Council archive · source document
06/2689 - Resubmission of Application Material [As Published] · 132006.2689
Very large file (11.0 MB): the original may take a few minutes to open or download. The page text below is quick to read.
. INTEGRATED PLANNING ACT 1997 Operational work that is tidal work or work in coastal management district Fos more information refer to Guide 18. For More information about prescribed tidal work in local government tidal areas refer to Guide 24. Unless you answered "none of the above” to Q9, the application requires assessment by the Environmental Protection Agency (EPA). If an agency other than EPA is the assessment manager for the application, EPA is a concurrence agency for the application in felation to this matter. Local goverment is the assessment manager for all prescribed tidal work. 9. IDAS Assessment Checklist, Version 20, 2 April 2007 The application involves operational work that is: ( tick the applicable boxes) L1(i) _ tidal work'® as defined under the Coastal Protection and Management Act 1995 (the Coastal Act) that is not prescribed tidal work — complete Part M of Form 7; or C1 (ii) tidal work that is prescribed tidal work" other than in a canal‘? -complete Part P of Form 1; or LD (ii) carried out within a coastal management district under the Coastal Act and for - complete 4 Part M of Form 1 if any box/es (a) fo (i) below are ticked. ; (a) constructing or installing works in a watercourse between MHWS and HAT (ie. other than those works in tidal water) where the development has been determined not to be assessable against the Water Act 2000 ; constructing a canal’? intended to be connected to tidal waters; constructing an artificial waterway; reclaiming land under tidal water, disposing of dredge spoil or other solid waste material in tidal water; interfering with quarry material on State coastal land above high-water mark; draining or allowing drainage or flow of water or other matter across State coastal land above high-water mark; removing or interfering with coastal dunes on land, other than State coastal land, that is in an erosion prone area and above high-water mark; Oh) (i) constructing a bank or bund wail to establish a ponded pasture on land, other than State coastal land, above high-water mark; or &] (iv) none of the above. Oo) De OW Oe Of O@ Operational work befow high water mark For more information refer to Guide 18. For More information about prescribed tidal work in local goverment tidal areas refer to Guide 24. Unless you answered “none of the above’ to Q10, the application triggers referral to Queenstand Transport (QT) (Maritime Safety Qld) as a concurrence agency. Local government is the assessment manager for all prescribed tidal work. 10. The application involves operational work that is: ( tick the applicable box/es) CD (i) tidal work" as defined under the Coastal Protection and Management Act 1995 (the Coastal Act) that is not prescribed tidal work - complete Part M of Form 1; oF [-[(ii)_tidal work that is. prescribed. tidal-work'4.—complete Part P of Form; or — U (iii) carried out within a coastal management district'S under the Coastal Act and for - [1 (a) disposing of dredge spoil or other solid waste material in tidal water ~ complete Part M of Form 1; reclaiming land under tidal water - complete Part M of Form 1; or constructing a canal’, if the canal is associated with reconfiguring a lot - complete Part M of Form 7; KX) (iv) none of the above. Coastal management For more information refer to Guide 18. Unless you answered “none of the above” to Q11, the application requires assessment by the Environmental Protection Agency (EPA). if an agency other than EPA is the assessment manager for the application, EPA is a concurrence agency for the application in relation to this matter. 11. The application involves: (tick the applicable box/es) ((i) a material change of use assessable under a planning scheme involving operational work carried out completely or partly in a coastal management district" iti) a material change of use assessable under a planning scheme involving building work, carried out completely or partly in a coastal management district that is - the construction of a new premises with a GFA" of at least 1000m? the enlargement of the GFA of existing premises by more than 1000m? reconfiguring a lot assessable under schedule 8 of the IPA where the land is situated completely or partly in a coastal management district reconfiguring.a-lot'? assessable-under-schedule-8-of-theIPA-and-in connection-with——- the construction of a canal’? - complete Part M of Form 1 none of the above Di iii) Ei) XI) 10 Tidal work is defined in sch 10 of the IPA. 11 Prescribed tidal work is defined in the Coastat Protection and Management Regulation 2003 and includes certain tidal works completely or partly within a tocal government tidal area. 142 Canal means canal as defined under the Coastal Protection and Management Act 1995 13 Tidal work is defined in sch 10 of the IPA. 14 Prescribed tidal work is defined in the Coastal Protection and Management Regulation 2003 and includes certain tidal works completely or partly within a local government tidal area. 15 Coastal management district is defined in sch 10 of the IPA and means a coastal management district under the Coastal Protection and Management Aci 1995, other than an area declared as a coastal management district under section 47(2} of that Act. 16 GFA is defined in sch 14 of the IPA to mean the gross ftcor area. For a definition of how to calculated GFA, go to the planning scheme against which the application is being assessed. 17 Under $117 of the Coastal Protection and Management Act 1995, an application for reconfiguration, where the reconfiguration is associated with the construction of an artificial waterway, must be accompanied by the application for the operational works to construct the artificial waterway. Page 4
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
06/2689 - Resubmission of Application Material [As Published]Related documentApplication case desk ↗
About this file
- File size
- 11.0 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.