Skip to the record
Search everything, all in one place.

Council archive · source document

201343Ow(D) · OPW21/0107

Attached to the e-mail Operational Works Application OPW21/0107 - 7 William St Noosaville - Pivotal Perspective.

of 6

Text shows just the words. Original shows the document exactly as it was published.

Original PDF page 4, section 1. The text section number identifies this passage in the reader.

                                                                                                                                                                                                                                                                                                                                                                                 LINDSAY CONSULTING PTY LTD




                                                                                                                               SEDIMENT AND EROSION
                                                                                                                                                                                                                                                                                                                                                                               LINDSAY CONSULTING PTY
                                                                                                                                                                                                                                                                                                                                                                                                  LTD

                                                OPEN CONCRETE BLOCKS
                                                                                                                                  CONTROL DETAILS                                                                                                                                                                                                                              OFF. 2C/82 PARKER STREET, MAROOCHYDORE
                                                                                                                                                                                                                                                                                                                                                                                                                               RPEQ 4928
                                                                                                                                                                                                                                                                                                                                                                                                                             PH 54 792 118

                                                                                                                                                                                                                                                                                                                                                                              THIS DRAWING REMAINS THE PROPERTY OF
                                                                                                                                                                                                                                                                                                                                                                              LINDSAY CONSULTING PTY LTD AND IS FOR
                                                                                                              ALL EROSION AND SEDIMENT IN ACCORDANCE WITH IN ACCORDANCE WITH                                                                      UNDISTURBED AREA
                                                                                                                                                                                                                                                                                                                                                                                THE SOLE USE OF THE CLIENT. NO PART
                                                                                                                WITH MAROON BOOK MANUAL FOR EROSION AND SEDIMENT CONTROL                                                                                                                                                                                                      MAY BE USED IN PART OR WHOLE WITHOUT
                                                                                                                                                                                                                                                                                                                                                                                 PRIOR EXPRESS WRITTEN CONSENT OF
                                 GRAVEL FILTER                                                                                                                                                                                                                                                                                                                                      LINDSAY CONSULTING PTY LTD
                          SANDBAG OVERLAP             4.0m MIN.
                                                                                                                                                                                                                                                                                                                                                                             CLIENT AND PROJECT DESCRIPTION
                          ONTO KERB
                                                                                                               GEOTEXTILE                STAKES
                                                                                                              FILTER FABRIC                                                                   STAKES                                                                                                                                                                           CLOUT DESIGN
                                                                                                             RUNOFF WATER
                                                                                                                                                                                                                  DROP INLET
                                                                                                                                                                                                                  WITH GRATE                                                                                       1.5m TIMBER STAKES                                          OPERATIONAL WORKS
                                                                                                             WITH SEDIMENT                                                                                                                                                                                         AT MAX 2.5m CENTRES
                                                                                                                                                                                                                                                                                                                                                                               NO. 7 WILLIAM ST
                                   1.5m M




                        RUNOFF
                                                                                                                                                                                                                                                            DISTURBED
            600mm (NOM) GAP
                                                                                                                            0.2m                                                                                                                            AREA                                                                                                               NOOSAVILLE
                                       IN.




                                                                                                                                                                                                                                                                              DIRECTION OF FLOW
            BETWEEN SAND BAGS                                                                                                              FILTERED        GEOTEXTILE
            ACT AS SPILLWAY                                                                                 BURIED FABRIC                   WATER          FILTER FABRIC
                THREE LAYERS OF                                                                                                                                                                                                                                                         SEDIMENT FENCE
                SANDBAGS WITH ENDS
                OVERLAPPED.
                                                                                                                                   GEOTEXTILE INLET FILTER                                                                                                                                                                                                                   DRAWING TITLE
              DOWN STREAM GULLY PROTECTION DETAILS                                                                                                                                                                   STAKES DRIVEN INTO GROUND
                                                                                                                                                                                                                                                                      FLO
                                                                                                                                                                                                                                                                         W
                                             NOT TO SCALE                                                     GEOTEXTILE INLET FILTER CONSTRUCTION NOTES                                                                                 FL
                                                                                                                                                                                                                                            OW                                                                                                                                 SEDIMENT CONTROLS
                                                                                                              1. FABRICATE A SEDIMENT BARRIER FROM GEOTEXTILE.                                                    GEOTEXTILE FILTER FABRIC
                                                                                                              2. FOLLOW DETAIL FOR SEDIMENT FENCE FOR GEOFABRIC
                                                                                                                 INSTALLATION. REDUCE PICKET SPACINGS TO 1m CENTRES.
                                                               BURY THE TOP OF THE PLASTIC                    3. DO NOT COVER THE INLET WITH GEOTEXTILE UNLESS THE
                       FLOW
                                                               IN TRENCH MIN 300mm DEEP.                         DESIGN IS ADEQUATE TO ALLOW FOR ALL WATERS TO                                                                                                                                           23                24
                                                               STAPLE AT 150mm CENTRES.                                                                                                                                                                                             W
                                                                                                                 BYPASS IT.                                                                                                                                                      FLO




                                                                                                                                                                                                                                                                                                                                        25
                                                               COMPACT SOIL OVER BLANKET                                                                                                                                                                                                                                                                                     SCALES




                                                                                                                                                                                                                                                                                                                                                   26
                                                                                                                                                                                                                                                                                                   PRO                                       A
                                                                                                                                                                                                                                                                                                      PER
                                                                                                                                                                                                                                                                                                              TY
         CENTRELINE SECTION AT POINTS "A"                                                                                                                                                                                                                                   HOLD IN PLACE
                                                                                                                                                                                                                                                                            WITH SAND BAGS
                                                                                                                                                                                                                                                                                                                   LINE
                                                                                                                                                                                                                                                                                                                                        SEDIMENT
                                                                                                                                                                                                                                                                                                                                                        90 DEG
                                                            FILL TRENCH WITH SOIL                                                                                                                                                                                                                                                        TRAP
                                                            AND COMPACT
                                                                                                                                                                                     nm  ent                                                             GEOTEXTILE FILTER SOCK
                                                                                                                                                                                                                                                         FILLED WITH 25MM GRAVEL
                                                                                                                                                                                                                                                                                                                                             A

        OVERLAP-BURY UPPER END OF                                                                                                                      15.                      Alig
                                                        STAPLES: 8 GAUGE                                                                              MIN 0m         p  erty
    LOWER BLANKET AS IN "A". OVERLAP                    (4mm) WIRE                                                                                               Pro            Berm (300mm MIN height)
     END OF TOP BLANKET 300mm AND
                 STAPLE AT 150 CRS.
                                                                                                                        NOM                                                                                            KERB INLET PIT SEDIMENT BARRIER                                                                          SEDIMENT
                                                                                                                        200

                                                                                                                                                                                                                                                                                                                                 TRAP
                         FLOW
                                                                                                                                                                                                                                                                                                                          50m                      NOTE: POINTS A AT SAME
                                                                                                     Geotextile fabric,                                                                                                                                                                                                           MAX              ELEVATION
                                                                                                     Bidum U34 or similar                                         m                                              1.5m TIMBER STAKES
                                                                                                                                                               3.0 N                                             AT MAX 2.5m CENTRES                                                                                                                                         SURVEY DATUM
                                                                                                                                                                 MI
            CENTRELINE SECTION AT POINTS "B"                                        Unbound pavement material (gravel) to Grading                                                ha    nne
                                                                                                                                                                                          l
                                                                                                                                                                                                     ay                                             SELF-SUPPORTING
                                                                                                                                                                                                                                                    GEOTEXTILE                                          SEDIMENT FENCES
                                                                                    B, Table 9 of QT Specification MRS11.05,                                                  &c               roadw                                                                                                                                                                           .
                                                                                                                                                                        b
                                                                                    exclude material finer than sieve 2.36mm                                      Ker              rn
                                                                                                                                                                                        ew                                                                                                        Sediment Fence installed across the contour
                                                  A                                                                                                                E   xist
                                                                                                                                                                            ing,
                                                                                                                                                                                 o
                                                                                                                                                                                                          500mm TO 600mm                         DIRECTION OF
                                                                                                                                                                                                                                                 FLOW                                             - uncontoured concentration of flow should be avoided
                                                                                                                                                                                                                                                                                                                          NOT TO REGULAR SCALE
                                                                                                                                                                                                                                                                                                                                                                             ASSOCIATED CONSULTANTS
                                                                                                            Runoff from pad directed to sediment trap                                                       600mm MIN                                  ON SOIL, 150mm x 100mm
                                                                                                                                                                                                                                                       TRENCH WITH COMPACTED
                                             B                                                                                                                                                                                                         BACKFILL AND ON ROCK, SET
                                                                                                        TEMPORARY CONSTRUCTION ENTRY/EXIT SEDIMENT TRAP
                                                                                                        Not to Scale
                                                                                                                                                                                                         SECTION DETAIL                                INTO SURFACE CONCRETE
                                                                                                                                                          CATTLE GRID 3.0m NOM WIDTH
     STAPLE BLANKETS                                                                                                                                          SET 300mm ABOVE GROUND
          AT GRID OF                                                                                                      CONSTRUCTION SITE        5m
         1m CENTRES                                                                                                                            MIN                                                T
                                        B                                                                                                                                                     MEN
                                                                                                                                   NOM




                                                                                                                                                                                         LIGN
                                                                                                                                   200




                                                                                                                                                                                       A
                                                                                                                                                               10                   TY
                                                                                                                                                            MIN m               PER        EL                                                                                                    SEDIMENT FENCE CONSTRUCTION NOTES
                                   B                                                                                                                                       PRO HANN                                                                                                          ;
                                                                                                                                                                                                                                                                                             1. CONSTRUCTION SEDIMENT FENCES AS CLOSE AS
                                         FLOW




                                                                                                                                                                                   C        AY
                                                                                                 GEOFABRIC FABRIC, BIDIM A34                                                     &     ADW          KERB INLET PIT SEDIMENT BARRIER                                                          POSSIBLE TO BEING PARALLEL TO THE CONTOURS OF THE
                                                                                                                                           300




                                                                                                                                                                              B
                                                             STAPLE OUTSIDE EDGES                OR SIMILAR                                                     m         KER EW RO                 CONSTRUCTION NOTES                                                                       SITE, BUT WITH SMALL RETURNS. THE CATCHMENT AREA
                                                             AT 300mm CRS.                                                                                  3MIN                N                                                                                                            SHOULD BE       SMALL ENOUGH TO LIMIT WATER FLOW IF
                                                                                                                                                                             R                      1. FABRICATE A SLEEVE FROM GEOTEXTILE OR WIRE MESH
                                                                                                                                                                      N G ,O                           LONGER THAN THE LENGTH OF THE INLET PIT AND FILL
                                                                                                                                                                                                                                                                                             CONCENTRATED AT ONE POINT.
                                                                                                 RUNOFF TO BE DIRECTED TO A SEDIMENT TRAP,                        STI                                                                                                                        2. CUT A 150-mm DEEP TRENCH ALONG THE UPSLOPE
                                                                                                 REFER STANDARD DRAWING D-0041.                             EXI                                        WITH 25mm TO 50mm GRAVEL.                                                             LINE OF THE FENCE FOR THE BOTTOM OF THE FABRIC TO
                       CLEAN/DIRTY DIVERSION DRAINS                                                                                                                                                 2. FORM AN ELLIPTICAL CROSS-SECIRCUITION APPROX. 150mm                                   BE ENTRENCHED.
                                                                                                                                                                                                                                                                                             3. DRIVE TIMBER STAKES INTO GROUND AT 2.5m
                                                                                                                                                                                                       HIGH, 400mm WIDE.
                                                                                                                 TEMPORARY ENTRY/EXIT                                                               3. PLACE THE FILTER AT OPENING LEAVING AT LEAST                                          INTERVALS (MAX) AT THE DOWNSLOPE EDGE OF THE TRENCH.
                                                                                                                                                                                                       100mm BETWEEN KERB INLET AND SLEEVE. MAINTAIN                                         4. FIX SELF-SUPPORTING GEOTEXTILE TO THE UPSLOPE                                REVISION LIST
DIVERSION DRAIN CONSTRUCTION NOTES                                                                                                                                                                     OPENING WITH SPACER BLOCKS.                                                           SIDE OF THE POSTS ENSURING IT GOES TO THE BASE OF                               A ORIGINAL ISSUE                                     20/11/20
                                                                                                                                                                                                    4. FORM A SEAL WITH KERB TO PREVENT SEDIMENT                                             THE TRENCH. FIX THE GEOTEXTILE WITH WIRE RECOMMENDED                            B REVISED                                            19/01/21
1. REMOVE ANY ROCKS, CLODS, STICKS OR GRASS FROM THE SURFACE BEFORE LAYING PLASTIC.
                                                                                                 TEMPORARY ENTRY/EXIT CONSTRUCTION NOTES                                                                                                                                                      BY THE MANUFACTURER. THE USE OF SHADE CLOTH FOR
                                                                                                                                                                                                       BYPASS.                                                                                                                                                               C REVISED                                             02/02/21
2. ENSURE THAT TOPSOIL IS AT LEAST 75mm DEEP.                                                                                                                                                       5. SANDBAGS FILLED WITH GRAVEL CAN SUBSTITUTE FOR                                         THIS PURPOSE IS NOT SATISFACTORY.
                                                                                                 1. STRIP THE TOPSOIL, LEVEL THE SITE AND COMPACT THE SUBGRADE.                                                                                                                              5. JOIN SECTIONS OF THE FABRIC AT A SUPPORT POST                                 D REVISED                                            25/03/21
3. ENSURE PLASTIC WILL BE CONTINUOUSLY IN CONTACT WITH THE SOIL BY GRADING THE SURFACE           2. COVER THE AREA WITH NEEDLE-PUNCHED GEOTEXTILE.                                                     THE MESH OR GEOTEXTILE PROVIDED THEY ARE PLACED
   CAREFULLY FIRST.                                                                                                                                                                                    SO THAT THEY FIRMLY ABUT EACH OTHER AND                                               WITH A 150mm OVERLAP.
                                                                                                 3. CONSTRUCTION A 200mm THICK PAD OVER THE GEOTEXTILE USING ROAD BASE OR 30mm.                                                                                                              6. BACKFILL THE TRENCH OVER THE BASE OF THE FABRIC
4. LAY FABRIC IN "SHINGLE FASHION", WITH THE END OF EACH UPSTREAM ROLL OVERLAPPING THOSE         4. ENSURE THE STRUCTURE IS AT LEAST 15m LONG OR TO BUILDING ALIGNMENT AND AT                          SEDIMENT LADEN WATERS CANNOT PASS BETWEEN.
   DOWNSTREAM. ENSURE EACH ROLL IS ANCHORED PROPERLY AT ITS UPSLOPE END.                                                                                                                                                                                                                      AND COMPACT IT THOROUGHLY OVER THE GEOTEXTILE.
                                                                                                    LEAST 3m WIDE.
5. ENSURE FULL WIDTH OF FLOW CHANNEL IS COVERED BY THE PLASTIC.                                  5. WHERE SEDIMENT FENCE JOINS ONTO THE STABILISED ACCESS, CONSTRUCTION A HUMP OR
                                                                                                    GRATE IN THE STABILISED ACCESS TO DIVERT WATER TO THE SEDIMENT FENCE.



                                                                                                                                                                                                                                                                                                                                                                            Computer File
                                                                                                                                                                                                                                                                                                                                                                                                              201343OW.DWG
                                                                                                                                                                                                                                                                                                                                                                            DRAWING NUMBER                                     SHEET   REV.

                                                                                                                                                                                                                                                                                                                                                                                                               20-1343-F4        4 D

Used in these records

About this file

File size
3.5 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

201343OW(D).pdf · 3.5 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.