Skip to the record
For the highest quality transcripts.

Original source · versioned page text

geotechnical report

of 11

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

 

 

 

 

 

 

 

 

 

amma
eas Ground/pad level
This footing is founded
wa above the critical depth
unstable line and is deemed to
ve be unstable. Any proposed or existing excavation. The
builder must ensure all excavations are
X..0,
to, discovered and the footing and slab is
tal “Lo Secured below the critical line accordingly,
stable “Sou i, This should include a search of all council
Bin, Pers must beiexcavated. & other records for as constructed plans to
™., line to provide stability to establish excavation depths & widths.
This footing is founded Ss these footings.
below critical line and
is stable
ZN.
™~,,
N.,
™.
=" Q
30 degrees .
aa TRS TS
Horizontal (46 for clay) 4 RS 2

 

 

 

 

 

“ In the case of a buried pipe the
invert level is usually above and
away from the nearest corner
of the excavation.

Critical Depth line measured from deepest
point of the excavation nearest the footing.

Critical Depth Line

 

 

Unearthed Geotechnical P/L. 6 Site Investigation Report 022-003
Log in to download the original file

geotechnical report.PDF · 4.2 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.