Council archive · source document
App A - Existing Approvals · MCU17/0024.04
a. where the damage would cause a hazard to pedestrian or vehicle safety, immediately;
or
b. where otherwise, upon completion of the works associated with the development.
Any repair work which proposes to alter the alignment or level of existing services and assets
must first be referred to the relevant service authority for approval.
Landscaping Works
28 The development site must be landscaped. The works must be undertaken in accordance
with Planning Scheme Policy 3 – Landscaping Plants and Guidelines for that specific area
and must include in particular the works shown on the Approved Plans.
29 All landscape works must be established and maintained in accordance with the approved
design for the life of the development, and in a manner that ensures healthy, sustained and
vigorous plant growth. All plant material must be allowed to grow to full form and be
refurbished when its life expectancy is reached.
30 All landscape works must be maintained generally in accordance with the approved design
for the life of the development.
Retention of Existing Trees and Vegetation
31 All trees and vegetation identified for retention must be protected in accordance with AS
4970, Protection of trees on development sites.
32 A “no clearing zone” must be established and maintained over the existing vegetation on the
subject site. The following activities must not be carried out within the no clearing zone:
a. clearing, cutting down, poisoning, lopping or pruning of native vegetation which is
indigenous to, or planted within, the zone
b. soil/spoil dumping and/or compacting
c. soil excavation, other than for planting indigenous native plants.
The following exceptions apply:
i. declared plants under the Land Protection (Pest and Stock Route Management) Act
2002 and sub-ordinate Regulation 2003, and any Council Listed Environmental
Weeds, Exotic Grasses and other plants identified in writing by Council
ii. indigenous native trees which pose a well-founded threat to persons or property as
approved in writing by Council
5. REASONS FOR APPROVAL
The Assessment Manager considers the decision conflicts with the planning scheme and the
following are sufficient grounds to justify the decision despite the conflict:
1. The proposed Entertainment & Dining business Type 1 Food & Beverage use is associated
with the Surf Club use.
2. The proposed development seeks to redevelop the existing surf club, will maintain the same
footprint and will result in a significantly improved facility for residents and visitors to Sunshine
Beach.
3. The proposal will result in improvements to existing on street carparking and pedestrian
access pathways in the area, improving access to carparking and safety for pedestrians.
6. REFERRAL AGENCIES
Not Applicable
7. ADVISORY NOTES
The following notes are included for guidance and information purposes only and do not form part
of the assessment manager conditions:
Page 8 of 11
Document Set ID: 23410782
Version: 3, Version Date: 20/12/2024
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
App A - Existing Approvals.pdfRelated documentApplication case desk ↗
About this file
- File size
- 9.6 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.