Council archive · source document
06/2689 - Resubmission of Application Material [As Published] · 132006.2689
Very large file (11.0 MB): the original may take a few minutes to open or download. The page text below is quick to read.
060642 _.__Ken Hicks & Associates
Response /
The will be addressed with a subsequent development application for operational works and
building works.
19. Please indicate how.the basement will comply with part D1.4 (Exit travel distances) of. the BCA. |
(Building Code Of Australia); os ek ce! :
Response
The will be addressed with a subsequent development application for operational works and
building works.
20. It appears that the: building: does not comply with the disable access or disable toilet facilities.
j - The building and environs should be designed-to meet the requirements of the Human Rights and 9: ~~~
| Equal Opportunity” Commission “Advisory Notes on Access to premises” and, AS 1428.1. Any.
Tservices and facilities in the building: complex must allow: independent, dignifi ied; and’ equitable use’
| of the facilities for all.people. Show fiaw the building will comply...” ae
wre
Response -
The will be addressed with a subsequent development application for building works.
"21. "Waste management is not suitably planned and point 4.4 of the Report contradicts the ground |
floor plan. Therefore please submit a Waste Management Pian (Operational) in accordance with
Planning Scheme Policy No. 9 "Waste Management. Multi-Dwellings and Commercial and Industrial: 4
| Premises";- for the day-to-day operation of the development. It is critical that waste areas are
{ | properly. planned... A.copy.of_Planning_Scheme- Policy_No.-9. explaining-exactly-how-to-predict-waste-4
| quantities and design waste areas is available from Council and the- web. The. Plan shalt include the
following information: - .
‘The types of. waste that ‘will be generated from the activities approved within the development.
~ +
Estimated volumes or tonnage of both ‘recyclables and waste generated.
Methods to be used for dealing with garden waste. Sg
Initiatives to minimize waste either by waste prevention, reduction, re-use or recycling.
-Description. of procedures for getting all waste to the bins; the storage of bins and the collection
of bins by the contractor. .
mA description of the design details of waste. storage and 4 recycling. areas including size, location,
"elevation anid floor. plan, methods of bin Washing and system. to. >-prevent storm water getting into |
sewer via the bin wash. . oe ge a
4 th description of types and volume of waste storage containers to be used. vo tos, eee
The waste and recycling storage area shall include. the. provision of containers ‘for all waste and.
' recycling. materials inéluding putresable matter; non-recycling waste, paper/ Cardboard, glass,
aluminium/steel: cans, waste oil, styrofoam boxes, etc, and bin washing facilities connected to
sewer. — 1
{ + # " Se of we * : . ve «
cA detailed description of vehicular access to ‘collect waste outside the front of the property, for |
‘either wheelie bins or bulk bins and without causing any traffic hazards. _ eet
Response
The will be addressed with a subsequent development application for operational works.
Development Application for Material Change of Use : Morgan & Beiers Pty Ltd
Commercial Business: Type 1 Office (Impact Assessable)
247 & 253 David Low Wav, Pereaian Beach . Paae 12 of 33
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
06/2689 - Resubmission of Application Material [As Published]Related documentApplication case desk ↗
About this file
- File size
- 11.0 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.