06/2689 - Resubmission of Application Material [As Published] · 132006.2689
Very large file (11.0 MB): the original may take a few minutes to open or download. The page text below is quick to read.
2.5 2.6 Flood Protection The proposed access driveway to the basement will meet QUDM flood protection requirements by rising to 100mm above the top of kerb, before ramping down into the basement. Construction Phase A Sediment and Erosion Management Plan (SEMP) will be included as part of a ’ future Operational Works Development Application. The SEMP would implement measures in accordance with the Engineering Guidelines for Queensland Construction Sites and Council’s guidelines to ensure that sediment would not enter the waterways or cause nuisance to adjoining properties or the public. 3.0 MAINTENANCE 3.1 Construction Phase The SEMP will be implemented by the Project Managers and maintained until completion of building works and the establishment of landscaping. 3.2 Operational Stage The permanent stormwater treatment devices will be inspected and maintained on a regular basis by the manager of the development on behalf of the Body Corporate in accordance with the manufacturer's recommendations. 4.0 SUMMARY The implementation of this Stormwater Management Plan will ensure that the proposed development would not create a nuisance to other landowners, or degradation of the environment due to its effects on the hydraulics and hydrology of the site.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
06/2689 - Resubmission of Application Material [As Published]Related documentApplication case desk ↗
About this file
- File size
- 11.0 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.