POOL PILING
NP1 ALL WORKMANSHIP AND MATERIALS SHALL BE IN ACCORDANCE WITH AS2783 - USE OF P1 ALL PILES SHALL BE DESIGNED AND INSTALLED IN ACCORDANCE WITH AS2159 PILING CODE AND
REINFORCED CONCRETE FOR SWIMMING POOLS AND REFERENCED STANDARDS THERE IN. THE REFERENCED STANDARDS THEREIN.
NP2 ALL TOPSOIL AND ORGANIC MATTER UNDER POOL FLOOR IS TO BE REMOVED. THE DESIGN P2 REFER TO GEOTECHNICAL REPORT FOR SOIL PROFILE ACROSS SITE AND FOUNDING
REQUIRES THAT THE POOL BE CONSTRUCTED ON UNDISTURBED SOUND NATURAL GROUND RECOMMENDATIONS.
HAVING A SAFE ALLOWABLE BEARING PRESSURE OF NOT LESS THAN 75 KPa UNLESS
APPROVED BY THE ENGINEER. P3 REFER TO FOOTING PLAN FOR REQUIRED ALLOWABLE PILE LOADS.
NP3 WHERE THE POOL WALLS ARE NOT POURED AGAINST SOUND NATURAL GROUND TO LEVELS P4 THE PILE LOADS NOMINATED ON THE DRAWINGS DO NOT MAKE ALLOWANCE FOR NEGATIVE SKIN
SHOWN ON THE DRAWINGS, THE DESIGN OF THE WALLS MAY REQUIRE MODIFICATION. REFER FRICTION OR OTHER SOIL LOADS. THE PILING CONTRACTOR SHALL MAKE SUITABLE ALLOWANCE
TO ENGINEER. IN THE PILE DESIGN FOR SUCH SOIL LOADS WHERE SPECIFIED ON THE GEOTECHNICAL REPORT
OR DEEMED APPROPRIATE.
NP4 IF OVER EXCAVATION IS REQUIRED TO ACHIEVE UNDISTURBED SOUND NATURAL GROUND TO
THE UNDERSIDE OF THE POOL BASE, SEAT AND BENCH AREAS, THE OVER EXCAVATION SHALL P5 PILES SHALL ALSO BE DESIGNED FOR THE MINIMUM BENDING MOMENTS
BE BACKFILLED WITH 15MPa CONCRETE PRIOR TO FORMING AND CASTING THE POOL. INDUCED BY ANY LOAD ECCENTRICITY DUE TO PILE POSSITIONAL DEVIATION
IN ACCORDANCE WITH AS2159.
NP5 WHERE THERE ARE VARYING FOUNDATION CONDITIONS OVER THE POOL AREA OR WHERE
UNDISTURBED SOUND NATURAL GROUND IS NOT ENCOUNTERED REFER TO ENGINEER FOR P6 PILES SHALL BE DESIGNED FOR DURABILITY IN ACCORDANCE WITH AS2159, TAKING INTO
FOUNDATION DESIGN. ACCOUNT THE AGGRESSIVENESS OF THE GROUND AND THE ENVIRONMENTAL CONDITIONS.
NP6 A 100mm LAYER OF 20mm DIAMETER (MAXIMUM) GRAVEL IS TO BE SPREAD UNDER THE POOL
SLAB WHERE IT IS NOT FOUNDED ON FREE DRAINING MATERIAL. P7 A PILE SETOUT PLAN AND FULL DETAILS OF THE PROPOSED PILE TYPE, MATERIAL AND
INSTALLATION METHOD SHALL BE SUBMITTED TO THE ENGINEER FOR REVIEW PRIOR TO
NP7 THE DESIGN REQUIRES THAT GROUND WATER PRESSURE TO POOL WALLS AND FLOOR SLAB BE COMMENCING WORKS ON SITE.
RELIEVED BY INSTALLATION OF A HYDROSTATIC RELIEF VALVE WITH MAIN DRAIN DETAIL.
P8 WHERE PILE SPLICES ARE REQUIRED, FULL DETAILS SHALL BE SUBMITTED TO THE ENGINEER
NP8 THE VERTICAL WALL REINFORCEMENT SHOWN ON SECTIONS SHOULD BE NOMINALLY ON THE FOR REVIEW PRIOR TO INSTALLATION.
CENTRE LINE OF THE WALL UNLESS NOTED OTHERWISE, AND SHOULD BE ACCURATELY BENT
TO REMAIN CENTRAL AROUND THE CURVATURE AND INTO THE BASE. P9 THE PILING CONTRACTOR SHALL TRIM ALL PILES TO THE CUT OFF LEVELS INDICATED ON THE
FOOTING DETAILS.
NP9 THE MINIMUM CONCRETE COVER TO REINFORCEMENT SHALL COMPLY WITH THE FOLLOWING
UNLESS NOTED OTHERWISE: P10 ALL PILES SHALL BE ANCHORED INTO THE FOOTING SO THAT THE DESIGN LOADS
FORMED FACES - 40mm AND BENDING MOMENTS (AS PER NOTE 5) CAN BE SAFELY TRANSFERRED INTO
INTERNAL FACES - 50mm THE PILES. FULL DETAILS SHALL BE SUBMITTED TO THE ENGINEER FOR REVIEW
FACES CAST AGAINST GROUND - 60mm PRIOR TO INSTALLATION. DOWEL BARS FOR SCREW PILES SHALL BE DESIGNED
BAR CHAIRS SHALL BE USED TO ENSURE THE REQUIRED COVER IS MAINTAINED. AND PROVIDED BY THE PILING CONTRACTOR.
NP10 CONCRETING SHALL BE CARRIED OUT IN ONE CONTINUOUS OPERATION AND SHALL BE APPLIED P11 THE PILING CONTRACTOR SHALL BE RESPONSIBLE FOR THE REMOVAL OF ALL OBSTRUCTIONS
BY THE PNEUMATIC SPRAYED PROCESS BY EXPERIENCED OPERATORS. CONCRETE SHALL THAT IMPEDE THE INSTALLATION OF PILES.
HAVE A MINIMUM ULTIMATE COMPRESSIVE STRENGTH (f'c) OF 40MPa AT 28 DAYS MINIMUM
CEMENT CONTENT OF 280 kg/m3 AND MAXIMUM 10mm AGGREGATE. P12 THE PILING CONTRACTOR SHALL SUBMIT TO THE ENGINEER FOR REVIEW PRIOR TO COMMENCING
WORKS, EITHER GEOTECHNICAL CALCULATIONS BASED UPON THE SOIL PARAMETERS IN THE
NP11 IMMEDIATELY AFTER PNEUMATIC CONCRETE HAS BEEN PLACED, IT SHOULD BE PROTECTED SOIL REPORT, PILE LOAD TEST RESULTS OR TRIAL PILE DATA TO VERIFY THE PROPOSED
FROM PREMATURE DRYING BY SHADING FROM DIRECT SUNLIGHT AND SHIELDING FROM WIND. FOUNDING DEPTHS OF THE PILES, ALONG WITH FACTOR OF SAFETY ADOPTED IN THE DESIGN.
AS SOON AS CONCRETE HAS HARDENED SUFFICIENTLY IT SHOULD BE THOROUGHLY WETTED
AND THEREAFTER KEPT WET CONTINUOUSLY FOR AT LEAST 7 DAYS. P13 THE PILING CONTRACTOR SHALL SUBMIT TO THE ENGINEER FOR REVIEW PRIOR TO COMMENCING
WORKS, THE PROPOSED SCREW PILE TORQUE OR PILE DRIVING SET TO ACHIEVE THE REQUIRED
NP12 IF SALT CHLORINATOR IS USED, CONCENTRATION OF SODIUM CHLORIDE TO BE KEPT BELOW SAFE ALLOWABLE LOAD CAPACITIES FOR THE PILES, ALONG WITH EITHER GEOTECHNICAL
10000 P.P.M. CALCULATIONS BASED UPON THE SOIL PARAMETERS IN THE SOIL REPORT, PILE LOAD TESTS
RESULTS OR TRIAL PILE DATA TO VERIFY THE PILE TORQUE OR DRIVING SET ADOPTED.
NP13 SURFACE WATER FROM SURROUNDING AREAS SHOULD BE DIRECTED AWAY FROM THE POOL.
P14 THE PILING CONTRACTOR SHALL PROVIDE ALL DESIGN, CHECKING AND INSPECTION
NP14 POOL PLUMBING, ETC TO BE BY OTHERS. CERTIFICATION FOR THE PILING WORKS REQUIRED BY THE STATUTORY AUTHORITY, DULY
SIGNED BY AN APPROPRIATELY REGISTERED PROFESSIONAL ENGINEER FOR THE STATE IN
NP15 POOL FENCING BY OTHERS IN ACCORDANCE WITH AS1926 PART 1 & 2 AND LOCAL COUNCIL WHICH THE PROJECT IS LOCATED.
REQUIREMENTS.
P15 THE PILING CONTRACTOR SHALL ENGAGE A LICENSED SURVEYOR TO UNDERTAKE AN AS
CONSTRUCTED SURVEY OF THE PILE LOCATIONS AND PROVIDE THE RESULTS TO THE ENGINEER
PRIOR TO THE CONSTRUCTION OF FOOTINGS OVER THE PILES.
P16 THE PILING CONTRACTOR SHALL SUBMIT TO THE ENGINEER ALL PILING RECORDS REQUIRED BY
SECTION 7 OF AS2159 PILING CODE, INCLUDING PILE TORQUE OR DRIVING SET RESULTS FOR
EACH PILE.
P17 ALL EXISTING SERVICES ARE TO BE LOCATED BY THE PILING CONTRACTOR PRIOR TO
COMMENCING WORKS. MINIMUM CLEARANCES TO SERVICES ARE TO BE MET IN
ACCORDANCE WITH RELEVANT AUTHORITY REQUIREMENTS.
C1 ##.##.#### REVISION NAME BRISBANE
DESIGNED: APPROVED:
T: 07 3852 4333 CONSULTANTS: PROJECT: PROPOSED RESIDENTIAL DEVELOPMENT PROJECT NUMBER
CONSULTANTS NAME S24-###
WE S TE R A
GOLD COAST
DRAWN:
T: 07 5571 1599 LOCATION: PROJECT LOCATION
SUNSHINE COAST
SHEET NUMBER
CHECKED:
PART NE RS T: 07 5391 3777
NORTHERN NSW
USE FIGURED DIMENSIONS ONLY. DO NOT SCALE, IF A DISCREPANCY ARISES CHECK WITH THE
PROJECT ENGINEER AND/OR SUPERVISING AUTHORITY. DO NOT WORK FROM REDUCED SCALE
TITLE: CONSTRUCTION NOTES - SHEET 7
1.6
.
DATE: STRUCTURAL+CIVIL+ENVIRONMENTAL ENGINEERS DRAWINGS (A1-A3 SIZE PAPER). COPYRIGHT OF ALL DRAWINGS & WORKS EXECUTED FROM
T: 02 6674 8047 THEM IS VESTED IN WESTERA PARTNERS AND USE OF THERE FORE WITHOUT PERMISSION IS
CENTRAL VICTORIA
CLIENT NAME ##
STRICTLY PROHIBITED! IT IS THE BUILDERS RESPONSIBILITY TO ENSURE ALL WORKS ARE
PAGE SIZE: A3 For and on behalf of www.westerapartners.com.au ABN 52 097 417 975
CARRIED OUT WITHCARE AND DUE DILIGENCE TO COMPLY WITH THE CONTRACT DOCUMENTS. CLIENT: REVISION
No. DATE REVISIONS DRN ENG WESTERA PARTNERS PTY. LTD. T: 03 5441 0922
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.