INTEGRATED PLANNING ACT 1997
SEQ Regional Pian
For more infarmation refer to schedule 2 of the
IP Regulation.
Refer to Chapter 2, part 5A and schedule 10 of
the Integrated Planning Act 1997, and schedule
2 of the Regulatory Provisions for retevant
definitions.
Unless you answered “none of the above" to
Q20, the application requires assessment by the
Office of Urban Management (OUM).
Fisheries matters
For more information refer to schedule 2of the !P
Regulation.
Unless you answered ‘none of the above” to
Q21, the application requires assessment by the
Department of Primary Industries and Fisheries
(OPI8F),
\f an agency other than DPI&F is the assessment}
manager for the application, DPI&F is a
concurrence agency for the application in
telation to items {i} - (iv) and an advice agency
in relation to item (v).
IDAS Assessment Checklist, Version 20, 2 April 2007
20. The application involves {tick applicable box/es) -
C1 (i) a material change of use of premises —
(a) ina Major Development Area in the Urban Footprint for -
OO @ anurban activity - |
{J _ in an area included in a structure plan where the IPA, section 3.1.6
applies;
(11s inan area not included in a structure plan where -
« the IPA, section 3.1.6 applies to the application for the material change
of use; or
« the premises exceeds 10,000m2; or
« the gross floor area (GFA) on the premises will exceed 10,000m2; or
impact assessment is required under the relevant planning scheme
C (i) intensive animal husbandry, or
C (ii) residential development involving a rural residential purpose
{b) in the Regional Landscape and Rural Production Area for -
0 (i) anurban activity and not specified in section 2.4(2); or
2 (ii) residential development involving a rural residential purpose and not
specified in section 2.6(2)
(c) in the Rural Living Area for an urban activity and not specified in section 2.8(2);
(d) in the Investigation Area for -—
0 (i) anurban activity and not specified in section 2.10(2);
C2 (i) residential development involving a rural residential purpose and not
specified in section 2.12(2); or
OO (ii) intensive animal husbandry
—-—[]—(ii)-reconfiguring-a'lot=
On land in a Major Development Area in the Urban Footprint that is:
(a) not included in a structure plan; and
(b) not specified in section 3.1(2).
XI
21. The application involves: (tick the applicable box/es)
C(i)_ an assessable material change of use for aquaculture - complete Part 0; of Form 1;
L(ii) assessable operational work that is the construction or raising of a waterway barrier -
complete Part Os of Form 1;
Di (iii) assessable operational work completely or partly within a declared fish habitat area-
complete Part O2 of Form 7;
Div)
Ow
(iii) none of the above
plant - complete Part O2 of Form 1;
development assessable under the IPA, schedule 8, part 1, on land that adjoins a
declared fish habitat area;
assessable operational work that is the removal, destruction or damage of a marine
wi)
none of the above,
Page 7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
06/2689 - Resubmission of Application Material [As Published]Related documentApplication case desk ↗
About this file
- File size
- 11.0 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.