Council archive · source document
06/2689 - Resubmission of Application Material [As Published] · 132006.2689
Very large file (11.0 MB): the original may take a few minutes to open or download. The page text below is quick to read.
060642 Ken Hicks & Associates }In this regard it is noted that the present proposal contains, ‘blind aisles, has no provision for vehicles to. turn around in. blind, aisles, contains blind ‘corners, has steep grades for the ramps, has ; }.no clear access to the lift or stairs on the ground level, has.a disabled space positioned far away | from the lift area, insufficiently sized car park spaces, etc.” . cow | Response Please refer to the Proposal Plans prepared by Ken Down Architects. -7. It is. noted: that one: disabled car park space-is proposed on site, but a development of this < size | should’ aim to achievé at ‘least two.disabled spaces, one for customers and one for staff. a Response Please refer to the Proposal Plans prepared by Ken Down Architects. 87 Demonstrate that vehicles can enter, manoeuvre throughout the site, park on sité, and leave the: ¥ site without scraping and/or. bottoming. This shall be undertaken for, all types of vehicles expected j .to enter: the site, such as standard cars, maintenance vans, and emergency vehicles (ambulance) § } ‘with consideration given to the height of such vehicles and: the headroom required under the 4 building. Plans of the driveway and driveway profiles heed. to extend from. the. , actual David Low | Way road into the site, and not just within the bounds of the’site. . Response Please refer to the Proposal Plans prepared by Ken Down Architects. 9. Illustrate on the proposal plans that suitablé sight distances cari be achieved fron the proposed + ‘access driveway to pedestrians on the pathway.network and to vehicles on the David Low Way 1 | based on the 85-percentile design speed of the David Low Way, not the sign posted speed limit. In this regard a design speed of 70km/h would be more realistic and consideration. should also be given to existing vegetation and/or proposed vegetation that may restrict these sight lines... _} Response Please refer to the Proposal Plans prepared by Ken Down Architects. :10. Illustrate on the proposal plans all "end of trip facilities", such as bicycle storage lockers for : staff, bicycle storage areas for customers, showers, change rooms, seating areas, drinking | -fountains, etc. i Response Please refer to the Proposal Plans prepared by Ken Down Architects. ‘11. Demonstrate that the site can be drained, without the use of pumps in accordance with: Specific C, (Outcome 017 of Table 14-46 of the je Driveways & Car ar parkiha Code... . . _. om Response Please refer to the Proposal Plans prepared by Ken Down Architects. 12. Demonstrate that the site can be developed witti no net increase in runoff from the site’for ‘storm events up to a 1 in 100 year Average Recurrence Interval. In this regard the stormwater drainage ,system designed: for the site will need to incorporate an adequate detention system (holding tanks) to retain these flows which can: bé utilised for irrigation, toilet flushing, hose. down ‘of paved surfaces, and ground water recharging. ~ ' . The present proposal to add these flows into the existing drainage “sem in the. David Low Way i is ‘not supported. - = yo, oe . . ee Development Application for Material Change of Use Morgan & Beiers Pty Ltd Commercial Business: Type 1 Office (Impact Assessable) 247 & 253 David Low Wav. Pereaian Beach Paae 10 of 33
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
06/2689 - Resubmission of Application Material [As Published]Related documentApplication case desk ↗
About this file
- File size
- 11.0 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.