Original source · versioned page text
CIV3045 Opw Rev B (2022-08-24)
Attached to the e-mail Operational Works Application OPW22/0XXX - DA Form 1 - Cover Letter - Civil Plans - Hay Street and Ward Street Tewantin.
Original PDF page 4, section 1. The text section number identifies this passage in the reader.
T
W
T
S
///
D
T
W
T
///
S
///
HAY STREET
D
///
T
W
T
EXISTING EXISTING EDGE
S
OF BITUMEN
SEWER MAIN /// ///
D
///
T
REINFORCED CONCRETE
W
T
EXISTING
O.Nail in Kerb ACCESS DRIVEWAY
S
ELECTRICITY
RL 5.095
///
/ / / / / / / / / / / / / / / / / / / / PROPERTY BOUNDARY PILLAR BOX
E
/ / / / /
/
/ / / / / / /
/
/ / /
D / /
6 ///
W
T
T
E/O /
ACCESS DRIVEWAY
/
///
H
D
///
/
3.5m
S
PROPOSED
///
/
E/O ALLOTMENT
/
H
/
BOUNDARY ///
W
T
T
///
///
D
///
S
/
E/O
/
WARD STREET
H
/
/
W
T
/
PROPOSED 4.5m
D
PASSING BAY PRELIMINARY
S
/
S
WIDE EASEMENT BUILDING
FOR ACCESS AND
/
FOOTPRINT
/
SERVICES
T
W
D
S
S
/
/
PROPERTY BOUNDARY
/
T
/
S
W
D
/
S
/
/
/
T
/ / / /
S
/ /
W
/ /
D
/ / / / / / / / / /
S
/
PROPERTY BOUNDARY
T
S
W
D
/
> > >
S
T
S
W
D
/
PROPOSED INTER-ALLOTMENT
PROPOSED DRAINAGE WITHIN 1.5m WIDE EASEMENT
S
ALLOTMENT
S
T
LEGEND LEGEND BOUNDARY
W
D
UP
EXISTING FEATURES EXISTING PRELIMINARY
PROPOSED FEATURES
BUILDING
S
OVERALL RP BOUNDARY RP BOUNDARY SEWER MAIN FOOTPRINT
S
T
W
D
CADASTRAL EASEMENT RP EASEMENT FUTURE EXTENSION OF
ACCESS DRIVEWAY WITH
SURVEYED RP BOUNDARY ROAD CENTRELINE BUILDING WORKS
S
S
CADASTRAL RP BOUNDARY CONCRETE DRIVEWAY
W
D
ROAD CENTRELINE RETAINING WALL (MAX 1000mm HIGH)
T
ROAD KERB & CHANNEL > > > DRAINAGE SWALE
S
S
/// /// /// ///
EDGE OF BITUMEN EARTHWORKS BATTERS
W
D
T
D D STORMWATER STORMWATER DRAINAGE
S
W W WATER RETICULATION DESIGN CONTOUR
S S SEWER RETICULATION
D
/
T
> > >
S
E/OH OVERHEAD ELECTRICAL
/ / / / / / / / / / / / / / / / / / /
S
E E UNDERGROUND ELECTRICAL PROPERTY BOUNDARY
T T TELSTRA PROPOSED PVC-U TRUNK
D
T
S
CHANGE IN GRADE STORMWATER SEWER MAIN
DRAINAGE
S
BUILDING
/ / / FENCE
S
T
RETAINING WALL
12 NATURAL CONTOUR 0 2.5 5 7.5 10 12.5m
SCALE 1:250 A3
PLAN DETAILS: PLAN AMENDMENTS: PLAN TITLE:
Rev Date Comment Altered Checked
Designed: AJD
Drawn: AJD A 14-04-22 ORIGINAL ISSUE AJD JP
SUNSHINE COAST OFFICE NORTH LAKES OFFICE Checked: JP B 24-08-22 ISSUE FOR APPROVAL AJD SC
Building A, Level 1, Corporate Suite A, Bld 2 Datum: AHD
6 Innovation Parkway, 2 - 4 Flinders Parade, Date: MARCH 2022
Birtinya 4575, Qld North Lakes 4509, Qld ISO 9001
MANAGEMENT This plan is Copyright. Other than for the purposes of and subject to the conditions prescribed under the Copyright Act, no part of it may in any form or by
www.ContourCE.com.au SYSTEMS
any means be reproduced, stored in a retrieval system or transmitted without the prior written permission of Contour Consulting Engineers. The plan shall not
Ph. (07) 5493 9777 Trading name of SN Registrars (Holdings) Ltd
8327 Director: BRETT THOMSON (RPEQ 6068) PLAN No: REVISION: SHEET: 04 OF 14
[email protected] Quality Assured International 3rd Party Accredited (FOR & ON BEHALF OF CONTOUR C/E PTY LTD) be used for construction without prior written approval. FILE LOCATION: C:\_PROJECTS\DD262 HAY ST, TEWANTIN\DRAWINGS\3045-004.DWG
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.