATE     REVISIONS                                     DRN   ENG                      WESTERA PARTNERS PTY. LTD.                                                         T: 03 5441 0922
Log in to download the original file

RFI - S25-054 Revised Concept Issue 18.06.2025 updated.pdf · 34.6 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.