Council archive · source document
06/2689 - Resubmission of Application Material [As Published] · 132006.2689
Very large file (11.0 MB): the original may take a few minutes to open or download. The page text below is quick to read.
060642__ Ken Hicks & Associates 3.0 DESCRIPTION OF PROPOSED DEVELOPMENT The following section of this town planning report describes the proposed development and provides an architectural statement with regards to the design of the proposal. 3.1 DESCRIPTION OF PROPOSAL . It is the intention of the applicant to remove the existing residential land uses on the subject site and develop the property for the purposes of small-scaled professional offices in accordance with the proposal plans prepared by Ken Down Architects which are included as Attachment A. The proposed use of the site will operate under the defined use of Commercial Business: Type 1 Office contained within the Noosa Plan document. The proposal includes 1,180sqm of gross floor area (GFA) divided between 3. separate buildings. Each individual building is broken into 3 tenancies. The buildings have been designed to a height of 2 storeys (8m):in height and will present to the David Low Way as individual entities creating a domestic scale. The buildings are orientated on differing aspects or planes which will ultimately contribute to enhancement of the David Low Way streetscape. Adopting this design approach, the project architect has produced a built form outcome which minimises bulk and scale whilst promoting Council's intention for this precinct. The design of the buildings includes decks protruding from the upper levels which will break up the building fort and contribute to adding visual interest to the buildirig facade. This will also give the development more of a residential type presence. The roof form has been designed in order for the buildings to present as separate entities. The proposed materials and finishes have been selected to reflect the beachside character associated with Peregian Beach whilst contributing to the setting of the building form for this section of the David Low Way identified for commercial type uses. An architectural statement has been prepared by Ken Down Architects which is included in Section 3.2 of this town planning report below. The applicant proposes a single driveway on the southern boundary of the site which accesses 10 car parking spaces (including 1 disabled bay) on the ground level. These spaces will be screened from the street by the physical siting and presence of the buildings in combination with the landscaping treatments proposed between the buildings. A basement accessed from a graded ramp is proposed which contains 49 car parking spaces. The extent of the basement is such that various deep planting opportunities exist through the basement not- being-designed-to-the-boundaries-of the-site- An area as depicted on the proposal plans has been: dedicated for the storage of waste bins. This area has been suitably screened utilising various design treatments. Extensive landscaping is proposed within the development layout to define and provide buffering to adjoining property boundaries and to visually enhance the streetscape. Plantings along the street frontage will complement the existing streetscape theme of Peregian Beach. The development parameters are outlined in the table below. Development Parameter Proposal Site Area 2,022sqm Vehicular Access David Low Way Development Application for Material Change of Use Morgan & Beiers Pty Ltd Commercial Business: Type 1 Office (Impact Assessable) 247 & 253 David Low Wav. Pereaian Beach Paae 5 of 33
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
06/2689 - Resubmission of Application Material [As Published]Related documentApplication case desk ↗
About this file
- File size
- 11.0 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.