STORMWATER DRAINAGE NOTES
1.ANY CHANGES SHALL BE APPROVED BY THE ENGINEER IN WRITING PRIOR TO CARRYING OUT
OF THE WORKS
2.ALL LEVELS TO AHD.
3.ALL DIMENSIONS ARE IN MILLIMETRES UNLESS NOTED OTHERWISE.
4.ALL DIMENSIONS AND LEVELS ARE TO BE CHECKED ON-SITE BEFORE WORK COMMENCES.                                                         Delivery pipe from roof downpipes                                                                                                                                                                                                                                                      LINDSAY CONSULTING PTY LTD




5. DIMENSIONS SHALL NOT BE OBTAINED BY SCALING THE DRAWING.                                                                                                                                     100x100 Concrete surround
                                                                                                                                                                                                                                                                                                                                                                                                                           LINDSAY CONSULTING PTY
                                                                                                                                                                                                                                                                                                                                                                                                                                              LTD
                                                                                                                      Class 'B' secured heelguard
6. FOR BUILDING SET-OUT REFER ARCHITECTURAL DRAWINGS                                                                             grate to AS 3996                                                       Topsoil
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                     RPEQ 4928
7. THE LOCATION AND DEPTH OF ALL SERVICES SHALL BE VERIFIED ON SITE WITH THE                                                                                                                             Geotextile                                                                                                                                                                                                        OFF. 2C/82 PARKER STREET, MAROOCHYDORE                  PH 54 792 118
REVLEVANT AUTHORITY PRIOR TO THE COMMENCEMENT OF WORKS                                                            DRIVEWAY
                                                                                                                  PAVEMENT                                                                                                                                                     150 Inlet pipe
                                                                                                                                                                                                                                                                                                                                                                                                                        THIS DRAWING REMAINS THE PROPERTY OF
8. DURING CONSTRUCTION BARRIERS, LIGHTS & SIGNS SHALL BE MAINTAINED TO ENSURE SAFE                                                                                                                                                                                                                                                                                                                                      LINDSAY CONSULTING PTY LTD AND IS FOR
PASSAGE OF TRAFFIC AND PEDESTRIANS IN ACCORDANCE WITH THE REQUIREMENTS OF THE                                                                                                                                                                                                                                                                                                                                             THE SOLE USE OF THE CLIENT. NO PART
                                                                                                                                                                                                                                                                                                                                                                                                                        MAY BE USED IN PART OR WHOLE WITHOUT
LOCAL AUTHORITY.
                                                                                                                                                                                                                                                                                                                                                                                                                           PRIOR EXPRESS WRITTEN CONSENT OF
9.ALL WORK AND MATERIALS SHALL BE IN ACCORDANCE WITH CURRENT LOCAL AUTHORITIES                                                                                                                                                                                                 Small infiltration Unit
                                                                                                                                                                                                                                                                               Atlantis brand
                                                                                                                                                                                                                                                                                                                                                                                                                              LINDSAY CONSULTING PTY LTD
SPECIFICATIONS AND STANDARDS.
                                                                                                                                                                                                                                                                                                                                                                                                                       CLIENT AND PROJECT DESCRIPTION
10.THE CONTRACTOR SHALL BE RESPONSIBLE FOR NOTIFYING ALL RELEVANT AUTHORITIES
AND PAYING ALL FEES NECESSARY BEFORE COMMENCING WORK, FOR LOCATING ALL EXISTING
                                                                                600X600 PIT AT SHOWN
                                                                             in accordance with AS3500
                                                                                                                                                                                                                                                                                                                                                                                                                           CLOUT DESIGN
                                                                                                                                                                                                                                                                                                                                                                                                                           OPERATIONAL WORKS




                                                                                                                                                                                                                                                                                                                                                                                  9
                                                                                                                                                                                                                                                                                                                                                                             .31
SERVICES AND FOR REPAIR OF ANY SERVICES DAMAGED AS A RESULT OF THE FOOTPATHS




                                                                                                                                                                                                                                                                                                                                                                            1
                                                                                                                                                                                                                                                                                                                                                                         PL
                                                                                                                                                                                                                                                                                                                                                                                                                           NO. 7 WILLIAM ST
                                                                                                                                                                                                                                   150MM UPVC pipe
AND PRIVATE PROPERTY SHALL BE REINSTATED TO THEIR ORIGINAL CONDITION.
11.ANY OBSOLETE/REDUNANT DRIVEWAY CROSSINGS AND DRAINAGE OUTLETS FROM THE
                                                                                                                                                                                                                                                                                                                                                                                                                           NOOSAVILLE




                                                                                                                                                                                                                                                                                                                                                                                                 m.
                                                                                                                                                                                                                                                                                                                                                                                               No
KERB AND CHANNEL INCLUDING ASSOCIATED PIPES ACROSS THE FOOTPATH SHALL BE




                                                                                                                                                                                                                                                                                                                                                                                          90
                                                                                                                                                                                                                                                                                                                                                                                         1.2
REMOVED AND THE KERB AND CHANNEL AND FOOTPATH REINSTATED TO THE LOCAL
                                                                                                                                                                                                                                                                                                                                                                                  TER




                                                                                                                                                                                                                                                                                                                                                                                         IL
                                                                                                                                                                                                                                                                                                                                                          TO          RMWA                    APPROVED KERB ADAPTER
AUTHORITIES CURRENT SPECIFICATIONS AND OR STANDARDS                                                                                                                                                                                              200MM OF WASHED RIVER SAND                                                                        PVC S                                      SEE DETAIL
                                                                                                                                                                                                                                                                                                                                              MM U
                                                                                                                    Atlantis Flo Cell Matrix                                                                                                     AROUND CELLS                                                                           2X100         WN)
12.THE CONTRACTOR'S ATTENTION IS DRAWN TO THE REQUIREMENTS OF THE WORKPLACE                                                                                                                                                                                                                                                                     S H O
                                                                                                                    685 x 408 x 450                                                                                                                                                                                                          DE
                                                                                                                                                                                                    90 MM SLOTTED PIPE TO BE DIRECTED                                                                                                   (GRA                                                                           DRAWING TITLE
HEALTH AND SAFETY ACT 1995. ALL WORK IS TO BE CARRIED OUT IN ACCORDANCE WITH THIS                                                                                                                   TO LPOD.
                                                                                                                                                                                                                                                                                                                                600X600 STORMWATER
ACT AND IN PARTICULAR THE CONTRACTOR TO ENSURE THE REQUIREMENTS OF THIS                                                                                                                                                                                                                                                                                                                                                    OPERATIONAL WORKS




                                                                                                                                                                                                                                                                                                                                                                           14.0
                                                                                                                                                                                                                                                                                                                                PIT WITH M/DUTY GRATE




                                                                                                                                                                                                                                                                                                                                                                             70
SPECIFICATION WITH REGARD TO 'NOTIFICATION IN RELATION TO A NOTIFIABLE PROJECT ARE                                                                                                                                                                                                                                              T.O.G - 2.000
                                                                                                                           DETENTION PIT TO CONSIST OF ATLANTIS FLO CELL MATRIX -
FULFILLED.                                                                                                                 4795 LONG X 816 WIDE X 900 HIGH AS REQUIRED FOR 6000L                                                                                                                                                U.S.I.L-1.620

13.BENCHING OF PIT STRUCTURES SHALL HAVE A SMOOTH FINISHED SURFACE, AND PIPES                                                                                                                                                                                                                                                   D.S.I.L-1.590




                                                                                                                                                                                                                                                                           30
                                                                                                                              DETENTION PIT DETAIL




                                                                                                                                                                                                                                                                          2.4
SHALL NOT PROJECT INSIDE THE SHAFT OF THE PIT.
                                                                                                                                                                                                                                                                                                                                                                                                                       SCALES




                                                                                                                                                                                                                                                                      PL
14.STORMWATER DRAINAGE PIPES SHALL BE UPVC PIPE (MINIMUM SEWER CLASS SN8) TO AS                                                                                                                                                                                                   NK




                                                                                                                                                                                                                                                                                    30
                                                                                                                                                                                                                                                N)                             TA




                                                                                                                                                                                                                                                                                2.4
14. 1260 OR APPROVED EQUIVALENT. MINIMUM COVER TO ROOFWATER PIPES SHALL BE 50mm                                                                                                                                                            OW                             ON
                                                                                                                                                                                                                                                                      TI
                                                                                                                                                                                                                                        SH




                                                                                                                                                                                                                                                                           PL
                                                                                                                                                                                                                                                              EN
                                                                                                                                                                                                                                                                                                                                                                                                                                                                               5
                                                                                                                                                                                                                                    E
                                                                                                                                                                                                                                                                                                                                                                                                                                                           0
EXCEPT WHERE REDUCED COVER IS REQUIRED TO DISCHARGE TO THE KERB AND CHANNEL.                                                                                                                                                                                 T
                                                                                                                                                                                                                                 AD
                                                                                                                                                                                           6
                                                                                                                                                                                     42.2
                                                                                                                                                                                          8                                                               DE
                                                                                                                                                                                                                                                                                    00




                                                                                                                                                                                                                                                                                            30
                                                                                                                                                                                                                            R
                                                                                                                                                                                                                                                                                                                            F.S.L - 2.300
                                                                                                                                                                                                                          (G
                                                                                                                                                                                                                                                                               47




                                                                                                                                                                                                                                                                                         2.4
15.MINIMUM PIPE GRADES FOR STORMWATER AS 3500 PART 3: PIPES SHALL COMPLY WITH                                                                                                                                      R




                                                                                                                                                                                                                                        20
                                                                                                                                                                                                                TE




                                                                                                                                                                                                                 30




                                                                                                                                                                                                                                                                                    PL
                                                                                                                                                                                                             A
              - 1.0% (MIN) GRADE FOR PIPES < 150 DIA.




                                                                                                                                                                                                                                           00
                                                                                                                                                                                                             2.4
                                                                                                                                                                                                     MW
                                                                                                                                                                                                 OR




                                                                                                                                                                                                       PL
                                                                                                                                                                                               ST
                                                                                                                                                                                                                                                                                                                                                                                                                                                          Orig. 1:200
              - 0.5% (MIN) GRADE FOR PIPES > 150 BUT < 375 DIA.
                                                                                                                                                                                      VC
16.CONCRETE DRIVEWAY AND PARKING AREAS SHALL BE CONSTRUCTED WITH 32 MPa                                                                                                          UP
                                                                                                                                                                             M
                                                                                                                                                                          0M
17.REFER HYDRAULIC DRAWINGS FOR SANITARY DRAINAGE LAYOUTS.                                                                    600X600 STORMWATER                      15                                                                                                                   F.F.L - 2.450
                                                                                                                                                                                                                                                                                                                                                            )
18.COMPACTION OF MATERIAL UNDER CONCRETE DRIVEWWAYS AND PARKING AREAS SHALL BE                                               PIT WITH M/DUTY GRATE                                                                                                                                                                                                     DE
                                                                                                                                                                                                                                                                                                                                                     RA
                                                                                                                             T.O.G - 2.200                                                                                                                                                                                                        .G
                                                                                                                                                                                                                                                                                                                                                                                                                       SURVEY DATUM




                                                                                                                                                            00
              (i) 75% MINIMUM DENSITY FOR COHESIONLESS MATERIAL (AS 1289 E5.1) AND                                                                                                                                                                                                                                                               N
                                                                                                                                                                                                                                                                                                                                              MI




                                                                                                                                                           2.2
                                                                                                                             D.S.I.L-1.850                                                                                                                                                                                              (1%




                                                                                                                                                                                                                                                SD
              (ii) 90% RELATIVE DRY DENSITY (STD COMP.) FOR MATERIAL OTHER THAN (i)




                                                                                                                                                           PL
                                                                                                                                                                                                                                                                                                                                    R

GENERAL NOTES (SOME MAY NOT APPLY)                                                                                                                                                                                                                                                                                     O   RM
                                                                                                                                                                                                                                                                                                                             W
                                                                                                                                                                                                                                                                                                                                ATE
                                                                                                                                                                                                                                                                                                                                                                                                                           .
                                                                                                                                                                                                                                                                                                                    ST
1. THESE DRAWINGS SHALL BE READ IN CONJUNCTION WITH ALL OTHER CONSULTANTS                                                                                                                                                                                                                                      VC




                                                                                                                                                                                                                     SD
                                                                                                                                                                       50
                                                                                                                                                                                                                                                                                                             UP                                                                                                        ASSOCIATED CONSULTANTS




                                                                                                                                                                     2.4
DRAWINGS AND SPECIFICATIONS. 2. BEFORE PROCEEDING WITH THE WORK ANY DISCREPANCIES                                                                                                                                                                                                                        M                                                Location of stormwater lines to
                                                                                                                           50




                                                                                                                                                                                                                                                                                                       M
                                                                                                                                                                                                                                                                                                    00
                                                                                                                      2.2




                                                                                                                                                                                                                                                                                                                                                          detention tank to be detrmined




                                                                                                                                                                     PL
                                                                                                                                                                                                                                                                                                   1
IN THE CONTRACT DOCUMENTS SHALL BE REFERRED FOR DECISION TO THE ENGINEER.                                                                                                                                                                                                                                                                                 on-site. min grade of 1% to be met
                                                                                                                    PL




                                                                                                                                                                                                                                                                                                                                                          throughout
3. DO NOT SCALE FROM DRAWINGS IF IN DOUBT, ASK!!
4. CONTRACTOR SHALL VERIFY ALL LOCATIONS OF SERVICES, ALL DIMENSIONS AND LEVELS
5. ALL MATERIALS & WORKMANSHIP SHALL BE IN ACCORDANCE WITH AS2890, THE (INCLUDING
                                                                                                                                                                      F.F.L - 2.450
                                                                                                                                               SD




THE QUEENSLAND SUPPLEMENT), THE QUEENSLAND BUILDING ACT AMENDMENT ACT 1991 AND                                                                                                                                                                                     42.2
                                                                                                                                                                                                                                                                                                                                                                                          20 X 40 JOINT SEALANT
                                                                                                                                                                                                                                                     E)          86                                                             DANLEY KEY JOINT WITH
6. THE CONTRACTOR IS RESPONSIBLE TO OBTAIN RELEVANT APPROVALS PRIOR TO                                                                                                                                                                       AD
                                                                                                                                                                                                                                       .  GR                                                                                    R12 DOWELS AT 300CRS
7. ALL STORMWATER CULVERTS TO BE RCP CLASS 2. ALL ROOFWATER PIPES TO BE uPVC                                                                                                                                                       MIN
                                                                                                                                                                                                                            (1%
                                                                                                                                           F.F.L - 2.700
8. SILT MANAGEMENT PLAN TO REMAIN IN PLACE UNTIL COMPLETION OF WORKS AND                                                                                                                                             R
                                                                                                                                                                                                                  TE
                                                                                                                                                                SD




                                                                                                           F.S.L - 2.300
                                                                                                                                                                                                                 A
9. ALL PROPOSED OPERATIONAL WORKS SHALL BE CONSTRUCTED IN ACCORDANCE WITH
                                                                                                                                                                                                        MW                                                                                                                                                        TYPICAL KEY JOINT
                                                                                                                                                                                                    OR                                                                                                                                                                 Not to scale
COUNCIL'S OPERATIONAL WORKS APPROVAL LETTER AND COUNCIL'S DECISION                                                                                                                              ST                                                           Location of stormwater lines to
                                                                                                                                                                                         VC                                                                  detention tank to be detrmined
10.CONCRETE KERB RAMPS SHALL BE ALIGNED TO COMPLY WITH COUNCIL'S STANDARD                                                                                                            UP                                                                      on-site. min grade of 1% to be met
                                                                                                                                                                                                                                                                                                                                          CUT EVERY SECOND WIRE DIRECTLY
                                                                                                                                                                                 M
DRAWING AND SHALL BE CONSTRUCTED STRICTLY IN ACCORDANCE WITH COUNCIL STANDARD                                                                                               0M                                                                               throughout                                                                   UNDER JOINT AND DEPRESS FABRIC LOCALLY
                                                                                                                                                                          10
                                                                                                                                                    N
                                                                                                  14.0




                                                                                                                                                    ER
                                                                                                                                                    CIST




11. ALL TEMPORARY AND PERMANENT ROAD SIGNS AND LINEMARKING SHALL COMPLY WITH
                                                                                                   70




THE CURRENT MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES(M.U.T.C.D.). EXISTING LINE
MARKING SHALL BE REMOVED BY GRINDING NOT"BLACKING OUT". COUNCIL DOES NOT                                                                                                                                                                                                                                                                                              SAW CUT - (SC)
                                                                                                                                                                                                                                                                                                                                                                          Not to Scale
APPROVE OF BLACKING OUT OF EXISTING LINE MARKING. KERB MARKERS SHALL BE PROVIDED
                                                                                                                                                                                                                                                                                                                                               SAW CUTS (USING A SOFT CUT SAW)                                         REVISION LIST
FOR ALL WATER, TELSTRA AND ANY OTHER SERVICE CONDUIT ROAD CROSSINGS AS
                                                                                                                                                                                                                                                                                                                                               SHALL BE INSTALLED WITHING 8HRS                                         A                                 ORIGINAL ISSUE                 20/11/20
APPLICABLE.                                                                                                                                                                                                                                                                                                                                    OF CONCRETE PLACEMENT. WHERE AMBIENT
                                                                                                                                                                                                                                                                                                                                                                                                                       B                                 REVISED                        19/01/21

VEGETATION PROTECTION NOTES                                                                                                                                                                                                                                                                                                                    TEMP IS GREATER THAN 32 DEGREES
                                                                                                                                                                                                                                                                                                                                                                                                                       C                                 REVISED                        02/02/21

                                                                                                                                                                                                                 OPERATIONAL WORKS
                                                                                                                                                                                                                                                                                                                                                                                                                       D                                 REVISED                        25/03/21
1. TREES LOCATED ALONG THE FOOTPATH SHALL BE, TRANSPLANTED PRIORTO                                                                                                                                                                                                                                                                             THIS TIME SHALL BE REDUCED TO 4 HOURS
                                                                                       .56




CONSTRUCTION, OR REPLACED IF DESTROYED.                                                                                                                                                                                                                                                                                                                                                   SL72 FABRIC (CENTRAL)
                                                                                      51




                                                                                             PROPOSED PAVEMENT LEVEL
                                                                                      PL




2. WHEN WORKING WITHIN 4m OF TREES, RUBBER OR HARDWOOD GIRDLES SHALL BE
                                                                                             KEY JOINT
CONSTRUCTED WITH 1.8m BATTENS CLOSELY SPACED AND ARRANGED VERTICALLY FROM
                                                                                             SAW JOINT                                                                                                                                                                                   It is the responsibility of the
GROUND LEVEL. GIRDLES SHALL BE STRAPPED TO TREES PRIOR TO CONSTRUCTION AND                                                                                                                                  Protect       your
                                                                                                                                                                                                                                        NOTE                                             Foreman to contact the
                                                                                                                                                                                                                                        THE ENGINEER MUST BE NOTIFIED OF                 relevant service authorities to
                                                                                                                                                                                                                                                                                                                                                                    PAVEMENT DESIGN
                                                                                                                                                                                                            PERSONAL
                                                                                                                                                                                                                                        CHANGES PLANS. IF NOT, AS CONSTRUCTED            ascertain the exact location of
REMAIN UNTIL COMPLETION.                                                                                                                                                                                    INTERESTS.
                                                                                                                                                                                                                                        DRAWINGS WILL NOT BE ISSUED
                                                                                                                                                                                                              HEAD
                                                                                                                                                                                                                                                                                         services prior to construction.
                                                                                                                                                                                                                                                                                                                                                                          Not to Scale
3. TREE ROOTS SHALL BE TUNNELLED UNDER, RATHER THAN SEVERED. IF ROOTS ARE                                                                                                                                   EYES
                                                                                                                                                                                                                                                                                                                                                                                                                      Computer File




                                                                                                                                                                                                                                                                                                                                                                                                           125
                                                                                                                                                                                                            EARS
                                                                                                                                                                                                                                                                                                                                                                                                                                                                201343OW.DWG
SEVERED THE DAMAGED AREA SHALL BE TREATED WITH A SUITABLE FUNGICIDE. CONTACT                                                                                                                        HANDS
                                                                                                                                                                                                                           BODY         All proposed operational works shall be constructed
                                                                                                                                                                                                                                        in accordance with Council's Operational Works approval                                                                                                                       DRAWING NUMBER                                                 SHEET   REV.
RELEVANT COUNCIL ARBORIST FOR FURTHER ADVICE.
4. ANY TREE LOPPING REQUIRED SHOULD BE UNDERTAKEN BY AN APPROVED ARBORIST.
                                                                                                                                                                                                         FEET
                                                                                                                                                                                                                                        letter and Council's Decision Notice - Development Permit.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                  20-1343-F1           1 D
Full text of the other 5 sections

Section 2

                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          0
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       S 2
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    AR D
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                     ND
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 STA
                                                                                                                                                                                                                                                                                                                                     ST
                                                                                                                                                                                                                                                                                                                                       AN
                                                                                                                              B85                                                                                                                                        RD B8
                                                                                                                                                                                                                                                                            B85
                                                                                                                                                                                                                                                                                                                                               DA
                                                                                                                                                                                                                                                                                                                                                                                                                          B85
                                                                                                                                                                                                                                                                             2 5
                                                                                                  STANDARDS 2004 (AU_NZ)                                                                                                                                                   S
                                                                                                                                                                                                                                                                                                                                                                                                          STANDARDS 2004 (AU_NZ)
                                                                                                                                                                                                                                                                                                                                                                                                                           (c) 2021 Transoft Solutions, Inc. All rights




                                                                                                                                                                                                                                                       STANDARDS 2004 (AU_NZ) 004
                                                                                                                                                                                                                                                                                                                                                                                                                                                                          reserved.




                                                                                                                                                                                                                                                                            (c) 2021 Transoft Solutions, Inc. All rights reserved.




             B85                                                                                                                                                                                                                                                                                                                                                        (AU




                                                                                                                                               STANDARDS 2004 (AU_NZ)
STANDARDS 2004 (AU_NZ)                                                                                                                                                                                                                                                                                                                                                           _N
             (c) 2021 Transoft Solutions, Inc. All rights reserved.




                                                                                                                                                                                                                                                                                                                                                                                                Z)
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        LINDSAY CONSULTING PTY LTD




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       LINDSAY CONSULTING PTY
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          LTD




                                                                                                                                                          B85
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                             B85                                                                                                           RPEQ 4928




                                                                                                                                                                                                                                                                                                                                                                                 STANDARDS 2004 (AU_NZ)
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                              OFF.(AU_NZ)
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 STANDARDS 2004
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                              (c) 2021 Transoft Solutions, Inc. All rights reserved.




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   2C/82 PARKER STREET, MAROOCHYDORE PH 54 792 118
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        B85                                                                                                                                                                                                                                                   THIS DRAWING REMAINS THE PROPERTY OF




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               STANDARDS 2004 (AU_NZ)
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                     STANDARDS 2004 (AU_NZ)
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            (c) 2021 Transoft Solutions, Inc. All rights reserved.




                                                                                                                                                                                  STANDARDS 2004 (AU_NZ)
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                              LINDSAY CONSULTING PTY LTD AND IS FOR
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                THE SOLE USE OF THE CLIENT. NO PART
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                             MAY BE USED IN PART OR WHOLE WITHOUT




                                                                                                                                                                                                                                                                                                                                                                      B85
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 PRIOR EXPRESS WRITTEN CONSENT OF




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          B85
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      LINDSAY CONSULTING PTY LTD




                                                                                                                                                                                            B85
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       CLIENT AND PROJECT DESCRIPTION
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       CLOUT DESIGN
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       OPERATIONAL WORKS
                                                                                                                                                                                                                                                                                                                                          ST
                                                                                                                                                                                                                                                                                                                                            AN     S                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   NO. 7 WILLIAM ST
                                                                                                 STA                                                                                                                                                                                                                                            DA TANDA
                                                                                                         ND                                                                                                                                                                                                                                       RD B RDS B85                                                                                                                                                                 B85                                                                                                                                                                                                                                                                                                                                                                                                                                     NOOSAVILLE
                                                                                                                   DS B85
                                                                                                                AR
                                                                                                                                                                                                                                                                                                                                                    S 8          200
                                                                                                                                                                                                                                                                                                                                                     20 5                                                                                                                                                      STANDARDS 2004 (AU_NZ)
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    All rights reserved.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                (c) 2021 Transoft Solutions, Inc.




                                                                                                                      200                                                                                                                                                                                                                                            4 (
                                                                                                                          4 (                                                                                                                                                                                                                          04                AU_
                                                                                                                                         AU                                                                                                                                                                                                                                  NZ)
                                                                                                                                                       _N                                                                                                                                                                                                 (A
                                                                                                                                                                        Z)                                                                                                                                                                                   U_
                                                                                                                                                                                                                                                                                                                                                                NZ
                                                                                                                                                                                                                                                                                                                                                                   )                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   DRAWING TITLE
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       DETAILS




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            STA
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  ND
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       AR
                                                                                                                                                                                                                                                                                                                                                                                                              STANDARDS
                                                                                                                                                                                                                                                                                                                                                        STANDARDS 2004 (AU_NZ)




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       DS
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        B825004           (c)
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            2021
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   Trans
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                           oft
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                             Soluti
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      ons,
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                             Inc.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    All
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      rights
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               reserv
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        ed.
                                                                                                                                STANDARDS 2004 (AU_NZ)




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       SCALES




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                (AU
                                                                                                                                                                                                                                                                                                                                                                                                                B820504 (AU_NZ)
                                                                                                                                                                                                                                                                                                                                                    B85




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                              _N
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               SITE BOUNDARY LINE

                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          TRANSITION GRADE




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                              Z)
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  PROPOSED DRIVEWAY
                                                                                                                              B85




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  SURFACE                           TRANSITION GRADE
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            RL 2.380                                                                                               1:16
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  1:8                                                                                  DRIVEWAY CROSSOVER
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       RL 1.319
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                     1:16               1:40
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            RL 1.500
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         1:8

                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                KERB

                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               2000                              5040                             2000                     2900 VOS


                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         DRIVEWAY SECTION


                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        NOTES:
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        1. Kerb adaptors and other ancillary components within verge are to conform to AS 2179.1
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        for Metal Fittings. Kerb adaptors cast in marine grade aluminium are preferred.


                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        2. Roofwater/Stormwater drains are to transport only clean stormwater runoff from
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       SURVEY DATUM
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        roofed or otherwise uncontaminated areas.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  Approved Metal kerb adaptor to be full
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       .




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    Property Line
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 height of kerb and to conform with kerb                                                                                                                                3. The requirements AS 3500.3.1 Stormwater drainage - Performance requirements and the
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                             Reinstate concrete                                   and channel profile. Inverts of the kerb                                                                                                                              Queensland Building Code Regulations are to be met.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                footpath where                                         adaptor and channel are to match.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            required. (see plan)                                                                                                                                                                                                        4. Roofwater/Stormwater drain outlets are not to be positioned within 5 metres of the

                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                             B                                                                                                                                                          upstream side of a catchpit (measured from the nearest catchpit component). This is so
                                                                                                                                                     Expansion joints:
                                                                                                                                        Types 1 and 2 at 16.0m centres
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        as to not compromise the capture efficiency of the catchpit. Outlets in this area are to
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        discharge into the catchpit. The maximum discharge of stormwater drainage allowable to
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       ASSOCIATED CONSULTANTS
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        council's kerb & channel street drainage system at any one location is 25 litres/second.
                                                                                                                                              Types 3 at 6.0m centres
                                                                                                                  Type 1. 10 thick, full depth closed cell cross linked                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 5. Council approval is required to connect to stormwater infrastructure such as manholes,
                                                                                                                                     polyethylene foam (85-150kg/m )                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    catchpits and the like.
                                                                                                                  Type 2. 10 thick compressed granulated cork board
                                                                                                                Type 3. Connolly Key Joint with 100mm thick concrete                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    6. An alternative roofwater/stormwater drain within the verge is two continual lengths of

                                                                                                                          Installation to manufacturers' instructions                                                                             B                                                                                                                                                                                                                                                                 100mm ID uPVC Roofwater/Stormwater drain                                                                                                                                                                                                                            125x75x3 hot dipped galvanised RHS at a grade no flatter than 1 in 200 and cut to finish
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    (AS1260) min class SN10 with a grade no                                                                  B                                                                                                                                                          flush with the kerb profile. All cut ends are to be cold galvanised and the kerb

                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    flatter than 1 in 200 (5mm in 1m).                                                                                                                                                                                                                                  reinstated.


                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        7. Council's policy is that provision and maintenance of private roofwater/stormwater
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        drains are the responsibility of the property owner. The property owner is also
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        responsible for verge restoration to original conditions after construction.
      1200




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        8. Appropriate measures are to be then to ensure work site safety during construction.


  C                                                                                                                                                                                                                                                                                                                                                                                              C                                                                                                                                                                                                                                                                                                                                                                                      9. Verge services (Telstra/Energex etc) are normally deeper than standard
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        roofwater/stormwater drains but the position of services should be investigated. "Dial
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        before you dig" should be contacted in this regard.


                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        10. The minimum requirement for an allotment (Including subdivisions) is the provision of
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            2nd connection
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          Pro                                                                                                                                                                                                                                                                                           two kerb adaptors with pipe drainage to the far edge of the concrete footpath and the

                                                                                        Contraction joints at 2.0m centres:
                                                                                                                                                                                                                                                  B                                                                                                                                                                                                                                           p
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          Slo erty
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                           where required.                                                                                                                                                                              two kerb adaptors only where no concrete footpath is provided. Kerb outlets are

                                                                                        25 deep x 6 wide recess, saw cut,                                                                                          PLAN                                                                                                                                                                                                                                                                      pe                                                                                             Refer note 10.                                                                                                                                                                              generally to be 0.5m and 1m from the lowest side boundary and clear of unformed
                                                                                                                                                            100 or as specified




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        pedestrian walkways.
                                                                                        or crack inducer 25 deep.
                                                                                                                                                            refer note 5




                                                                                                                                                                                                                                          F72 Fabric (CENTRAL)




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                              .
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                              0.5




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       *
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    Growing medium
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    50mm minimum.
                                                                                     Contraction joint                                                                                                             Compacted 

Section 3

sub-grade                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          REVISION LIST
                                                                                                                                                                                                                                                                                                                          Expansion Joint                                                                                                                                             A                                                                                                                                                                                                                                                                               A
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                A                                    ORIGINAL ISSUE          20/11/20
                                                                                                                                                                                                       SECTION C - C




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        50
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   Compacted sand for                                                           B                                    REVISED                 19/01/21
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                              0.5




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   Break out concrete
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         Saw cut and remove a
                                                                             1450                        1200                                                                                              FOOTPATH NOTES                                                                                                                                                                                                                                                                                                     footpath between dummy                                                                                                                                                                                                                                                                                                                               bedding and backfill.
                                                                      TO BE CONFIRMED ON-SITE                                                                                                                                                                                                                                                                                                                                                                                                                                      joints. Reinstate in
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         300mm section of kerb,                                                      250                                                                                                        C                                    REVISED                 02/02/21
                                                                                                                                                                                                           1. Concrete N25 in accordance with AS 1379 and AS 3600.                             6. Concrete footpaths, adjoining existing driveways are to be                                                                                                                                           Side                                                                                                                                                                                                                                                              place adaptor then
                                                                                                                                                                                                           2. All concrete to be broom finished.                                                 transitioned over a minimum 5.0m length.                                                                                                                                                            Property              accordance with SEQ R-065.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         reinstate kerb using N25                                              SECTION B                                                                                                        D                                    REVISED                 25/03/21
                                                                                                                                                                                                           3. Contraction/expansion joints, 2m MAX spacing.                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                              concrete.                                                              Not to scale
                                                                                                                                                                                                                                                                                               7. A street opening permit must be obtained from Council, seek
                                                                                                                                                                                                           4. Finished surface tolerance to be maximum +6mm relative                             approval of location and levels prior to excavation.
                                                                                                                                                                                                                                                       -0mm                                    8. All dimensions in millimetres.
                                                                                                                                                                                                             to kerb level and crossfall specified.
                                                                                                SECTION B-B                                                                                                5. Thickness to be increased to 125mm at residential vehicular
                                                                                                                                                                                                             crossings. Reinforce with F72 MIN fabric, 50mm top and edge
                                                                                                                                                                                                             cover. Provide a contraction or expansion joint at both ends
                                                                                                                                                                                                             of thickened section.

                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               LAYBACK KERB ADAPTOR                                          UPRIGHT KERB ADAPTOR
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      Private                                                                                                Verge                                                                                                   Kerb & Channel                                Street
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                     Property                                                                                                                                                                                                                                                     Pavement
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               TYPICAL FULL HEIGHT KERB ADAPTORS                                                                                                      Computer File
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            201343OW.DWG
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         Not to scale                                                                                         DRAWING NUMBER                                               SHEET   REV.

                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                              20-1343-F2    2 D

Section 4

                      EROSION AND SEDIMENTATION MANAGEMENT PLAN                                                ENVIRONMENTAL DIARY                                                                                                                                                                                                                            CONSTRUCTION MANAGEMENT PLAN
                                                                                                               Sediment Control                                                                         Weekly Visual Inspection or After Rainfall Event
                                                                                                               Project:-                      Operational Works                                                                                            Performance
                                                                                                                                                                                                                                                           Indicators
                                                                                                                                                                                                                                                                                           Item                                      Performance Indicator                   CONSTRUCTION MANAGEMENT PLAN DIARY
                                                                                                               Principal:-
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        LINDSAY CONSULTING PTY LTD




                                                                                                               Contractor:-                   CLOUT DESIGN                                                                                                                                                                                                                                                                                                                                                                                                             LINDSAY CONSULTING PTY
Objective                Comply with all statutory regulations and maintain erosion and sedimentation                                                                                                                                                                      1. Vegetation                      No disturbance of soil below retained vegetation due to construction                                                                                                                            Weekly Visual Inspection or After Rainfall Event                            LTD
                                                                                                               Location:-                     NO 7 WILLIAM ST, NOOSAVILLE
                         controls throughout the duration of construction. Comply with the intent of the                                                                                                                                                                                                      activities.
                                                                                                               Job Ref.                       20-1343                                                                                                                                                                                                                                      Project:-                                Operational Works
                         sedimentation management plan shown on sheet 29 of the drawings prepared
                                                                                                               No:-                                                                                                                                                                                           No work conducted outside specified hours without satisfactory evidence      Principal:-
                         by Noel Covey & Associates, and other measures as deemed necessary to                 Date:-                                   Regular Monitoring (Weekly)                                                                                        2. Hours of Work                                                                                                                                                                                                                                                                                                                                  RPEQ 4928
                         control erosion and minimise sediment transport.                                                                                                                                                                                                                                     of measures taken to suppress noise and other emissions / dust.              Contractor:-                                  CLOUT DESIGN
                                                                                                               Approx Time:-                 am/pm      Special Event Monitoring (briefly describe event)                                                                                                                                                                                  Location:-                                                                                                                                                                  OFF. 2C/82 PARKER STREET, MAROOCHYDORE              PH 54 792 118
                                                                                                                                                                                                                                                                                                                                                                                                                                         NO 7 WILLIAM ST, NOOSAVILLE
                                                                                                                                          Date    Condition Corrective                                                                                                                                                                                                                     Job Ref. No:-                                 20-1343                                                                  Council File Ref. No.
Management Strategy      Site Foreman to identify direction of stormwater land flows and flows resulting             Item                Control Acceptable   Action                                  Corrective Action Taken
                                                                                                                                                                                                                                                                           3. Lighting                        No resident's complaints regarding construction security lighting.                                                                                                                                                                                    THIS DRAWING REMAINS THE PROPERTY OF
                                                                                                                                                             Required
                         from construction, and provide sediment fences, rock filter dams, turf strips,            Monitored            Measure
                                                                                                                                        Installed    ü
                                                                                                                                                                                                             (Describe)
                                                                                                                                                                                                                                                                                                              No abutting public roads contain soil, gravel, clay or other such
                                                                                                                                                                                                                                                                                                                                                                                           Date:-                                                                   Regular Monitoring (Weekly)                                                                     LINDSAY CONSULTING PTY LTD AND IS FOR
                         stormwater pit entry filters, and other measures as shown on the plan or as                                                                                                                                                                       4. Existing Roads
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      THE SOLE USE OF THE CLIENT. NO PART
                                                                                                                                                                û
                                                                                                                                                                                                                                                                                                              materials originating from onsite construction activities.                   Approx Time:-                                           am/pm            Special Event Monitoring (briefly describe event)
                         deemed necessary to prevent uncontrolled stormwater flows over unprotected
                         areas, and avoid sediment transport to waterways and stormwater pits.                      Sediment
                                                                                                                     Fences                                                                                                                                                5. Signage                         No observed or reported incidents due to inadequacy or absence of                                                                            Date Control
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  Condition           C orrective Action
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        Corrective Action Taken
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    MAY BE USED IN PART OR WHOLE WITHOUT
                                                                                                                                                                                                                                                                                                              signage or other control measures.                                                                      Item   Monitored
                                                                                                                                                                                                                                                                                                                                                                                                                                                      Measure Installed
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 Acceptable                Required
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 (Describe)            PRIOR EXPRESS WRITTEN CONSENT OF
Tasks and Actions        Erect sediment barriers as shown on sheet 29 of the drawings, and at other                                                                                                                                                                                                                                                                                                                                                                                                                                                                       LINDSAY CONSULTING PTY LTD
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                     ü
                                                                                                                      Rock
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                              û
                                                                                                                                                                                                                                                                           6. Waste Control                   No complaints from local residents and site is kept tidy at all time
Required                 locations as deemed necessary by visual inspection. Temporary rock filter dams               Filter
                                                                                                                      Dams                                                                                                                                                                                                                                                                                  Retained Vegetation
                         are to be placed at all concentrated stormwater flow outlet locations and
                         maintained with fresh filter screenings throughout the duration of construction.                                                                                                                                                                  7. Waste Minimisation              No occurrence of illegal dumping onsite and all materials where possible                                                                                                                                                                             CLIENT AND PROJECT DESCRIPTION
                         All earthworks areas to be topsoiled and seeded or hydromulched upon                                                                                                                                                                                                                 have been appropriately recycled.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       CLOUT DESIGN
                                                                                                                                                                                                                                                                                                                                                                                                                    Air Emissions
                                                                                                                  Stormwater
                         completion of profiling. All footpath areas to be provided with a minimum 4m               Outlets
                                                                                                                                                                                                                                                                           8. Dangerous Goods                 No spillage or seepage of dangerous goods stored onsite.
                         wide turf strip behind kerb and channel immediately after footpath area
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       OPERATIONAL WORKS
                                                                                                                                                                                                                                                                                                                                                                                                                       Noise

                         construction and topsoil profiling is completed. Strategically place filters around
                         all stormwater pits.                                                                       Catchpit                                                                                                                                               9. Erosion & Sedimentation         No visible signs of sediment laden waters leaving the site.
                                                                                                                     Areas
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       NO. 7 WILLIAM ST
                                                                                                                                                                                                                                                                                                                                                                                                               Security Lighting

                                                                                                                                                                                                                                                                                                              No works are carried out without implementation of the approved Traffic
Performance Indicators   Site Foreman to -                                                                                                                                                                                                                                 10. Traffic Management

                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       NOOSAVILLE
                                                                                                                                                                                                                                                                                                                                                                                                                    Vibrations


                                check for erosion and sediment flows at base of all embankments                    Pavement                                                                                                                                                                                   Management Plan.
                                                                                                                     Areas
                         ·
                         and other                                                                                                                                                                                                                                         11. Existing Infrastructure                                                                                       Existing Utilities, Roads & Drainage Infrastructure
                                exposed areas after rain;                                                                                                                                                                                                                                                     No unplanned damage to existing utilities and infrastructure.
                         ·      check that rock filter dams are working during rain periods;                       Bottom
                                check that all sediment fences and other erosion control                             of                                                                                                                                                    12. Non Conformances                                                                                                       Construction Traffic & Parking
                         ·
                                                                                                                 Embankment                                                                                                                                                                                   All non conformances have been reported and rectified
                         mechanisms are
                                working during rain periods; and                                                Humeceptors/                                                                                                                                                The site foreman is to monitor the performance of all construction activities and any departure from the                  Waste Minimisation & Recycling
                                clean and maintain filter fabric covers to pits after rain periods.                Gross                                                                                                                                   Monitoring       Construction Management Plan control measures is to be immediately rectified.                                                                                                                                                                                                          DRAWING TITLE
                         ·
                                                                                                                  Pollutant
                                                                                                                   Traps                                                                                                                                                                                                                                                                   Erosion & Sedimentation Control (Environmental Diary)
Monitoring               Site Foreman to monitor performance of all sediment controls on a
                         regular weekly basis and after every rainfall event. Any damaged                          Detention
                                                                                                                     Basin
                                                                                                                                                                                                                                                           Responsible      The site foreman is to be responsible for all inspections and maintenance of the Construction Management
                                                                                                                                                                                                                                                                                                                                                                                                                       Other
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       MANAGEMENT PLAN
                         sediment control item is to be rectified, and trapped silt removed and                                                                                                                                                            Person           Plan.
                         deposited in an area not prone to erosion.
                                                                                                                                                                                                                                                                            The site foreman is to complete the Construction Management Plan Diary (including Environmental Diary for                           Item    Monitored

                                                                                                                     Other                                                                                                                                                  sediment control) on a weekly basis as a minimum, but also after every significant rainfall event (which
Responsible Person       Site Foreman to be responsible for all inspections and maintenance of sediment                                                                                                                                                                     causes site runoff) or other special event affecting the site or any watercourses traversing the site.
                         control measures.                                                                     Any Special Comments:-                                                                                                                      Reporting        The Construction Management Plan Diary (in conjunction with the Environmental Diary) shall be completed        Any Special Comments:-
                                                                                                                                                                                                                   Signed:-                                                 and delivered to the Superintendent for record and audit purposes with each progress claim for the
Reporting                Site Foreman is to complete the Environmental Diary for sediment control on a
                         weekly basis as a minimum, but also after every significant rainfall event or other
                                                                                                                                                                                                                                                                            construction works.                                                                                                                                                                                                                                                                    SCALES
                         special event affecting the sediment control measures. The Environmental Diary
                         shall be completed and delivered to the Superintendent for record and audit                                                                                                                                                                        The site foreman is to arrange all corrective actions, controls and rectification activities, and report on                                                                                                                       Signed:-
                         purposes with each progress claim for the construction works.                                                                                                                                                                     Corrective
                                                                                                                                                                                                                                                           Actions          all measures taken in the Construction Management Plan Diary.

Corrective Actions       The Site Foreman to arrange for installation of additional sediment
                         controls and/or improve maintenance controls and replacement of
                         screenings to filter dams as required, and report on measures taken in
                         the Environmental Diary.




                                                                                                                                                                                                                                                                                                                                                              CONSTRUCTION MANAGEMENT PLAN                                                                                                                                                                         SURVEY DATUM
                                                                                                                                                                                                                                                           Objective          To comply with all statutory regulations and relevant policies, and minimise the impact on the               Construction                  11. Implement the erosion and sedimentation control measures and associated management plan contained
                                                                                                                                                                                                                                                                              environment whilst carrying out construction activities in a safe and sustainable manner.                    Management
                                                                                                                                                                                                                                                                                                                                                                                           Tasks and Actions
                                                                                                                                                                                                                                                                                                                                                                                                                             in the approved plans.
                                                                                                                                                                                                                                                                                                                                                                                                                         12. All earthwork stockpiles are to be kept moist, covered with tarpaulins or otherwise treated to
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       .
                                                                                                                                                                                                                                                                                                                                                                                           Required
                                                                                                                                                                                                                                                                                                                                                                                                                             minimise dust emissions and stored in locations which minimise the possibility of the soil entering the
                                                                                                                                                                                                                                                                                                                                                                                                                             stormwater system.
                                                                                                                                                                                                                                                           Management         To minimise the environmental and amenity impact of construction activities through onsite proactive
                                                                                                                                                                                                                                                                              approach to construction processes and consequences (cause and effect). Successful integration of
                                                                                                                                                                                                                                                                                                                                                                                                                         13. A construction shakedown area is to be installed at the entrance to the site to reduce unwanted                                       ASSOCIATED CONSULTANTS
                                                                                                                                                                                                                                                           Strategy                                                                                                                                                          soil from leaving the site via vehicle tyres.
                                                                                                                                                                                                                                                                              activities will achieve ecological sustainability which is recognised as a balance that integrates the                                     14. All site staff and sub contractors shall be directed to use the nominated shakedown entry / exit
                                                                                                                                                                                                                                                                              protection of ecological processes and natural systems, economic development, and maintenance of                                               point.
                                                                                                                                                                                                                                                                              cultural, economic, physical and social wellbeing of people in communities.                                                                15. Roads abutting the site and affected by the works shall be swept at regular intervals as required,
                                                                                                                                                                                                                                                                                                                                                                                                                             or whenever inspection shows signs of soil / pavement construction material on an abutting road or
                                                                                                                                                                                                                                                                                                                                                                                                                             at the nominated site entrance.
                                                                                                                                                                                                                                                           Construction      The following schedule of management strategies, tasks and actions for construction works forms the
                                                                                                                                                                                                                                                           Management                                                                                                                                                    16. A high level of site “housekeeping” shall be maintained to ensure that vermin are
                                                                                                                                                                                                                                                                             basis of sustainable management of site construction issues. Irrespective of whether or not an item is
                                                                                                                                                                                                                                                           Tasks and Actions                                                                                                                                               not attracted to poorly disposed of materials. Any waste or materials that have
                                                                                                                                                                                                                                                           Required          included in the following schedule however, the Contractor shall employ best practice measures to
                                                                                                                                                                                                                                                                                                                                                                                                                           been illegally dumped on site shall be removed.
                                                                                                                                                                                                                                                                              achieve sustainable outcomes at all times.
                                                                                                                                                                                                                                                                                                                                                                                                                        17. The Contractor shall provide bins for staff and sub contractors at locations
                                                                                                                                                                                                                                                                              Management Strategy / Action                                                                                                                 where food is consumed and shall ensure that such bins are used and emptied
                                                                                                                                                                                                                                                                                                                                                                                                                           at regular intervals.
                                                                                                                                                                                                                                                                              1.Ensure that all staff and sub contractors working on the site are aware of potential environmental
                                                                                                                                                                                                                                                                                                                                                                                                                        18. All materials, be they construction materials or used containers, shall either be
                                                                                                                                                                                                                                                                                  impacts and required minimum environmental control measures and responsibilities before
                                                                                                                                                                                                                                                                                                                                                                                                                           recycled onsite or alternatively transported to a Council approved recycling station
                                                                                                                                                                                                                                                                                  commencement of any site works.
                                                                                                                                                                                                                                                                                                                                                                                                                           or disposal point.
                                                                                                                                                                                                                                                                              2.Disturbance of soils below the canopy of any retained vegetation is to be excluded or otherwise                                         19. Any distillate or other petroleum products or dangerous goods stored onsite are
                                                                                                                                                                                                                                                                                 minimised in accordance with the approved plans.                                                                                          to be in bunded areas, located well clear of any watercourse. Appropriate spill
                                                                                                                                                                                                                                                                              3. No dust emissions shall extend beyond the boundary of the site.                                                                           control kits for any chemicals or stored fuels shall also be provided onsite.
                                                                                                                                                                                                                                                                                                                                                                                                                        20. Best practice management techniques shall be employed to control erosion and
                                                                                                                                                                                                                                                                              4. No odour emissions are detectable beyond the boundary of the site.                                                                        minimise sediment transport onsite, including those details contained in the
                                                                                                                                                                                                                                                                              5.Work, including plant and equipment maintenance and servicing, shall only be carried out between the                                       approved plans and the Erosion and Sedimentation Management Plan.
                                                                                                                                                                                                                                                                                 hours of 6:30am and 6:30pm Monday to Saturday inclusive. Written agreement must be provided by                                         21. The Contractor shall prepare and implement an approved Traffic Management
                                                                                                                                                                                                                                                                                 neighbouring residents if any work activity with the potential to emit excessive noise is to be                                           Plan for site construction activities. The Traffic Management Plan shall be
                                                                                                                                                                                                                                                                                 undertaken outside the above mentioned hours, and even with such consent, such activities are to be                                       provided to the Council inspector and the Supervising Engineer at the prestart
                                                                                                                                                                                                                                                                                 minimised.                                                                                                                                meeting.
                                                                                                                                                                                                                                                                                                                                                                                                                        22. Comply with any conditions of Council's operational works approval applicable to
                                                                                                                                                                                                                                                                              6.All equipment shall be acoustically treated with manufacturer supplied muffler systems with ensure
                                                                                                                                                                                                                                                                                                                                                                                                                           the works.
                                                                                                                                                                                                                                                                                 that equipment does not create environmental harm or excessive noise.                                                                                                                                                                                                             REVISION LIST
                                                                                                                                                                                                                                                                                                                                                                                                                        23. All public complaints received by the Contractor must be recorded in writing,
                                                                                                                                                                                                                                                                              7.Temporary security lighting for the site must be designed and located to ensure that its effects are                                       including any investigations undertaken, conclusions reached and actions taken as                                                       A                                 ORIGINAL ISSUE             20/11/20
                                                                                                                                                                                                                                                                                 not obtrusive and direct light spill does not alter the amenity of adjacent properties.                                                   a result of same. This complaints record is to be made available to the                                                                 B                                 REVISED                    19/01/21
                                                                                                                                                                                                                                                                                                                                                                                                                           administering authority on request.
                                                                                                                                                                                                                                                                              8.All existing utilities (roads, drainage, electrical and communication) on or adjacent the site are to be
                                                                                                                                                                                                                                                                                                                                                                                                                        24. All site personnel are to report any significant non-conformances to the site
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   C                                 REVISED                    02/02/21
                                                                                                                                                                                                                                                                                 protected and maintained at all times, with the cost of any damage to such infrastructure to be
                                                                                                                                                                                                                                                                                                                                                                                                                           manager as soon as practical and within 1 hour of the occurrence of, or                                                                 D                                 REVISED                    25/03/21
                                                                                                                                                                                                                                                                                 met by the Contractor.
                                                                                                                                                                                                                                                                                                                                                                                                                           observance of same.
                                                                                                                                                                                                                                                                              9. Any areas of high risk / danger on the site are to be adequately signposted.                                                           25. The contractor shall prepare an informative letter to be dropped to
                                                                                                                                                                                                                                                                              10. Vibration beyond the site boundary from construction activities is to be minimised and where there is                                    residents/businesses adjacent to the development. The letter is to advise
                                                                                                                                                                                                                                                                                  a likelihood of such vibration extending beyond the boundaries to an adjoining property owner, the                                       contact details for communications for the site manager, working hours, projected
                                                                                                                                                                                                                                                                                  property owner shall be advised accordingly.                                                                                             timing of works and any other information the contractor sees relevant.




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  Computer File
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            201343OW.DWG
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  DRAWING NUMBER                                             SHEET   REV.

                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                              20-1343-F3       3 D

Section 5

                                                                                                                                                                                                                                                                                                                                                                                 LINDSAY CONSULTING PTY LTD




                                                                                                                               SEDIMENT AND EROSION
                                                                                                                                                                                                                                                                                                                                                                               LINDSAY CONSULTING PTY
                                                                                                                                                                                                                                                                                                                                                                                                  LTD

                                                OPEN CONCRETE BLOCKS
                                                                                                                                  CONTROL DETAILS                                                                                                                                                                                                                              OFF. 2C/82 PARKER STREET, MAROOCHYDORE
                                                                                                                                                                                                                                                                                                                                                                                                                               RPEQ 4928
                                                                                                                                                                                                                                                                                                                                                                                                                             PH 54 792 118

                                                                                                                                                                                                                                                                                                                                                                              THIS DRAWING REMAINS THE PROPERTY OF
                                                                                                                                                                                                                                                                                                                                                                              LINDSAY CONSULTING PTY LTD AND IS FOR
                                                                                                              ALL EROSION AND SEDIMENT IN ACCORDANCE WITH IN ACCORDANCE WITH                                                                      UNDISTURBED AREA
                                                                                                                                                                                                                                                                                                                                                                                THE SOLE USE OF THE CLIENT. NO PART
                                                                                                                WITH MAROON BOOK MANUAL FOR EROSION AND SEDIMENT CONTROL                                                                                                                                                                                                      MAY BE USED IN PART OR WHOLE WITHOUT
                                                                                                                                                                                                                                                                                                                                                                                 PRIOR EXPRESS WRITTEN CONSENT OF
                                 GRAVEL FILTER                                                                                                                                                                                                                                                                                                                                      LINDSAY CONSULTING PTY LTD
                          SANDBAG OVERLAP             4.0m MIN.
                                                                                                                                                                                                                                                                                                                                                                             CLIENT AND PROJECT DESCRIPTION
                          ONTO KERB
                                                                                                               GEOTEXTILE                STAKES
                                                                                                              FILTER FABRIC                                                                   STAKES                                                                                                                                                                           CLOUT DESIGN
                                                                                                             RUNOFF WATER
                                                                                                                                                                                                                  DROP INLET
                                                                                                                                                                                                                  WITH GRATE                                                                                       1.5m TIMBER STAKES                                          OPERATIONAL WORKS
                                                                                                             WITH SEDIMENT                                                                                                                                                                                         AT MAX 2.5m CENTRES
                                                                                                                                                                                                                                                                                                                                                                               NO. 7 WILLIAM ST
                                   1.5m M




                        RUNOFF
                                                                                                                                                                                                                                                            DISTURBED
            600mm (NOM) GAP
                                                                                                                            0.2m                                                                                                                            AREA                                                                                                               NOOSAVILLE
                                       IN.




                                                                                                                                                                                                                                                                              DIRECTION OF FLOW
            BETWEEN SAND BAGS                                                                                                              FILTERED        GEOTEXTILE
            ACT AS SPILLWAY                                                                                 BURIED FABRIC                   WATER          FILTER FABRIC
                THREE LAYERS OF                                                                                                                                                                                                                                                         SEDIMENT FENCE
                SANDBAGS WITH ENDS
                OVERLAPPED.
                                                                                                                                   GEOTEXTILE INLET FILTER                                                                                                                                                                                                                   DRAWING TITLE
              DOWN STREAM GULLY PROTECTION DETAILS                                                                                                                                                                   STAKES DRIVEN INTO GROUND
                                                                                                                                                                                                                                                                      FLO
                                                                                                                                                                                                                                                                         W
                                             NOT TO SCALE                                                     GEOTEXTILE INLET FILTER CONSTRUCTION NOTES                                                                                 FL
                                                                                                                                                                                                                                            OW                                                                                                                                 SEDIMENT CONTROLS
                                                                                                              1. FABRICATE A SEDIMENT BARRIER FROM GEOTEXTILE.                                                    GEOTEXTILE FILTER FABRIC
                                                                                                              2. FOLLOW DETAIL FOR SEDIMENT FENCE FOR GEOFABRIC
                                                                                                                 INSTALLATION. REDUCE PICKET SPACINGS TO 1m CENTRES.
                                                               BURY THE TOP OF THE PLASTIC                    3. DO NOT COVER THE INLET WITH GEOTEXTILE UNLESS THE
                       FLOW
                                                               IN TRENCH MIN 300mm DEEP.                         DESIGN IS ADEQUATE TO ALLOW FOR ALL WATERS TO                                                                                                                                           23                24
                                                               STAPLE AT 150mm CENTRES.                                                                                                                                                                                             W
                                                                                                                 BYPASS IT.                                                                                                                                                      FLO




                                                                                                                                                                                                                                                                                                                                        25
                                                               COMPACT SOIL OVER BLANKET                                                                                                                                                                                                                                                                                     SCALES




                                                                                                                                                                                                                                                                                                                                                   26
                                                                                                                                                                                                                                                                                                   PRO                                       A
                                                                                                                                                                                                                                                                                                      PER
                                                                                                                                                                                                                                                                                                              TY
         CENTRELINE SECTION AT POINTS "A"                                                                                                                                                                                                                                   HOLD IN PLACE
                                                                                                                                                                                                                                                                            WITH SAND BAGS
                                                                                                                                                                                                                                                                                                                   LINE
                                                                                                                                                                                                                                                                                                                                        SEDIMENT
                                                                                                                                                                                                                                                                                                                                                        90 DEG
                                                            FILL TRENCH WITH SOIL                                                                                                                                                                                                                                                        TRAP
                                                            AND COMPACT
                                                                                                                                                                                     nm  ent                                                             GEOTEXTILE FILTER SOCK
                                                                                                                                                                                                                                                         FILLED WITH 25MM GRAVEL
                                                                                                                                                                                                                                                                                                                                             A

        OVERLAP-BURY UPPER END OF                                                                                                                      15.                      Alig
                                                        STAPLES: 8 GAUGE                                                                              MIN 0m         p  erty
    LOWER BLANKET AS IN "A". OVERLAP                    (4mm) WIRE                                                                                               Pro            Berm (300mm MIN height)
     END OF TOP BLANKET 300mm AND
                 STAPLE AT 150 CRS.
                                                                                                                        NOM                                                                                            KERB INLET PIT SEDIMENT BARRIER                                                                          SEDIMENT
                                                                                                                        200

                                                                                                                                                                                                                                                                                                                                 TRAP
                         FLOW
                                                                                                                                                                                                                                                                                                                          50m                      NOTE: POINTS A AT SAME
                                                                                                     Geotextile fabric,                                                                                                                                                                                                           MAX              ELEVATION
                                                                                                     Bidum U34 or similar                                         m                                              1.5m TIMBER STAKES
                                                                                                                                                               3.0 N                                             AT MAX 2.5m CENTRES                                                                                                                                         SURVEY DATUM
                                                                                                                                                                 MI
            CENTRELINE SECTION AT POINTS "B"                                        Unbound pavement material (gravel) to Grading                                                ha    nne
                                                                                                                                                                                          l
                                                                                                                                                                                                     ay                                             SELF-SUPPORTING
                                                                                                                                                                                                                                                    GEOTEXTILE                                          SEDIMENT FENCES
                                                                                    B, Table 9 of QT Specification MRS11.05,                                                  &c               roadw                                                                                                                                                                           .
                                                                                                                                                                        b
                                                                                    exclude material finer than sieve 2.36mm                                      Ker              rn
                                                                                                                                                                                        ew                                                                                                        Sediment Fence installed across the contour
                                                  A                                                                                                                E   xist
                                                                                                                                                                            ing,
                                                                                                                                                                                 o
                                                                                                                                                                                                          500mm TO 600mm                         DIRECTION OF
                                                                                                                                                                                                                                                 FLOW                                             - uncontoured concentration of flow should be avoided
                                                                                                                                                                                                                                                                                                                          NOT TO REGULAR SCALE
                                                                                                                                                                                                                                                                                                                                                                             ASSOCIATED CONSULTANTS
                                                                                                            Runoff from pad directed to sediment trap                                                       600mm MIN                                  ON SOIL, 150mm x 100mm
                                                                                                                                                                                                                                                       TRENCH WITH COMPACTED
                                             B                                                                                                                                                                                                         BACKFILL AND ON ROCK, SET
                                                                                                        TEMPORARY CONSTRUCTION ENTRY/EXIT SEDIMENT TRAP
                                                                                                        Not to Scale
                                                                                                                                                                                                         SECTION DETAIL                                INTO SURFACE CONCRETE
                                                                                                                                                          CATTLE GRID 3.0m NOM WIDTH
     STAPLE BLANKETS                                                                                                                                          SET 300mm ABOVE GROUND
          AT GRID OF                                                                                                      CONSTRUCTION SITE        5m
         1m CENTRES                                                                                                                            MIN                                                T
                                        B                                                                                                                                                     MEN
                                                                                                                                   NOM




                                                                                                                                                                                         LIGN
                                                                                                                                   200




                                                                                                                                                                                       A
                                                                                                                                                               10                   TY
                                                                                                                                                            MIN m               PER        EL                                                                                                    SEDIMENT FENCE CONSTRUCTION NOTES
                                   B                                                                                                                                       PRO HANN                                                                                                          ;
                                                                                                                                                                                                                                                                                             1. CONSTRUCTION SEDIMENT FENCES AS CLOSE AS
                                         FLOW




                                                                                                                                                                                   C        AY
                                                                                                 GEOFABRIC FABRIC, BIDIM A34                                                     &     ADW          KERB INLET PIT SEDIMENT BARRIER                                                          POSSIBLE TO BEING PARALLEL TO THE CONTOURS OF THE
                                                                                                                                           300




                                                                                                                                                                              B
                                                             STAPLE OUTSIDE EDGES                OR SIMILAR                                                     m         KER EW RO                 CONSTRUCTION NOTES                                                                       SITE, BUT WITH SMALL RETURNS. THE CATCHMENT AREA
                                                             AT 300mm CRS.                                                                                  3MIN                N                                                                                                            SHOULD BE       SMALL ENOUGH TO LIMIT WATER FLOW IF
                                                                                                                                                                             R                      1. FABRICATE A SLEEVE FROM GEOTEXTILE OR WIRE MESH
                                                                                                                                                                      N G ,O                           LONGER THAN THE LENGTH OF THE INLET PIT AND FILL
                                                                                                                                                                                                                                                                                             CONCENTRATED AT ONE POINT.
                                                                                                 RUNOFF TO BE DIRECTED TO A SEDIMENT TRAP,                        STI                                                                                                                        2. CUT A 150-mm DEEP TRENCH ALONG THE UPSLOPE
                                                                                                 REFER STANDARD DRAWING D-0041.                             EXI                                        WITH 25mm TO 50mm GRAVEL.                                                             LINE OF THE FENCE FOR THE BOTTOM OF THE FABRIC TO
                       CLEAN/DIRTY DIVERSION DRAINS                                                                                                                                                 2. FORM AN ELLIPTICAL CROSS-SECIRCUITION APPROX. 150mm                                   BE ENTRENCHED.
                                                                                                                                                                                                                                                                                             3. DRIVE TIMBER STAKES INTO GROUND AT 2.5m
                                                                                                                                                                                                       HIGH, 400mm WIDE.
                                                                                                                 TEMPORARY ENTRY/EXIT                                                               3. PLACE THE FILTER AT OPENING LEAVING AT LEAST                                          INTERVALS (MAX) AT THE DOWNSLOPE EDGE OF THE TRENCH.
                                                                                                                                                                                                       100mm BETWEEN KERB INLET AND SLEEVE. MAINTAIN                                         4. FIX SELF-SUPPORTING GEOTEXTILE TO THE UPSLOPE                                REVISION LIST
DIVERSION DRAIN CONSTRUCTION NOTES                                                                                                                                                                     OPENING WITH SPACER BLOCKS.                                                           SIDE OF THE POSTS ENSURING IT GOES TO THE BASE OF                               A ORIGINAL ISSUE                                     20/11/20
                                                                                                                                                                                                    4. FORM A SEAL WITH KERB TO PREVENT SEDIMENT                                             THE TRENCH. FIX THE GEOTEXTILE WITH WIRE RECOMMENDED                            B REVISED                                            19/01/21
1. REMOVE ANY ROCKS, CLODS, STICKS OR GRASS FROM THE SURFACE BEFORE LAYING PLASTIC.
                                                                                                 TEMPORARY ENTRY/EXIT CONSTRUCTION NOTES                                                                                                                                                      BY THE MANUFACTURER. THE USE OF SHADE CLOTH FOR
                                                                                                                                                                                                       BYPASS.                                                                                                                                                               C REVISED                                             02/02/21
2. ENSURE THAT TOPSOIL IS AT LEAST 75mm DEEP.                                                                                                                                                       5. SANDBAGS FILLED WITH GRAVEL CAN SUBSTITUTE FOR                                         THIS PURPOSE IS NOT SATISFACTORY.
                                                                                                 1. STRIP THE TOPSOIL, LEVEL THE SITE AND COMPACT THE SUBGRADE.                                                                                                                              5. JOIN SECTIONS OF THE FABRIC AT A SUPPORT POST                                 D REVISED                                            25/03/21
3. ENSURE PLASTIC WILL BE CONTINUOUSLY IN CONTACT WITH THE SOIL BY GRADING THE SURFACE           2. COVER THE AREA WITH NEEDLE-PUNCHED GEOTEXTILE.                                                     THE MESH OR GEOTEXTILE PROVIDED THEY ARE PLACED
   CAREFULLY FIRST.                                                                                                                                                                                    SO THAT THEY FIRMLY ABUT EACH OTHER AND                                               WITH A 150mm OVERLAP.
                                                                                                 3. CONSTRUCTION A 200mm THICK PAD OVER THE GEOTEXTILE USING ROAD BASE OR 30mm.                                                                                                              6. BACKFILL THE TRENCH OVER THE BASE OF THE FABRIC
4. LAY FABRIC IN "SHINGLE FASHION", WITH THE END OF EACH UPSTREAM ROLL OVERLAPPING THOSE         4. ENSURE THE STRUCTURE IS AT LEAST 15m LONG OR TO BUILDING ALIGNMENT AND AT                          SEDIMENT LADEN WATERS CANNOT PASS BETWEEN.
   DOWNSTREAM. ENSURE EACH ROLL IS ANCHORED PROPERLY AT ITS UPSLOPE END.                                                                                                                                                                                                                      AND COMPACT IT THOROUGHLY OVER THE GEOTEXTILE.
                                                                                                    LEAST 3m WIDE.
5. ENSURE FULL WIDTH OF FLOW CHANNEL IS COVERED BY THE PLASTIC.                                  5. WHERE SEDIMENT FENCE JOINS ONTO THE STABILISED ACCESS, CONSTRUCTION A HUMP OR
                                                                                                    GRATE IN THE STABILISED ACCESS TO DIVERT WATER TO THE SEDIMENT FENCE.



                                                                                                                                                                                                                                                                                                                                                                            Computer File
                                                                                                                                                                                                                                                                                                                                                                                                              201343OW.DWG
                                                                                                                                                                                                                                                                                                                                                                            DRAWING NUMBER                                     SHEET   REV.

                                                                                                                                                                                                                                                                                                                                                                                                               20-1343-F4        4 D

Section 6

                                                                                                                              SEDIMENT AND EROSION
                                                                                                                                 CONTROL DETAILS                                                                                                                                                                        LINDSAY CONSULTING PTY LTD




                                                                                                                                                                                                                                                                                                                      LINDSAY CONSULTING PTY
                                                                                                                                                                                                                                                                                                                                         LTD
                                                  GRATE TO BE GEOFABRIC
                                                  WRAPPED.
                                                                                                                                                                                                                                                                                                                                                                      RPEQ 4928
                                                                                                                                                                                                                                                                                                                      OFF. 2C/82 PARKER STREET, MAROOCHYDORE        PH 54 792 118
                                                                SPACER BLOCK                        EARTH BUND CONSTRUCTION NOTES                                                                                                                                                                                    THIS DRAWING REMAINS THE PROPERTY OF
                                                                                                    1. BUILD WITH GRADIENTS BETWEEN 1 PERCENT AND 5 PERCENT.                                              OVERLA                          TRAPPED SEDIMENT                                                           LINDSAY CONSULTING PTY LTD AND IS FOR
                                                                                                    2. AVOID REMOVING TREES AND SHRUBS IF POSSIBLE - WORK AROUND THEM.                                            ND FLO
 ROLL OF NETTING FILLED
 WITH 50 TO 70mm GRAVEL.
                                                                                                    3. ENSURE THE STRUCTURES ARE FREE OF PROJECTIONS OR OTHER IRREGULARITIES THAT COULD IMPEDE                             W                      TURF STRIPS                                                          THE SOLE USE OF THE CLIENT. NO PART
                                                                                                                                                                                                                                                                                                                     MAY BE USED IN PART OR WHOLE WITHOUT
                                                                                                       WATER FLOW.
                                                                                                    3. BUILD THE DRAINS WITH CIRCULAR, PARABOLIC OR TRAPEZOIDAL CROSS SECTIONS, NOT V SHAPED.                                                                                                                           PRIOR EXPRESS WRITTEN CONSENT OF
                     KERB INLET PROTECTION                                                          4. ENSURE THE BANKS ARE PROPERLY COMPACTED TO PREVENT FAILURE.
                                                                                                    5. COMPLETE PERMANENT OR TEMPORARY STABILISATION WITHIN 10 DAYS OF CONSTRUCTION.
                                                                                                                                                                                                                                                                                                                           LINDSAY CONSULTING PTY LTD
                                       NTS
                                                                                                                                                                                                                                                                                                                    CLIENT AND PROJECT DESCRIPTION

                                                                                                                             DIRECTION OF FLOW
                                                                                                                                                                                                                                                                                                                      CLOUT DESIGN
                                                                                                                                                                                                                                                                                                                      OPERATIONAL WORKS
                    OVERLA              TRAPPED SEDIMENT
                                                                                                                                                                                                            TYPICAL GRASS FILTER STRIP DETAIL                                                                         NO. 7 WILLIAM ST
                          ND FLO                                                                                                                                                                                                          N.T.S.
                                W               TURF STRIPS                                                                                                       BATTER GRADE
                                                                                                                                                                  1:2 max.                                                                                                                                            NOOSAVILLE
                                                                                               CHANNEL STABILISATION                                                             UNDISTURBED
                                                                                               AS REQUIRED                                                                       AREA
                                                                                                                         NOTE:-
                                                                                                                         Min. GRADE 0.25%
                                                                                                                         Max. GRADE 0.75%                                                                                                                                                                           DRAWING TITLE
                                                                                                                         MUST HAVE A STABILISED OUTLET.
            TURF FLARES TO
            RESTRICT SCOURING
            ALONG TURF EDGE
                                                                                                                         MAYBE USED AS CONTOUR DRAINS
                                                                                                                                                                                                                                                                                                                      SEDIMENT CONTROLS

              TURF STRIP
              BEHIND KERB                                                                                                               CAN BE CONSTRUCTED WITH
                                                                                                                      GRADIENT OF DRAIN OR WITHOUT CHANNEL
                                                   road surface
                                                                                                                      1% to 5%
                                                                                                                DIRECTION
                                                                                                                                                       ALL BATTER GRADES
                                                                                                                                                       2(H):1(V) MAX.                                                                                                SURFACE ROUGHENING                             SCALES
                                                                                                                OF FLOW

                                                                                                           150 mm min.                                     300 mm min.
                                                                                                                                                                                                                                                                            150 MM MIN.      SPILLWAY
                                                                                                                                                                                                                                                                                             150 MM MIN.
                      GRASSED     FILTER STRIPS
                            NOT TO REGULAR SCALE
                                                                                                                                    2 metres min.
                                                                                                                       NOTE: ONLY TO BE USED AS TEMPORARY BANK
                                                                                                                       WHERE MAXIMUM UPSLOPE LENGTH IS 80 METRES.

STORMWATER TREATMENT DETAILS                                                                                        EARTH BUND CUT OFF DRAIN                                                                AGGREGATE OR RECYCLED CONCRETE.                                     ROCK TRENCHED 200 MM INTO GROUND

SEDIMENT FLOCCULATION                                                                                                                                                                                                                                       FLO
The job of a flocculent is to effectively break down the dominance of the clay particles that contain a residual negative eleCIRCUITro-magnetic charge and thus allowing individual particles                                                                   W
to be drawn together and settle under gravity.                                                                                                                                                                                                                                                                      SURVEY DATUM
METHOD OF APPLICATION
Large sediment basins such as the one this site, require that the gypsum is mixed into a slurry with water and then sprayed over the surface of the turbid water in the sediment
                                                                                                                                                                                                                                                                    SPACING OF CHECK DAMS ALONG CENTRELINE
                                                                                                                                                                                                                                                                    AND SCOUR PROTECTION BELOW EACH CHECK             .
basin. It is essential that the gypsum is spread evenly over the entire surface for efficient treatment of the turbid water.                                                                                                                                        DAM TO BE SPECIFIED ON SWMP/ESCP
Generally the gypsum should be applied at a rate of about 32 kgm per 100 cubic metres of detained turbid water, as per the adjacent table.
should be calibrated after the first two storm events to assess the actual flocculent application rate and settling time required for the site.
                                                                                                                                                 The above dosing rate for the site                                                            ROCK CHECK DAM
The final application rate should be sufficiently high to permit adequate sediment sediment flocculation (less than 50 NTU) and basin dewatering within two days (48 hours) from the
                                                                                                                                                                                                                                                                                                                    ASSOCIATED CONSULTANTS
conclusion of each storm event, whilst maintaining other required water quality criteria such as pH (6.5 - 8.5) and dissolved oxygen (>80%).                                                     ROCK CHECK DAM CONSTRUCTION NOTES
                                                                                                                                                                                                 1. CHECK DAMS CAN BE BUILT WITH VARIOUS MATERIALS, INCLUDING ROCKS, LOGS, SANDBAGS AND STRAW BALES. THE
METHOD OF TESTING THE STORMWATER                                                                                                                                                                    MAINTENANCE PROGRAM SHOULD ENSURE THEIR INTEGRITY IS RETAINED, ESPECIALLY WHERE CONSTRUCTED WITH STRAW
                                                                                                                                                                                                    BALES. IN THE CASE OF BALES, THIS MIGHT REQUIRE THEIR REPLACEMENT EVERY TWO TO FOUR MONTHS.
The stormwater detained in the sediment basin will be tested at a suitable location that will be decided upon at the site. The sample should be taken at a location that has adequate
access so no sediment is resuspended while the testing is being conducted.                                                                                                                       2. TRENCH THE CHECK DAM 200 MM INTO THE GROUND ACROSS ITS WHOLE WIDTH. WHERE ROCK IS USED, FILL THE
The stormwater detained in the sediment basin will be tested with the TPS 90-FLT water quality logger. The TPS 90-FLT unit samples and records the dissolved oxygen, conductivity,                  TRENCHES TO AT LEAST 100 MM ABOVE THE GROUND SURFACE TO REDUCE THE RISK OF UNDERCUTTING.
pH, turbidity and temperature of the stormwater. For further details and specifications on the TPS 90-FLT please refer to Appendix B.                                                            3. NORMALLY, THEIR MAXIMUM HEIGHT SHOULD NOT EXCEED 600 MM ABOVE THE GULLY FLOOR. THE CENTRE SHOULD
If the TPS 90-FLT unit is not present a practical field test that approximates the required 50 NTU level is to fill a clear plastic or glass 65mm diameter soft drink bottle with the               ACTING AS A SPILLWAY, BEING AT LEAST 150 MM LOWER THAN THE OUTER EDGES.
water and then hold it up to the light. If seeing clearly through the sample is not possible, then the sample is probably above the 50 NTU level.
                                                                                                                                                                                                 4. SPACE THE DAMS SO THE TOE OF THE UPSTREAM DAM IS LEVEL WITH THE SPILLWAY OF THE NEXT DOWNSTREAM
                                                                                                                                                                                                    DAM.
METHOD OF DEWATERING
The sediment basin can be dewatered as soon as the water quality criteria met (refer table below). A pump is to be used to decant the basin with a floating inlet to prevent the
settled sediments from being removed from the basin. The pumping must cease prior to the settled sediments being drawn into the intake pipe, it is essential that materials from
the sediment layer are not discharged in the pumping process.                                                                                                                                                                                                                       STABILISE STOCKPILE
                                                                                                                                                                                                                                               .)                                   SURFACE
                                                                                                                                                                                                              EARTH BANK                    MAX                     2:1
                                                                                                                                                                                                                                           (
                                                                                                                                                                                                  FLOW                               SLOPE                                SLO
                                                                                                                                                                                                                                                                             PE
 STORMWATER DISCHARGE QUALITY CRITERIA                                                                                                                                                                                         2:1                                                (MA
                                                                                                                                                                                                                                                                                     X.)
   ACCEPTABLE       TSS            ACCEPTABLE      PH         DISSOLVED    O2


   50mg/L                             6.5 - 8.5                   > 80%                                                                                                                                                                                                             SEDIMENT FENCE
                                                                                                                                                                                                                                          TOPSOIL STOCKPILE
                                                                                                                                                                                                                                                                                                                    REVISION LIST
                                                                                                                                                                                                   TOPSOIL STOCKPILE CONSTRUCTION NOTES                                                                             A ORIGINAL ISSUE                                     20/11/20
                                                                                                                                                                                                                                                                                                                    B REVISED                                            19/01/21
 SEDIMENT BASIN FLOCCULENT APPLICATION                                                                                                                                                             1. PLACE STOCKPILES MORE THAN 2 (PREFERABLY 5) METRES FROM EXISTING VEGETATION, CONCENTRATED                     C REVISED                                            02/02/21
                                                                                                                                                                                                      WATER FLOW, ROADS AND HAZARD AREAS.                                                                            D REVISED                                            25/03/21
 AGENT          INDICATIVE         DOSAGE         COMMENTS                               PRECAUTIONS        &   CONSTRAINTS           MIN.   REQD.    ON   SITE
                                                                                                                                                                                                   2. CONSTRUCTION ON THE CONTOUR AS LOW, FLAT, ELONGATED MOUNDS.
                                                                                                                                                                                                   3. WHERE THERE IS SUFFICIENT AREA, TOPSOIL STOCKPILES SHALL BE LESS THAN 2 METRES IN HEIGHT.
                                                                                                                                                                                                   4. WHERE THEY ARE TO BE IN PLACE FOR MORE THAN 10 DAYS, STABILISE FOLLOWING THE APPROVED
  GYPSUM        32kg/100cub.m                     LITTLE PH CHANGE, SLIGHT INCREASE IN   NEEDS TO BE SPREAD EVENLY ACROSS POND.      260 kgm                                                          ESCP OR SWMP TO REDUCE THE C-FACIRCUITOR TO LESS THAN 0.10.
                                                  SALINITY                               CAN CAUSE SCUM DEPOSITS IN EQUIPMENT.                                                                     5. CONSTRUCTION EARTH BANKS (STANDARD DRAWING 5-5) ON THE UPSLOPE SIDE TO DIVERT WATER AROUND
                                                                                                                                                                                                      STOCKPILES AND SEDIMENT FENCES (STANDARD DRAWING 6-8) 1 TO 2 METRES DOWNSLOPE.
 NOTE: NOTIFY ENGINEER TO CONFIRM DOSAGES & APPLICATION PRIOR TO USE.




                                                                                                                                                                                                                                                                                                                   Computer File
                                                                                                                                                                                                                                                                                                                                                     201343OW.DWG
                                                                                                                                                                                                                                                                                                                   DRAWING NUMBER                                     SHEET   REV.

                                                                                                                                                                                                                                                                                                                                                      20-1343-F5        5 D

Used in these records

About this file

File size
3.5 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

201343OW(D).pdf · 3.5 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.