Skip to the record
For the highest quality transcripts.

Original source · versioned page text

2018-10-15 General Committee Agenda

of 55

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

                       AGENDA


         General Committee
              Meeting


             Monday, 15 October 2018

                   commencing at 10am
         Council Chambers, 9 Pelican Street, Tewantin



Committee:   Crs Frank Wilkie (Chair), Jess Glasgow, Ingrid Jackson,
             Joe Jurisevic, Frank Pardon, Brian Stockwell, Tony Wellington



                    “Noosa Shire – different by nature”
Log in to download the original file

2018-10-15 General Committee Agenda(PDF, 4MB).pdf · 4.1 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 54 sections

Section 2

GENERAL COMMITTEE MEETING AGENDA                                                    15 OCTOBER 2018


TABLE OF CONTENTS

ITEM                                                                                          PAGE


ATTENDANCE & APOLOGIES                                                                             -
PRESENTATIONS                                                                                      -
ITEMS REFERRED FROM PLANNING & ENVIRONMENT COMMITTEE                                               -
1      MCU16/0079.02 FURTHER REPORT – REQUEST TO CHANGE A DEVELOPMENT
       APPROVAL FOR 5 MEMORIAL DRIVE, TEWANTIN
       (Planning & Environment Committee Agenda, 9 October 2018, Item 1, Page 3)
       Reason for referral – For further discussion

2      MCU18/0019 – DEVELOPMENT APPLICATION FOR A MATERIAL CHANGE OF
       USE FOR MULTIPLE HOUSING TYPE 3 – RETIREMENT & SPECIAL NEEDS (90
       BED AGED CARE FACILITY) AT 52 – 62 GOODCHAP STREET AND 3 – 11 VAL
       CRESCENT, NOOSAVILLE
       (Planning & Environment Committee Agenda, 9 October 2018, Item 3, Page 19)
       Reason for referral – For a further report (Refer Item 4 below)


ITEMS REFERRED FROM SERVICES & ORGANISATION COMMITTEE                                              -
3      COOROY HINTERLAND PLAYGROUND PROJECT UPDATE & ESTABLISHMENT
       OF PROJECT GROUPS
       (Services & Organisation Committee Agenda, 9 October 2018, Item 1, Page 3)
       Reason for referral – Significance of the issue


REPORTS DIRECT TO GENERAL COMMITTEE                                                               3

4      FURTHER REPORT - MCU18/0019 DEVELOPMENT APPLICATION FOR A
       MATERIAL CHANGE OF USE FOR MULTIPLE HOUSING - TYPE 3 RETIREMENT
       AND SPECIAL NEEDS (90 BED AGED CARE FACILITY) AT 52 - 62 GOODCHAP
       STREET AND 3 - 11 VAL CRESCENT, NOOSAVILLE                                                 3

5      MCU18/0094 - DEVELOPMENT APPLICATION FOR MATERIAL CHANGE OF
       USE - MULTIPLE HOUSING TYPE 4 (4 DWELLING UNITS), 15 GARNET
       STREET, COOROY                                                                            22

6      NOOSA GYMNASTICS CLUB CAPITAL CONTRIBUTION PAYMENT AND NEW
       LEASE                                                                                     34

7      CAPITAL PROGRAM DELIVERY STATUS - SEPTEMBER 2018                                          37

8      FINANCIAL PERFORMANCE REPORT - SEPTEMBER 2018                                             46


CLOSED SESSION                                                                               -




                                                                                        Page 2 of 55

Section 3

GENERAL COMMITTEE MEETING AGENDA                                                                      15 OCTOBER 2018


REPORTS DIRECT TO GENERAL COMMITTEE
4                        FURTHER REPORT - MCU18/0019 DEVELOPMENT APPLICATION FOR A MATERIAL
                         CHANGE OF USE FOR MULTIPLE HOUSING - TYPE 3 RETIREMENT AND SPECIAL
                         NEEDS (90 BED AGED CARE FACILITY) AT 52 - 62 GOODCHAP STREET AND 3 - 11
                         VAL CRESCENT, NOOSAVILLE
DOCUMENT INFORM AT ION




Author                              Development Planner, Glen Conforti
                                    Environment and Sustainability Department

Index                               ECM/ Application/ MCU18/0019

Attachments                         Nil



EXECUTIVE SUMMARY
Not applicable.


RECOMMENDATION
That Council note the report by the Development Planner to the Planning & Environment
Committee Meeting dated 9 October 2018 and the General Committee Meeting dated 15 October
2018 regarding Application No. MCU18/0019 for a Development Permit for Material Change of
Use - Multiple Housing –Type 3 Retirement & Special Needs (90 bed aged care facility) situated
at 52 – 62 Goodchap Street & 3 - 11 Val Crescent, Noosaville and:
A.                       Approve the application in accordance with the following conditions:
                              PLANNING
                              When Conditions must be Complied With
                         1.   Unless otherwise stated, all conditions of this Decision Notice must be complied with
                              prior to the use commencing, and then compliance maintained at all times while the
                              use continues.
                              Approved Plans
                         2.   Development undertaken in accordance with this approval must generally comply
                              with the approved plans of development. The approved plans are listed in the
                              following table unless otherwise amended by these conditions.
                               Plan No.        Rev.   Plan/Document Name
                               A-DA-01.01      D      Site Plan, prepared by Elevation Architecture
                               A-DA-03.01      K      Basement GA Floor Plan, prepared by Elevation Architecture
                               A-DA-03.02      K      Basement GA Floor Plan, prepared by Elevation Architecture
                               A-DA-03.03      I      Level 1 GA Floor Plan, prepared by Elevation Architecture
                               A-DA-04.01      F      Roof Plan, prepared by Elevation Architecture
                               A-DA-09.01      G      Elevations Plan, prepared by Elevation Architecture
                               A-DA-10.01      G      Site Sections, prepared by Elevation Architecture
                               A-DA-10.02      F      Site Sections (Sheet 02), prepared by Elevation Architecture
                               A-DA-22.01      G      Goodchap Street (south), prepared by Elevation Architecture


                                                                                                            Page 3 of 55

Section 4

GENERAL COMMITTEE MEETING AGENDA                                               15 OCTOBER 2018


         A-DA-22.02      E       Goodchap Street (east), prepared by Elevation Architecture
         A-DA-22.03      E       Porte Cochere (Goodchap St), prepared by Elevation Architecture
         A-DA-22.04      G       Goodchap Street (north), prepared by Elevation Architecture
         A-DA-22.05      G       Val Crescent (north), prepared by Elevation Architecture
         A-DA-22.06      G       Val Crescent (west), prepared by Elevation Architecture
         A-DA-22.07      F       Val Crescent (south), prepared by Elevation Architecture

   3.    The Approved Plans must be amended to incorporate the amendments listed within
         this Decision Notice and resubmitted to Council prior to the issue of any Development
         Permit for Operational Works.
         Nature and Extent of Approved Use
   4.    The ‘café’ must be used for residents and their guests only and not be for general
         public use. No external signage advertising the café is permitted.
         Building Height
   5.    The maximum height of the development must not exceed 8 metres above the
         finished ground level and the natural ground surface except for the lift overruns and
         the centrally located skillion roof eaves which must not exceed the height indicated
         on the approved plans and not exceed 8.8m above the natural ground level.
   6.    The maximum height of the development must be 2 storeys. A 0.75m wide garden
         must be provided for the full length of the plant room wall near the driveway to a
         height of a maximum of 1m below the ground floor so as to not constitute a storey
         pursuant to The Noosa Plan. Amended plans must be submitted to Council prior to
         the issue of an operational works approval demonstrating compliance with the
         maximum height.
   7.    Certification must be submitted to Council from a Licensed Surveyor which certifies
         that the building does not exceed the maximum height requirements of this Decision
         Notice.
         Performance Bond
   8.    Security in the form of a cash bond or trading bank guarantee to the sum of $50,000
         must be submitted to Council, to secure performance of all conditions of this
         approval, prior to the pre-start meeting. The cash bond or trading bank guarantee will
         be returned on performance of the conditions of approval less any costs incurred by
         Council in respect of enforcing performance of this permit. Council reserves the right
         to call upon the bond or guaranteed sum to effect compliance with conditions.
         Street Identification
   9.    The street address of the development must be clearly visible and discernible from
         the primary frontage of the site by the provision of a street number and, where
         appropriate, the building name.
         Building Appearance
   10.   External finishes must consist of a mix of materials in accordance with the approved
         plans. The parapet facing Goodchap Street must be articulated to break up its length
         and present a more domestic scale and appearance.
   11.   All air conditioning units or other mechanical equipment must be fully enclosed or
         screened such that they are not visible from the street frontages or adjoining
         properties.




                                                                                      Page 4 of 55

Section 5

GENERAL COMMITTEE MEETING AGENDA                                            15 OCTOBER 2018


         Protection of Privacy
   12.   To ensure privacy is protected between adjoining properties all windows and glass
         doors located on the upper level of the southern building face must either:
               have a minimum window sill height or 1.5 metres above floor level
               be fitted with translucent glazing
               be fitted with a fixed external screen
         ENVIRONMENTAL HEALTH
         Amenity
   13.   The development must be undertaken and operated in a manner that causes no
         detrimental effect upon the amenity of the neighbourhood by reason of the creation of
         excessive noise, lighting, air-borne hazards, atmospheric pollutants (including dust or
         odours) nuisance or any other emissions in accordance with the nuisance provisions
         of the Environmental Protection Act 1994.
         Noise Nuisance
   14.   Noise emission from mechanical equipment must comply with the following
         requirements:
               Air-conditioning,    refrigeration,  fans   including     mechanical     exhaust
               fans/ventilation, plant rooms and refuse compactors:
                   7am to 10pm: Maximum background + 5dB(A)
                   10pm to 7am: Maximum background + 3dB(A)
   15.   Submission of written certification from a suitably qualified person confirming that the
         noise levels from all mechanical equipment comply with the noise requirements of
         this Decision Notice when measured at either the residential boundary or outside the
         most exposed part of an affected building, whichever is the closest to the equipment.
         The assessment and certification is required immediately after installation of the
         equipment and prior to any occupation of the building, and in a format approved by
         Council. All equipment should be operating at the same time to test the overall noise
         level created.
         Kitchen Exhaust
   16.   Kitchen exhaust points for the development must be located and operated in
         accordance with Australian Standard AS1668.2-2002 “The use of ventilation and air-
         conditioning in buildings” (specifically Section 5.10 – Air Discharges).
   17.   The development must be constructed with reticulated ducting inside the building to
         transfer kitchen exhaust fumes to a discharge point on the roof.
   18.   Submission of written certification must be provided from a suitably qualified person
         confirming that the kitchen exhaust is constructed, installed and is operating in
         accordance with Australian Standard AS1668.2-2002.
         The assessment and certification is required immediately after installation of the
         equipment and prior to any occupation of the building, and in a format approved by
         Council.
         Service Vehicles
   19.   Deliveries to the site must be between 7.00am and 6.00pm Monday to Saturday and
         not permitted on Sunday or public holidays.




                                                                                   Page 5 of 55

Section 6

GENERAL COMMITTEE MEETING AGENDA                                            15 OCTOBER 2018


         Building Demolition/Removal/Relocation
   20.   Where the development involves the removal, relocation or demolition of a building, a
         Waste Management Plan (construction and demolition) in accordance with Planning
         Scheme Policy 11, Waste Management Plans must be submitted and approved by
         Council’s Environmental Health Officer prior to issue of a development permit for
         operational works for demolition, removal or relocation of any building other than a
         shed.
         The purpose of the Waste Management Plan is to facilitate the segregation of waste
         for the effective reuse and recycling of such materials. Segregated wastes attract
         significantly reduced disposal fees at the landfill with some items free. Higher gate
         fees are charged for mixed waste.
         Waste storage areas must provide adequate separation of all reusable, recyclable
         and waste materials. These must be located so that they are convenient and safe to
         use.
         The Plan must contain the following information:
              The site area for the storage and separation of waste is to be shown on the
              plan drawings accompanying the application
              A waste management table as indicated below is to be completed showing how
              waste material is to be segregated - recycled – reused or disposed.
              Table – Waste Management Table
         MATERIALS ON-SITE                                 DESTINATION
                                               Re-use and Recycling              Disposal
         Expected         Estimated    On-site            Off-site           *specify contractor
         waste            volume(m³)   *specify proposed  *specify           and landfill site or
         materials                     re-use or on-site  contractor and     other disposal site
                                       recycling methods recycling outlet
         Excavation
         material
         Green waste
         Bricks
         Concrete
         Timber-please
         specify
         Plasterboard
         Metals -
         please specify
         Asbestos
         Other - please
         specify
         Note * If a demolition contractor is undertaking works, then the Waste Management
         table is to be completed by the demolition contractor.
         Waste Storage & Disposal
   21.   The developer must provide waste storage and disposal facilities in accordance with
         Planning Scheme Policy 9, Waste Management, including an external imperviously
         paved area correctly sized for all refuse and recycling containers and suitably
         screened from public places and neighbouring properties.
   22.   Waste collection services are limited to between 6.30am and 6.30pm Monday to
         Saturday and not permitted on Sunday or public holidays.




                                                                                   Page 6 of 55

Section 7

GENERAL COMMITTEE MEETING AGENDA                                            15 OCTOBER 2018


         Outdoor Lighting Devices
   23.   Lighting associated with the use must be designed, sited, installed and tested to
         comply with Table 2.1 & 2.2 of Australian Standard AS4282-1997 “Control of the
         obtrusive effects of outdoor lighting” using a control level of 1.
   24.   Certification must be submitted to Council from a qualified person which certifies that
         all outdoor lighting devices comply with the requirements of this Decision Notice at
         the time of commissioning.
         For the purpose of certifying outdoor lighting devices for the development, a qualified
         person is:
               a Registered Professional Engineer of Queensland;
               an environmental or electrical design consultant with a minimum of 3 years
               current experience in the field of outdoor lighting.
         LANDSCAPING
   25.   The development site must be landscaped in accordance with Planning Scheme
         Policy PSP 3 – Landscaping Plants and Guidelines and an Operational Works
         approval and must include local native species and in particular:
               any boundary fencing must be setback a minimum of 1m from the boundary
               and/or covenant areas. The area of land between the boundary or covenant
               areas and the fence must be densely landscaped to screen the fence from the
               street. The landscaped area must include 1 feature tree every 3m;
               dense landscaping must be provided along the southern boundary to effectively
               screen the development from the adjoining residential dwellings;
               dense landscaping must be planted for the full frontage of Val Crescent to
               screen the development. The plantings must include a mix of low, medium and
               tall shrubs and trees and in particular;
               i.   include 12 x 100 litre native tree species along the Val Crescent frontage
                    between the driveway and the southern boundary of the site. Proposed
                    species must be submitted for operational works approval;
               shrubs and trees along the Goodchap Street frontage must have a minimum
               pot size of 200mm and must include 5 feature trees with a pot size of 100 litres;
               2 x 100 litre feature trees planted in each garden located near the building
               either side of the porte cochere. The tree species chosen must have a mature
               height of 8m or more;
                provision of 1 street tree with a pot size of 100 litres for every 8 metres of
               frontage;
               provide a survey plan prepared by a suitably qualified person which identifies
               the mature trees on site and their possible retention in particular the trees near
               the site boundaries;
               the large eucalypt tree near the proposed driveway in Val Crescent must be
               retained. In this regard, an arborist report outlining measures to maintain the
               health of the tree during the design, construction and operational phase of the
               development must be submitted for operational works approval;
               any vegetated water quality treatment system must be located to allow for
               landscape screening of the development.




                                                                                   Page 7 of 55

Section 8

GENERAL COMMITTEE MEETING AGENDA                                             15 OCTOBER 2018


         ENGINEERING
         External Works
   26.   Goodchap Street and Val Crescent must be upgraded for the length of their frontage
         to the subject site. The works must be undertaken in accordance with an Operational
         Works approval and must include in particular:
               reconstruction of any damaged kerb and channelling;
               construction of pedestrian footpaths in accordance with the conditions of this
               Decision Notice;
               removal of the existing property accesses and reinstatement of the kerb,
               footpath and verge area to match the balance of the site frontage, including the
               provision of topsoil and turf where the existing verge is grassed;
               relocation/reinstatement of existing on-street parking bays required as a result
               of development works;
               linemarking for any potential additional on street parking spaces.
         This Condition is imposed pursuant to s145 of the Planning Act 2016 being non-trunk
         infrastructure and s128 being necessary trunk infrastructure identified by Council’s
         LGIP to service the development.
   27.   The existing formation in Val Crescent must be upgraded from the existing formation
         in Goodchap Street and extending to the tangent point in the kerb line adjacent to the
         northern boundary of No 3 Val Crescent. The works must be undertaken in
         accordance with an Operational Works approval and must include but not be limited
         to:
               works designed and constructed in accordance with Council’s Planning
               Scheme Policy PSP 5 – Engineering Design Standards – Roads, Drainage and
               Earthworks (section 3.19(d) – Industrial/Commercial – Local road);
               the full width of the formation in Val Crescent;
               reinstatement of existing linemarking.
         This Condition is imposed pursuant to s145 of the Planning Act 2016 being non-trunk
         infrastructure.
         Bus Stop relocation
   28.   The bus stop and associated infrastructure must be relocated in accordance with
         Translink’s requirements. These works must also include the installation of a new
         shelter in accordance with Council’s standard drawings. In this regard please note
         that Council has a contract with a 3rd party to manufacture and install bus shelters.
         The developer must:
               carryout adjustment works to the kerb line and/or road linemarking along the
               new bus stop bay as necessary to achieve compliance with the applicable
               standards for cycle lanes requirements. The works must be included as part of
               the Operational Works application.
               liaise with the bus shelter manufacturer/installer and create all necessary
               conditions for their works (i.e. concrete slab, etc.);
               advise Council of timing for the installation of the bus shelter and report as soon
               as possible any changes to the programme.
         This condition is imposed pursuant to s145 of the Planning Act 2016 being non-trunk
         infrastructure. The relocation of the bus stop is only to facilitate the development and
         therefore no offset of the Infrastructure Charges is applicable.


                                                                                    Page 8 of 55

Section 9

GENERAL COMMITTEE MEETING AGENDA                                            15 OCTOBER 2018


   29.   Written approval from Translink’s Temporary Closures Team must be provided as
         part of the Operational Works application, confirming that the application for impact to
         the public transport bus network has been accepted and complies with DTMR’s
         “Industry Guideline: A guide to managing public transport impacts”.
         Site Access and Driveways
   30.   Sealed access driveways must be provided from Goodchap Street and Val Crescent
         to all parking and manoeuvring areas of the development. The works must be
         undertaken in accordance with an Operational Works approval and must include in
         particular:
               driveway crossovers generally in accordance with Council’s standard drawing
               RS-051
               suitable safety measures, including warning signage, to improve driver
               awareness of pedestrians and enhance pedestrian safety. Warning signage
               must be provided near the exit driveways to warn motorists of pedestrian
               movement along the frontage street
         Car Parking
   31.   A minimum of 53 car parking spaces must be provided and marked on the site and
         made available and accessible at all times while the use is open for business. The
         works must be undertaken in accordance with an Operational Works approval and
         must include in particular:
               53 visitor and staff parking spaces within the total, which are clearly marked for
               that purpose and accessible at all times for visitor use
               1 disabled parking space within the total
               1 space for an emergency vehicle
               crossfalls, dimensions and gradients in accordance with Australian Standard
               AS2890: Parking Facilities
   32.   All car parking areas and access driveways must be maintained exclusively for
         vehicle parking and manoeuvring and kept in a tidy and safe condition at all times.
   33.   Directional signage must be provided to direct visitors and customers to the car
         parking spaces provided on site.
         Paving Treatment of Vehicle Movement Areas
   34.   Alternative materials, patterns, or threshold treatments must be used to articulate the
         pavement treatment of vehicle movement areas.
         Service Vehicles
   35.   Service vehicle parking, manoeuvring and standing spaces must be provided on the
         site. The works must be undertaken in accordance with an Operational Works
         approval.
         Pedestrian and Bicycle Facilities
   36.   Pedestrian and bicycle facilities must be provided for the development. The works
         must be undertaken in accordance with an Operational Works approval and must
         include in particular:
               a 2.0 metre wide concrete footpath within the road verge for the entire length of
               the site’s frontage to Goodchap Street including a new pram ramp at the
               intersection with Val Crescent




                                                                                   Page 9 of 55

Section 10

GENERAL COMMITTEE MEETING AGENDA                                          15 OCTOBER 2018


              a 1.5 metre wide concrete footpath within the road verge for the entire length of
              the site’s frontage to Val Crescent. This path must be widened to 1.8m where
              not constrained by services or vegetation in the road reserve.
              adequate separation of all specific pedestrian routes from vehicle access and
              manoeuvring areas, and clear demarcation by pavement marking, signposts or
              changes in surface materials or levels
              signage and lighting at strategic locations to direct people to building entries
              and public toilet facilities
              A pram crossing at the southern end of the path in Val Crescent
              Joining smoothly to existing paths, services and verge areas
              10 bicycle spaces provided in accordance with AS2890.3 Bicycle Parking
              Facilities; and AUSTROADS Guide to Traffic Engineering Practice, Part 14 –
              Bicycles, Section 10.
              end of trip facilities of one locker per two bicycle space and one shower cubicle
              with ancillary change room per 10 bicycle spaces or part thereof.
         Condition a is imposed pursuant to s128 of the Planning Act 2016 being necessary
         trunk infrastructure identified by Council’s LGIP to service the development.
         Condition b is imposed pursuant to s145 of the Planning Act 2016 being non-trunk
         infrastructure.
         Stormwater Drainage
   37.   The site must be provided with a stormwater drainage system connecting to a lawful
         point of discharge. The works must be undertaken in accordance with an Operational
         Works approval that is issued only where the Operational Works application
         demonstrates the following in particular:
              Stormwater quantity managed as described in section 4 of the Site Based
              Stormwater Management Plan for Knowles Group Proposed Aged Care Facility
              at Goodchap Street by Empire Engineering Revision B dated 3 May 2018, with
              the exception of the following:
              i.    a stormwater quality treatment system designed in accordance with a
                    MUSIC model prepared in accordance with the Water By Design
                    Guidelines which demonstrates that pollutant reduction targets of 90%
                    reduction in Gross Pollutants, 80% reduction in Total Suspended Solids,
                    60% reduction in Total Phosphorous and 45% reduction in Total Nitrogen
                    can be achieved.
              ii.   To satisfy Section 4.8 of the MUSIC modelling Guidelines, the nodes
                    provided in the MUSIC model for any proprietary stormwater quality
                    treatment device must be verified by Stormwater Australia as achieving
                    the pollutant reduction and design parameters attributed to the node
                    included in the MUSIC model. Where Stormwater Australia is unable to
                    endorse the node for the proprietary stormwater quality treatment device,
                    the industry accepted bioretention basin node must be provided in the
                    MUSIC model, and redesign of landscaping layout to incorporate any
                    required bio retention device must be provided.




                                                                                Page 10 of 55

Section 11

GENERAL COMMITTEE MEETING AGENDA                                            15 OCTOBER 2018


   38.   All vegetated stormwater quality treatment devices must be:
              designed consistent with the Bioretention Technical Design Guidelines (Water
              by Design, 2012); and
              maintained in accordance with the Water by Design (2009) - Maintaining
              Vegetated Stormwater Assets (Version 1). A copy of this document must be
              retained on the site together with the approved Operational Works drawings for
              the stormwater quality treatment system and a detailed life cycle costing of the
              system attached as an addendum. Records of all maintenance activities
              undertaken must be kept and made available to Council upon request.
   39.   Any proprietary stormwater quality treatment devices must be routinely checked,
         serviced and cleaned in accordance with the manufacturer’s recommendations.
         Records of all maintenance activities undertaken must be kept and made available to
         Council upon request. Where replacement cartridges or other necessary components
         for the system become unavailable, an alternative system is required to be retrofitted
         into the development to achieve an equivalent pollutant reduction outcome.
   40.   Any Site Operator Management Strategy must include the Water by Design (2009) –
         Maintaining Vegetated Stormwater Assets (Version 1) document and/or maintenance
         manual for the proprietary device as appropriate and must include the full cost of
         maintaining the system in accordance with that document.
   41.   Where proprietary devices are endorsed as part of the Operational Works Approval, a
         copy of a signed supply agreement between the body corporate/site operator and the
         stormwater filtration system supplier for the maintenance of the proprietary devices
         must be provided to Council prior to the pre-start meeting for the development. The
         supply agreement must be for at least 10 years.
         Acid Sulfate Soils
   42.   All works must be carried out in accordance with an Acid Sulfate Soil and
         Groundwater Management Plan for the development prepared by a qualified person*
         and provided in the application for the Development Permit for Operational Works.
   43.   All waters, including stormwater runoff, groundwater seepage and leachate from acid
         sulfate soils must achieve the following quality prior to release from the site:
              a pH range of 6.5-8.5 pH units;
              50mg/L maximum total suspended solids concentration;
              0.3mg/L maximum total iron concentration;
              0.2mg/L maximum total aluminium concentration;
              no visible plume at either the point of release from the site or within a waterway.
   44.   The basement must be designed and constructed as a water excluding structure in
         accordance with Australian Standard AS3735 “Concrete Structures for Retaining
         Liquids” to ensure groundwater does not enter the basement after construction is
         completed.
   45.   All treated material must undergo verification undertaken by a qualified person* using
         the SPOCAS or Chromium Reducible Sulphur testing suite, and the results must be
         submitted to Council for appraisal.
   46.   The application for Operational Works must demonstrate that continual dewatering of
         groundwater’s will not occur as a result of groundwater movement along any bedding
         material associated with pipes and around the basement of the development.




                                                                                  Page 11 of 55

Section 12

GENERAL COMMITTEE MEETING AGENDA                                            15 OCTOBER 2018


         Electricity and Telecommunication Services
   47.   Unless otherwise stipulated by telecommunications legislation at the time of
         construction, the development must be provided with all necessary conduits, pits and
         pipes to accommodate the future connection of optic fibre technology
         telecommunications.
   48.   Certification must be submitted to Council from all relevant service providers which
         certifies that the development has met the requirements of this Decision Notice and
         all applicable legislation at the time of construction.
         Easements/Covenants
   49.   Unless otherwise agreed in writing by the relevant service provider, any public or third
         party infrastructure located on the subject site must be placed within an easement
         registered against the title of the property.
   50.   All easements must be designed in accordance with the planning scheme and
         granted at no cost to the Grantee. Where the Grantee is Council or a service
         authority, the easement documentation must be in accordance with the Grantee’s
         standard easement terms. Draft easement documentation must be submitted to
         Council for endorsement.
   51.   All works must be kept clear of any existing or proposed easements on the subject
         land, unless agreed otherwise in writing by the Grantee.
   52.   Covenants for the preservation of sight lines distances must be created at the
         intersection of Goodchap Street and Val Crescent and at the bend in Val Crescent.
         The covenant areas must be generally in accordance with the QTraffic plan SK.01A
         in the report dated 3 August 2018, and as modified in red by Council in the reference
         documents. The covenant must be in favour of Council and the terms must include
         but not be limited to:
               No structures or fencing
               No landscaping other than grasses, excluding the existing gum tree
               The areas to be maintained at all times by the property owner.
         Earthworks and Retaining Walls
   53.   All earthworks and associated batters must be undertaken in accordance with an
         Operational Works approval, and contained entirely within the subject site (both
         above and below ground) unless written permission from the respective landowner(s)
         is provided to Council.
   54.   All retaining walls must be designed and constructed in accordance with the planning
         scheme and must be certified by an RPEQ where exceeding 1.0m in height. All
         retaining walls that are publicly accessible and exceed 1.0m in height must be fitted
         with a commercial grade safety fence.
         Preparation of a Preliminary Construction Management Plan
   55.   A preliminary Construction Management Plan must be submitted with the Operational
         Works application and must address the following:
               traffic management during all aspects of the construction phase including:
               i.    a Traffic Management Control Plan in accordance with the Manual of
                     Uniform Traffic Control Devices (MUTCD) detailing all temporary signage
                     and traffic control measures prior to construction
               ii.   maintenance of safe pedestrian access for the areas affected by the
                     works during and after daily construction has ceased


                                                                                  Page 12 of 55

Section 13

GENERAL COMMITTEE MEETING AGENDA                                               15 OCTOBER 2018


                 iii.   proposed fencing to the site during the construction phase of the
                        development
                 iv.    approval of the Traffic Management Control Plan by the Department of
                        Transport and Main Roads (DTMR) for any works on State controlled
                        roads
                 v.     provision for worker car parking
                 maintenance and protection of water quality and existing drainage lines through
                 the construction site, through the implementation of appropriate erosion and
                 sediment control measures
                 works programme identifying key components of the works and their respective
                 durations
                 establishment of a communication protocol with the general public, adjoining
                 owners, emergency services and local businesses to advise of agreed
                 construction times, impacts on traffic, services and other relevant issues
                 identification of complaint management procedures including:
                 i.     contact details for the on-site manager
                 ii.    dispute resolution procedures
                 details on the location of external fill/dump sites, the haulage route, type of
                 vehicle to be utilised during filling operations and frequency of usage. NB any
                 damage to the existing road system as a result of haulage operations shall be
                 fully repaired at the applicant’s expense
                 it is acknowledged that the preliminary Construction Management Plan will be a
                 draft document requiring finalisation upon appointment of the Principal
                 Contractor employed to construct the works and a final document will be
                 required to be submitted at the Pre-Start Meeting for the project.
           Damage to Services and Assets
     56.   Any damage caused to existing services and assets as a result of the development
           works must be repaired at no cost to the asset owner at the following times:
                 where the damage would cause a hazard to pedestrian or vehicle safety,
                 immediately; or
                 where otherwise, upon completion of the works associated with the
                 development.
     57.   Any repair work which proposes to alter the alignment or level of existing services
           and assets must first be referred to the relevant service authority for approval
B.   Find the following are sufficient grounds to justify the decision despite the conflict with the
     Planning Scheme:
     1.    There is a significant need for aged care facilities within the Noosa region and the
           proposal will in part satisfy this need.
     2.    The use is compatible with surrounding residential uses and will not significantly
           impact on the amenity of the area. Further conditions are proposed to mitigate and
           address any potential amenity impacts.
     3.    The proposal being low rise and articulated with a variety of external finishes will sit
           reasonably well within the streetscape without being overly dominant.
     4.    The proposal provides extensive landscaping to the Val Crescent frontage to screen
           the development from the street.


                                                                                     Page 13 of 55

Section 14

GENERAL COMMITTEE MEETING AGENDA                                                   15 OCTOBER 2018


      5.     There are limited opportunities of appropriately zoned land for the development of
             aged care facilities and overall the proposal is a good response for this site,
             considering the Noosa Hospital opposite and Goodchap Street medical centre
             nearby.
      6.     The applicant has demonstrated that vehicles can enter and exit the Val Crescent
             driveway safely.
      7.     The development will not adversely affect the broader road network.
C.    Note the report is provided in accordance with Section 63(5) of the Planning Act 2016.


REPORT
This report has been prepared in response to questions raised at the Planning and Environment
Committee Meeting held on 9 October 2018 regarding:
    Further information on the availability of land available for aged care facilities;
    Provide more detailed comments in the table which addresses the matters raised by
      submitters;
    Concerns were raised in regard to the length of the parapet fronting Goodchap Street near
      the porte cochere;
    Clarification on the areas of the roof where the development is proposed higher than 8m
      above the natural ground level;
    Whether specific provisions are required for mobility scooters?
    Officers raised that changes are required to some conditions to ensure the reference to the
      Planning Act 2016 section is correct in respect to non-trunk and trunk infrastructure to
      clarify that no offset is applicable for relocating the bus stop.
Land Availability
In Noosa Shire there is approximately 130ha of vacant zoned land for unit development and
where aged care development is identified as a consistent use. While this quantity appears
sufficient the land is scattered throughout the Shire in individual small lots suitable only for a
duplex or small scale unit developments.
The new Noosa Plan has been informed by the Briggs and Mortar Housing needs analysis and
has identified an additional large lot considered suitable for aged care.
Submitter concerns
The following table is provided in the original Officers report to the Planning and Environment
Committee Meeting held on 9 October 2018 with further comment on the matters raised by
submitters provided as track changes.

 Matters Raised                                  Comments
 Traffic / Car parking
 It is already a struggle to get a car park on   The car parking proposed has been independently peer
 Goodchap Street and Val Crescent as a result    reviewed which indicates 53 spaces is sufficient for the
 of overflow parking from the hospital.          intended use.
 The extra traffic caused by the development     The effect of the development on the road network has
 will impinge on ambulance access to Noosa       been deemed to be insignificant. This has been certified
 Hospital Emergency.                             by a RPEQ traffic engineer and peer reviewed by
 The development will significantly increase     Council’s consultant traffic engineer.
 vehicles using Val Crescent, particularly       Additional vehicles to that which currently use Val Cr
 commercial vehicles including 12.5m heavy       would increase. However, the proposed driveway is
 rigid vehicles.                                 located 20m from Val Cr/Goodchap St roundabout

                                                                                        Page 14 of 55

Section 15

GENERAL COMMITTEE MEETING AGENDA                                                      15 OCTOBER 2018


Matters Raised                                      Comments
Val Crescent is intended to service residents       minimising the traffic impacts on Val Cr.
who live in the street only.                        The current width has been deemed suitable for the
Val Crescent should be widened to cater for         development.
the additional traffic if the development is to
proceed.
The proposed 53 car parks is not sufficient to      The car parking numbers         proposed    have   been
cater for patients, staff, visitors and other       independently peer reviewed.
people required to attend the facility.
Number 2 Val Crescent’s driveway is not             The location of 2 Val Cr driveway and the impact of the
indicated on the developer’s plans. This            development has been considered in the assessment of
driveway is within 10m of the proposed              the development. The driveway is unlikely to be
driveway.                                           impacted by vehicles entering and existing the proposed
                                                    development driveway in Val Crescent.
The increased traffic created by the
development will make Val Crescent more
dangerous given—
 there are no footpaths for local residents or A footpath to the whole Val Cr frontage of the
    for people who park in the street to access     development must be constructed should the
    the hospital;                                   development be approved.
                                                    The proposed driveway to the development in Val Cr is
 children ride bikes and scooters on the          near the Goodchap St roundabout. minimising the traffic
    street and the increased traffic will prevent   impacts on Val Cr.
    them from doing this safely.
The Val Crescent access is inappropriate and        The applicant has demonstrated the Val Crescent
unsafe because of restricted sight lines and        access is safe when a covenant is provided that restricts
the applicant’s information response is grossly     vegetation and structures in the area which is required
inaccurate.                                         for sightlines. An RPEQ has certified the sight lines
                                                    comply with the relevant standards.
                                                    The sight lines and other traffic related concerns raised
                                                    by the submitter are addressed in the body of this
                                                    report.
Additional rubbish collection adding to noise       This has been addressed in the body of this report. It is
and stress levels                                   likely 1 additional collection would be required. Plastic
                                                    low noise1100litre bins would be used which are
                                                    specifically designed for noise sensitive areas.
                                                    Collection times are during the day minimising impacts
                                                    on the surrounding area. This has been discussed
                                                    further in Section 3.3.1 of this report under the Waste
                                                    heading.
During construction
The development will create noise and disrupt       Noise is unavoidable during any construction. Should
amenity during the construction phase.              the development be approved a construction
The construction phase is an enormous impost        management plan and other relevant documents would
on Val crescent over a substantial period of        be required as part of the operational works application
time and one we should not have to tolerate.        and therefore construction impacts would be minimised.
Excavation for the basement raises stability        Should the development be approved, conditions would
concerns and will probably result in pumps          address the stability of the site during construction.
working all the time and over-taxing the storm
water drainage system and adding to sediment
levels in Lake Doonella.




                                                                                            Page 15 of 55

Section 16

GENERAL COMMITTEE MEETING AGENDA                                                        15 OCTOBER 2018


Matters Raised                                       Comments
The Val Crescent road surface is not suitable        If approved this would be addressed as part of the
for heavy construction traffic. Construction of      operational works application. Any damage to the road
this scale will require large articulated delivery   is the responsibility of the developer. If approved,
vehicles and raises safety issues with the           Council would require a substantial bond of $50,000 to
Goodchap Street / Val Crescent roundabout.           ensure compliance with conditions of any approval.
Property Value
Devaluation of Val Crescent properties.              This is not a planning matter.
Built form
The proposal conflicts with the Noosa Plan.          This is addressed in the body of the report. The
No expectation a 90 bed aged care facility           Planning Act 2016 allows planning applications to be
would be built in Val Crescent given that it is      lodged with Local Government whether or not the use is
zoned for Detached Housing. The expectation          consistent in the subject zone. The report concludes
is 11 dwellings over 11 lots.                        there is a significant need for aged care facilities which
                                                     in part justifies the conflict with the Planning Scheme.
A 90 bed aged care is an overdevelopment of
the site. It is a high density commercial            While a large scale building, the proposal is well
development in a residential area with service       designed and unlikely to significantly dominate the
levels equal to a commercial development.            surrounding area.
                                                     It is a quiet residential use and the impacts of the
                                                     commercial aspects on Val Crescent have been
                                                     minimised. This has been addressed further in Section
                                                     3.3 of this report.
The size, mass and bulk dominates the                This is addressed in the body of the report. It is agreed
streetscape and is a significant departure from      the proposal does not present as 11 detached houses.
The Noosa Plan and will look out of place on         To address the size, mass and bulk, the building is low
the site which is characterised by detached          rise, articulated, uses a variety of external finishes, and
houses.                                              proposes significant landscaping and generous
The proposal does not give the physical              setbacks.
appearance of detached houses and change             Generally individual dwellings would be constructed
the nature of Val Crescent where there is no         within the subject zone. However, it should be noted that
units or other multiple dwellings.                   a large detached house could be constructed over
                                                     multiple lots resulting in a greater scale of development
                                                     which may not trigger a planning application to Council.
                                                     This is addressed in the body of the report.
The proposed ‘cookie cutter’ unit style doesn’t      This is addressed in the body of the report. The
fit the Noosa style of development.                  proposed design is considered ‘Noosa Style’ with the
                                                     built form articulated, providing eaves and a mix of
                                                     external material finishes to add interest.
Insulted by the impressive circular driveway on      The development provides variation and articulation in
Goodchap Street whilst the ugly commercial           design and the ‘commercial access’ and associated
access is located in Val Crescent, subjecting        delivery area is below road level with good landscaping
local residents to noise and congestion.             screening the development from the street.
Ambient light from the development will              A condition has been proposed to could ensure no
change the night time amenity of Val Crescent.       negative impact from light spill.
Rooms and balconies overlooking our yards            The development is setback 3.2m from the adjoining
and walkways and courtyards along the fence          residential uses with no windows to these areas of the
line creating major privacy concerns.                building except for a small balcony and windows
                                                     setback 18m. The courtyard is likely to be at or slightly
                                                     below natural ground level and should not create any
                                                     overlooking. A condition has been proposed to could be
                                                     imposed to provide screening devices to ensure privacy.




                                                                                              Page 16 of 55

Section 17

GENERAL COMMITTEE MEETING AGENDA                                                    15 OCTOBER 2018


Matters Raised                                   Comments
Location
The aged care facility should be located on a    This is addressed within the body of this report. Noosa
more appropriately zoned lot.                    Shire has a shortage of appropriately zoned land for
                                                 aged car facilities which is highlighted in the Housing
                                                 Needs Assessment (HNA), prepared by Briggs and
                                                 Mortar dated April 2017. The HNA was prepared to
                                                 inform the for the Noosa Council’s new Planning
                                                 Scheme.
Need
There is enough aged care beds in Noosa          The matter is addressed in the body of this report. The
Shire considering the population ceiling cap.    HNA indicates a shortfall of 214 beds by 2021 and 289
                                                 beds by 2036. This is further discussed in Section 3.3 of
                                                 this report under the Need and Demand heading.
Stormwater/Wastewater
A large volume of sewage and grey water          Unitywater would address this aspect of development.
output.                                          Stormwater has been demonstrated to comply with the
                                                 Planning Scheme, relevant policies and standards.
Vegetation
Removal 40 mature trees across the 11 lots       Not all of the mature trees are native species. The large
negatively impacts on the character of Val       mature eucalypt located to the north western end of Val
Crescent. If 11 new detached houses were         Crescent is proposed to be retained. A condition could
constructed the vast majority of these trees     is proposed be included to explore the opportunity to
would be retained.                               retain mature trees. This is likely to occur only along the
                                                 Val Crescent frontage. If the development is approved,
                                                 100 litre pot size trees could is proposed to be
                                                 conditioned.
                                                 Were If 11 new detached houses were to be constructed
                                                 it is unlikely that the vast majority of the trees would be
                                                 retained.
A commercial café appears to be operating        The café is ancillary to the proposed use and is not
from the Peregian Springs Arcare facility. The   proposed for external use. It is proposed to be utilised
proposal plans show a café area but is not       by residents, residents’ visitors and staff. A condition is
mentioned in the applicant’s application         recommended to ensure the café is not a commercial
documentation.                                   activity.
Some of the properties to be removed are         The lower cost properties appear to be in a state of
lower cost rentals. Removal of these seems       disrepair being the reason they are potentially low cost
contradictory to the current requirement for     rentals. There is a need for both low cost
more low cost rental properties.                 accommodation and aged care beds in Noosa Shire.




                                                                                          Page 17 of 55

Section 18

GENERAL COMMITTEE MEETING AGENDA                                                 15 OCTOBER 2018


Parapet facing Goodchap Street
Concerns were raised suggesting the 30m long parapet presents a commercial architectural
aspect to the development. The Planning Scheme requires eaves to 75% of the perimeter of the
building. The proposal meets this provision with more than 90% eaves to the perimeter. The wall
below the parapet incorporates glazing and some timber structures with horizontal battening (for
a vine) each side of the porte cochere which provides interest to the facade.
A condition may be imposed to provide window hoods or similar but it is considered this would
compromise the overall design. An additional feature tree could be planted each side of the porte
cochere roof to assist in visually softening this facade. There also appears the opportunity to
articulate the parapet above the porte cochere roof. It is considered the additional landscaping
and further articulation addresses any commercial architectural aspect of the development.
Proposed conditions 10 and 25 are recommended to be changed to read as follows:
Condition 10
10.   External finishes must consist of a mix of materials in accordance with the approved plans.
      The parapet facing Goodchap Street must be articulated to break up its length and present
      a more domestic scale and appearance.
Condition 25
25.   The development site must be landscaped in accordance with Planning Scheme Policy
      PSP 3 – Landscaping Plants and Guidelines and an Operational Works approval and must
      include in particular:
           any boundary fencing must be setback a minimum of 1m from the boundary and/or
           covenant areas. The area of land between the boundary or covenant areas and the
           fence must be densely landscaped to screen the fence from the street. The
           landscaped area must include 1 feature tree every 3m;
           dense landscaping must be provided along the southern boundary to effectively
           screen the development from the adjoining residential dwellings;
           dense landscaping must be planted for the full frontage of Val Crescent to screen the
           development. The plantings must include a mix of low, medium and tall shrubs and
           trees and in particular;
           i.    include 12 x 100 litre native tree species along the Val Crescent frontage
                 between the driveway and the southern boundary of the site. Proposed species
                 must be submitted for operational works approval;
           shrubs and trees along the Goodchap Street frontage must have a minimum pot size
           of 200mm and must include 5 feature trees with a pot size of 100 litres
           12 x 100 litre feature trees planted in each garden located near the building each
           either side of the porte cochere. The tree species chosen must have a mature height
           of 8m or more;
           provision of 1 street tree with a pot size of 100 litres for every 8 metres of frontage
           provide a survey plan prepared by a suitably qualified person which identifies the
           mature trees on site and their possible retention in particular the trees near the site
           boundaries.
           the large eucalypt tree near the proposed driveway in Val Crescent must be retained.
           In this regard, an arborist report outlining measures to maintain the health of the tree
           during the design, construction and operational phase of the development must be
           submitted for operational works approval
           any vegetated water quality treatment system must be located to allow for landscape
           screening of the development.


                                                                                      Page 18 of 55

Section 19

GENERAL COMMITTEE MEETING AGENDA                                                 15 OCTOBER 2018


Building height in metres
Figure 1 below shows the areas where the development exceeds 8 metres above the natural
ground level.




                                 Figure 1 – Areas of roof exceeding 8m
The lift overruns are centrally located and there are likely to be only limited views of these from
the surrounding area.
There is an opportunity for the northern part of the roof which is proposed at 8 degrees to be
reduced in height by reducing the roof pitch to 5 degrees. It is considered this is not necessary as
the height encroachment is minor and would not cause any impacts to the surrounding area and
has arisen due to the slope to some extent. The roof areas are unlikely to be seen from the street
because of the topography and their location except for an area to the west side of the roof which
may be seen but would be partially screened by trees within the generous landscaped setbacks.
Overall it is considered the areas that exceed 8m are minor, will not cause any impacts on the
streetscape nor create shading or overlooking of surrounding properties and assist to further
articulate the building.


Mobility scooters
The applicant advises that not many residents are expected to have mobility scooters. The
mobility scooters are typically stored in equipment stores or out of the way in the basement. It is
envisaged, if necessary, 2 - 4 mobility scooters could occupy 1 car space. The proposal plans
also indicate a Photovoltaic and battery storage system which could sustainably charge any
mobility scooters. It is pertinent to note that 20 of the 90 beds are for sensitive care residents who
are unlikely to be mobile.




                                                                                      Page 19 of 55

Section 20

GENERAL COMMITTEE MEETING AGENDA                                                15 OCTOBER 2018


Infrastructure Charges
Conditions 26, 27, 28 and 38 require amendments to ensure the conditions are consistent with
the Planning Act 2016. The proposed amendments also seek to clarify that the cost of the bus
stop relocation is not off settable against the charges as the bus stop is required to be relocated
by the applicant as a result of the development. The amendments to the conditions are track
changed below.
26.   Goodchap Street and Val Crescent must be upgraded for the length of their frontage to the
      subject site. The works must be undertaken in accordance with an Operational Works
      approval and must include in particular:
           reconstruction of any damaged kerb and channelling;
           construction of pedestrian footpaths in accordance with the conditions of this
           Decision Notice;
           removal of the existing property accesses and reinstatement of the kerb, footpath and
           verge area to match the balance of the site frontage, including the provision of topsoil
           and turf where the existing verge is grassed;
           relocation/reinstatement of existing on-street parking bays required as a result of
           development works;
           linemarking for any potential additional on street parking spaces.
      This Condition is imposed pursuant to s665 s145 of the Planning Act 2016 being non-trunk
      infrastructure and s646 s128 being necessary trunk infrastructure identified by Council’s
      LGIP to service the development.
27.   The existing formation in Val Crescent must be upgraded from the existing formation in
      Goodchap Street and extending to the tangent point in the kerb line adjacent to the
      northern boundary of No 3 Val Crescent. The works must be undertaken in accordance
      with an Operational Works approval and must include but not be limited to:
           works designed and constructed in accordance with Council’s Planning Scheme
           Policy PSP 5 – Engineering Design Standards – Roads, Drainage and Earthworks
           (section 3.19(d) – Industrial/Commercial – Local road);
           the full width of the formation in Val Crescent;
           reinstatement of existing linemarking.
      This Condition is imposed pursuant to s665 s145 of the Planning Act 2016 being non-trunk
      infrastructure and s646 being necessary trunk infrastructure identified by Council’s LGIP to
      service the development.
      Bus Stop relocation
28.   The bus stop and associated infrastructure must be relocated in accordance with
      Translink’s requirements. These works must also include the installation of a new shelter in
      accordance with Council’s standard drawings. In this regard please note that Council has a
      contract with a 3rd party to manufacture and install bus shelters. The developer must:
            carryout adjustment works to the kerb line and/or road linemarking along the new
           bus stop bay as necessary to achieve compliance with the applicable standards for
           cycle lanes requirements. The works must be included as part of the Operational
           Works application.
           liaise with the bus shelter manufacturer/installer and create all necessary conditions
           for their works (i.e. concrete slab, etc.);
           advise Council of timing for the installation of the bus shelter and report as soon as
           possible any changes to the programme.


                                                                                    Page 20 of 55

Section 21

GENERAL COMMITTEE MEETING AGENDA                                                    15 OCTOBER 2018


        This condition is imposed pursuant to s646 s145 of the Planning Act 2016 being necessary
        trunknon-trunk infrastructure. The relocation of the bus stop is only to facilitate the
        development and therefore no offset of the Infrastructure Charges is applicable.
        infrastructure identified by Council’s LGIP to service the development.
        This condition is imposed pursuant to s145 of the Planning Act 2016 being non-trunk
        infrastructure. The relocation of the bus stop is only to facilitate the development and
        therefore no offset of the Infrastructure Charges is applicable.
36.     Pedestrian and bicycle facilities must be provided for the development. The works must be
        undertaken in accordance with an Operational Works approval and must include in
        particular:
               a 2.0 metre wide concrete footpath within the road verge for the entire length of the
               site’s frontage to Goodchap Street including a new pram ramp at the intersection with
               Val Crescent
               a 1.5 metre wide concrete footpath within the road verge for the entire length of the
               site’s frontage to Val Crescent. This path must be widened to 1.8m where not
               constrained by services or vegetation in the road reserve
               adequate separation of all specific pedestrian routes from vehicle access and
               manoeuvring areas, and clear demarcation by pavement marking, signposts or
               changes in surface materials or levels
               signage and lighting at strategic locations to direct people to building entries and
               public toilet facilities
               a pram crossing at the southern end of the path in Val Crescent
               joining smoothly to existing paths, services and verge areas
               10 bicycle spaces provided in accordance with AS2890.3 Bicycle Parking Facilities;
               and AUSTROADS Guide to Traffic Engineering Practice, Part 14 – Bicycles, Section
               10.
               end of trip facilities of one locker per two bicycle space and one shower cubicle with
               ancillary change room per 10 bicycle spaces or part thereof.
        Condition a is imposed pursuant to s646 s128 of the Planning Act 2016 being necessary
        trunk infrastructure identified by Council’s LGIP to service the development.
        Condition b is imposed pursuant to s665 s145 of the Planning Act 2016 being non-trunk
        infrastructure

Departments/Sections Consulted:

      Chief Executive Officer       Community Services                        Corporate Services
      Executive Officer             Director                                  Director
      Executive Support             Community Development                     Financial Services
                                    Community Facilities                      ICT
                                    Libraries & Galleries                     Procurement & Fleet
                                    Local Laws                                Property
                                    Waste & Environmental Health              Revenue Services

      Executive Services        X   Environment & Sustainable Development     Infrastructure Services
      Director                      Director                                  Director
      Community Engagement          Building & Plumbing Services              Asset Management
      Customer Service              Development Assessment                    Buildings and Facilities
      Governance                    Economic Development                      Civil Operations
      People and Culture            Environmental Services                    Disaster Management
                                X   Strategic Land Use Planning               Infrastructure Planning,
                                                                              Design and Delivery




                                                                                           Page 21 of 55

Section 22

GENERAL COMMITTEE MEETING AGENDA                                                             15 OCTOBER 2018


5                        MCU18/0094 - DEVELOPMENT APPLICATION FOR MATERIAL CHANGE OF USE -
                         MULTIPLE HOUSING TYPE 4 (4 DWELLING UNITS), 15 GARNET STREET, COOROY
DOCUMENT INFORM AT ION




Author                           Development Planner, Lisa Pienaar
                                 Environment and Sustainable Development Department

Index                            ECM/ Application/ MCU18/0094

Attachments                      Nil



APPLICATION DETAILS

Application No.                             MCU18/0094

Applicant                                   Whatham Boys Property Trust

Proposal                                    Material Change of Use - Multiple Housing - Type 4 Conventional

Properly Made Date                          13 June 2018

Information Request Date                    27 June 2018

Information Response Date                   23 July 2018

Decision Due Date                           23 October 2018

Number of Submissions                       1



PROPERTY DETAILS

Property Address                            15 Garnet St Cooroy Qld 4563

RP Description                              Lot 901 C 56011

Land Area                                   1,077m²

Existing Use of Land                        Detached Dwelling



STATUTORY DETAILS

SEQRP Designation                           Urban Footprint
Locality                                    Cooroy & Lake Macdonald

Zone                                        Attached Housing Zone

Overlays                                    Nil

Assessment Type                             Impact




                                                                                                  Page 22 of 55

Section 23

GENERAL COMMITTEE MEETING AGENDA                                                    15 OCTOBER 2018


EXECUTIVE SUMMARY
Not applicable.


RECOMMENDATION
That Council note the report by the Development Planner to the General Committee Meeting
dated 15 October 2018 regarding Application No. MCU18/0094 for a Development Permit for
Material Change of Use for Multiple Housing - Type 4 Conventional. (4 Dwelling Units) situated at
15 Garnet St, Cooroy and
A.   Approve with the following conditions:
     PLANNING
           When Conditions must be Complied With
     1.    Unless otherwise stated, all conditions of this Decision Notice must be complied with
           prior to the use commencing, and then compliance maintained at all times while the
           use continues.
           Approved Plans
     2.    Development undertaken in accordance with this approval must generally comply
           with the approved plans of development. The approved plans are listed in the
           following table unless otherwise amended by these conditions.
            Plan     Rev.    Plan/Document Name                                             Date
            No.
            A10      F       Ground – Site Plan, drawn by Morriarchi Architecture           3 July 2018

            A11      E       Level 1 – Roof – Site Plan, drawn by Morriarchi Architecture   3 July 2018
            A12      C       Townhouse Type A (3 bed) – Floor Plans, drawn by               3 July 2018
                             Morriarchi Architecture
            A13      C       Townhouse Type B (2 bed) – Floor Plans, drawn by               3 July 2018
                             Morriarchi Architecture
            A14      A       Landscape Plan, drawn by Morriarchi Architecture               3 July 2018
            A20      E       Elevations, drawn by Morriarchi Architecture                   3 July 2018
            A30      E       Sections, drawn by Morriarchi Architecture                     3 July 2018
            A80      E       Perspective Images, drawn by Morriarchi Architecture           3 July 2018
            SD-1     C       Landscape Concept Plan, prepared by Project Urban              18 May 2018

           Nature and Extent of Approved Use
     3.    This approval is for 1 x 3 bedroom unit and 3 x 2 bedroom units. The TV/Study room
           is not permitted to be fully enclosed for use as a bedroom.
           Building Height
     4.    The maximum height of the development must not exceed 8 metres above the
           finished ground level and the natural ground level.
           Performance Bond
     5.    Security in the form of a cash bond or trading bank guarantee to the sum of $20,000
           must be submitted to Council, to secure performance of all conditions of this
           approval, prior to pre-start meeting. The cash bond or trading bank guarantee will be
           returned on performance of the conditions of approval less any costs incurred by
           Council in respect of enforcing performance of this permit. Council reserves the right
           to call upon the bond or guaranteed sum to effect compliance with conditions.

                                                                                        Page 23 of 55

Section 24

GENERAL COMMITTEE MEETING AGENDA                                            15 OCTOBER 2018


         Street Identification
   6.    The street address of the development must be clearly visible and discernible from
         the primary frontage of the site by the provision of a street number and, where
         appropriate, the building name.
         Building Appearance
   7.    All air conditioning units or other mechanical equipment must be located at ground
         level, or otherwise fully enclosed or screened such that they are not visible from the
         street frontages nor adjoining properties.
         Fencing and Walls
   8.    Any street fencing must be set back an average of 1 metre from the front property
         boundary. Any fencing on the front boundary must either:
         a.   not exceed a maximum height of 1.2m
         b.   be of open construction.
   9.    The area of land between the fence and the front property boundary must be densely
         landscaped to screen any fencing from the street.
         Clothes Drying Areas
   10.   Each dwelling unit must be provided with access to an outdoor clothes line which is
         screened from public view.
         Protection of Privacy
   11.   To ensure privacy is protected between adjoining properties, the windows located on
         the upper western building face of the building must either:
         a.   have a minimum window sill height or 1.5 metres above floor level;
         b.   be fitted with translucent glazing;
         c.   be fitted with a fixed external screen.
   12.   Any proposed Community Management Statement required for the development
         pursuant to the Body Corporate and Community Management Act 1997 must be
         submitted to Council for endorsement at the same time as submission of the Building
         Format Plan (or similar) to Council for compliance assessment.
   13.   All clauses and by-laws of the proposed Community Management Statement must
         accord with the requirements of this Decision Notice.
         Landscaping Works
   14.   The development site must be landscaped. The works must be undertaken in
         accordance with an Operational Works approval and the Noosa Plan Planning
         Scheme Policy PSP 3 – Landscaping Plants and Guidelines and must include in
         particular:
         a.   the works shown on the approved Landscape Concept Plan using
              predominately local native species;
         b.   The provision of 6 x 100L local native street trees to the road frontages suitable
              for the location and sight lines.
   15.   All landscape works must be established and maintained in accordance with the
         approved design for the life of the development, and in a manner that ensures
         healthy, sustained and vigorous plant growth. All plant material must be allowed to
         grow to full form and be refurbished when its life expectancy is reached.
   16.   All landscape works must be maintained generally in accordance with the approved
         design for the life of the development.

                                                                                 Page 24 of 55

Section 25

GENERAL COMMITTEE MEETING AGENDA                                           15 OCTOBER 2018


   ENGINEERING
         External Works
   17.   A 2.0m wide concrete footpath must be provided within the road verge for the entire
         length of the frontage of the site to Wattle Street. The path must generally match with
         the existing grassed verge without causing a trip hazard. The works must be
         undertaken in accordance with an Operational Works approval and must
         include/address the following:
         a.   Be in compliance with IPWEAQ standard drawing SEQ R-065 Concrete
              Pathway Construction Details;
         b.   Be extended to smoothly tapered and join with the existing path along Garnet
              Street.
         Reinstatement Works
   18.   Any redundant driveway and/or kerb layback must be removed, and the kerb line and
         verge area reinstated and landscaped to match the existing kerb and/or verge
         treatments. Grassed verge areas to be reinstated must be provided with 100 mm
         topsoil and turf, and must be maintained by the developer until established.
   19.   The redundant private pathway connection within the grassed verge of Garnet Street
         must be removed, and verge area reinstated and landscaped to match the verge
         treatments.
   20.   Any badly damaged kerb and channel along the frontage of the site must be repaired
         to the reasonable satisfaction of Council’s representative.
         Site Access and Driveways
   21.   A sealed access driveway must be provided from Wattle Street to all parking and
         manoeuvring areas of the development. The works must be undertaken in
         accordance with an Operational Works approval and must include in particular:
         a.   Driveway crossovers in accordance with IPWEAQ standard drawings R-049
              and R-050 to grades prevent vehicles from scraping and/or bottoming whilst
              also allowing for compliant grades for the footpath and pedestrians movements
              along the footpath and the grassed verge without any step or trip hazard.
         Car Parking
   22.   Car parking must be provided within the site generally as shown on the approved
         plans. The works must be undertaken in accordance with an Operational Works
         approval and must be in compliance with the provisions of AS/NZS 2890.1-2004 with
         allowance for standard vehicle to enter and leave the site in a forward gear and with a
         minimum head clearance (headroom) at any point of 2.2m.
   23.   All car parking areas and access driveways must be maintained exclusively for
         vehicle parking and manoeuvring and kept in a tidy and safe condition at all times
         Stormwater Drainage
   24.   The site must be provided with a stormwater drainage system connecting to a lawful
         point/s of discharge in Garnet Street and/or Wattle Street. The works must be
         undertaken in accordance with an Operational Works approval in compliance with the
         relevant sections of Queensland Urban Drainage Manual and supported by a detailed
         stormwater drainage design prepared and certified by a suitably qualified and
         experienced Registered Professional Civil Engineer (RPEQ).
   25.   The development of the site must not worsen existing drainage conditions on other
         properties by diverting stormwater runoff or cause additional stormwater ponding on
         any other property.


                                                                                 Page 25 of 55

Section 26

GENERAL COMMITTEE MEETING AGENDA                                               15 OCTOBER 2018


     26.   Stormwater runoff from the development must be disposed of on-site without causing
           scour or damage to the subject site or any adjoining property.
           Earthworks and Retaining Walls
     27.   All earthworks must be carried out in compliance with an Operational Works
           Development Permit.
     28.   All earthworks and associated batters/retaining walls must be contained entirely
           within the subject site unless written permission from the respective landowner(s) is
           provided to Council.
     29.   All earthworks must be undertaken in accordance with the provisions of Australian
           Standard AS3798: Guidelines on Earthworks for Commercial and Residential
           Developments, Council’s codes and relevant government regulations and guidelines.
           Certification must be provided by an RPEQ and submitted to Council prior to the
           issue of the Certificate of Classification for the building.
     30.   The development works must not adversely impact on the stability of the subject site,
           any other property or private or public structure.
     31.   Earthworks and development works carried out on site must not affect the structural
           integrity of any of the existing fences or structures that border the site. Fences that
           are affected shall be replaced prior to the Building Certifier issuing the Certificate of
           Classification.
           Telecommunication Services
     32.   Unless otherwise stipulated by telecommunications legislation at the time of
           construction, the development must be provided with all necessary conduits, pits and
           pipes to accommodate the future connection of optic fibre technology
           telecommunications.
B.   Note the report is provided in accordance with Section 63(5) of the Planning Act 2016.



REPORT


1.   PROPOSAL
The application seeks a Development Permit for Material Change of Use for Multiple Housing -
Type 4 Conventional for 4 dwelling units, comprising 1 x 3 bedroom unit and 3 x 2 bedroom units.
The 2 bedroom units also have an open study/TV room on the second floor. Each unit has a
double garage with access to the site from Wattle Street. Refer to Figure 1 – Proposed units.




                                                                                    Page 26 of 55

Section 27

GENERAL COMMITTEE MEETING AGENDA   15 OCTOBER 2018




                                      Page 27 of 55

GENERAL COMMITTEE MEETING AGENDA                                        15 OCTOBER 2018

     VEHICLE                              TILE
 oe, ENTRY / EXIT &,            a    24 WA TLE STREET _ 84 45   _              a ee 4,
   plte iets OY    a          ™,             ae        2             ae       ~     a Ss,
   / iL) 5 i     VEN GUELENS     Ke              \             ™           aN    ~\N   aA
  LeTey               \         \              ‘\       +             ~-—_B,   \         Iw
        tH      ass      \         —\             \               nee         4
     ‘a . Ny   caro       \    oO       \           \, O          oe = —~—     \            W:
  %   AWN.      or   8      \  8         \             2 —— PRIVATE 8 =   ™ a    XY   a oN
   “  . at BST shoo          \\-O pawate ao |X 0      fe]  Te            $15  ™~     ee   oY \<
  * Le                3       Bas      Pos   “ROS   7| EB  oom ES        POS  oN “e, *        :
 a *4 4 ree 4 A       C STREET LANDSCAPE = 8 179°58'40" 63.657m 1 2 STREET LANDSCAPE —— 4 NX .
Tea                            5                      2         i                i tls)       8
    2                                                                 gee      |
     -      Go    pms on |     Crojneouse Oo Ea Pecos 7 om om WTtopnncusef ga      eA el
           SE ES pe ee pe ih                       cer    bit     og PP
   & Sake  ie TET Toro) fo rar “1 Co Poe      TEST Too)   rw   = a aan           >_—.         z
            ne ae                                    ee mo
    PRI     mt ALD OD | oo           FED A     FS) FI | ee         GFL)     tine:       “HF
   ot         ESAS lsc pemre | RA         el BA) LY | caer 2 | Jee a             2:
    o>     VERRAN ead pei                               SST       tf IR          :            |
    —       PU Bee IU GET                          Be oe               Ge              oN    !
.    re.     _——  = Pre OEY 1 :             a      — LCS STL :        — Jl   .        “Na. NA].
 p  KSEE                       Pre                             Pe                             k
Wc eee SR Ce IB wcee,                                                                        |
     weet    are te re gett woe Bye Mg   aa        eT           Fa gt Stet Nat .       |
 a      oat        aA   Ce “A. g: - ~ a a     VPs" we      Me  A: ee      et            \   f
    ae   - -   ————                          ANSE                          |           ot, Saag
E  T                                e;,     ‘SSRSNag" 53.654m 2            ro          +   “eee Ake
i                   sectnaseoe       y  ee       Te                       =|      — ara

  em                                                                 n°
                                                                       ace
   =<       re     TTT                                     P—\    sa   cpa    tenses] |
 i  heart tty sheighhaie A iN =                                 Ml     Shes e     — =I
 ec Saale                =                                  =          eke              |
 } |      Lea x |      —                                  —— ANI) BEDI                 Hh
 Me)    | ee                                                Pe
 yes eet                                                    ! 7 “ey Sy
 Meo       et  4     |ee2 - :                               ni       vies       AH
     she pep ee tle Sm Be” = — — |                                   oo ee
   med Ft ing” <r! Snes ale or                                  BED? Re a", rape r ENS Lame hel
 pe ot BS                 Tl                                Fe LE                  es
  Se |         ae    LT     |                               | fs Ste      PS    =)       |
 HO           MES TT |                                          eh ALS Le
 : SS     ees SeC ae                                                 PRE y HULL          A
 sl [l}                                            f                 Pe            eG)
 eS       a       ae aeons                                   Suc ta iete Fh ppt ted teases oe Hin’)
  L       PBI                                               y ae [oq STUDY ee SUL
 pas                       ||                               |      aA LT
 HT * Waa    CATE =] BED 3  5)                                  met     I NC BATH | [|
        :         :                                             = ROOM:
 r   PO                   | ||                              hese et      ee              !
    A RN ee                                                  CARERS wir:        a)       i
     JON et |                                                SN BS
      mm      _  MODI                        OO .

                                                                            Page 27 of 55

Section 28

GENERAL COMMITTEE MEETING AGENDA                     15 OCTOBER 2018




                         Figure 1 – Proposed units


                                                        Page 28 of 55

GENERAL COMMITTEE MEETING AGENDA                    15 OCTOBER 2018

———— a                         nee E ep               =   ,
v=   piano       Lael oie Mea           LT eae)           2
mt a ELEVATION
   sell TP ot                  .          ee
    gee   UPR             §        pp ST             ie
  ( : \ NORTH ELEVATION            ¢ : \ SOUTH ELEVATION
=    meee    0000001 a              peer er
    Smet                alee                  TL Tip
~~    i?                        eT a         SUR RESELL
  f : \ WEST ELEVATION
             a 10 P|          as
           ert                A a             |  Fe
           hers           I    ae   ert a ———   i riy
   ee ee ee

      unfair Se                    Bi    | The
       ee  See             pois pelts |
    bs     A ete     at yam TT ill aT — mi      F |  ea
  —                                                 eee

                        =a.
                  Thee       :    Bier   be          |
              TI     oT                Ss Ad    ail
           Ta                       fw
                         Figure 1— Proposed units
                                                        Page 28 of 55

Section 29

GENERAL COMMITTEE MEETING AGENDA                                              15 OCTOBER 2018


2.   SITE DETAILS
2.1. Site Description
The site has a lot area of 1,077m2 with a frontage of 20m to Garnet Street and 53m to Wattle
Street. Existing development consists of a detached dwelling with ancillary residential structures.
The site is generally flat with a slight fall towards Garnet Street. Refer Figure 2 – Subject site.




                                       Figure 2 - Subject site

2.2. Surrounding Land Uses
Adjoining land uses consist of multiple dwellings (conventional) to the west and a single detached
dwelling to the north. Directly to the east across Wattle Street is a 2 storey commercial
development. The site is located on the periphery of the Cooroy Town Centre.

2.3. Background
A pre-lodgement meeting was held with the applicant regarding the proposal on 20 March 2018.
Items discussed were density, stormwater and setbacks. Council officers also indicated that there
is little support for greater density on site than the maximum specified by Noosa Plan.

Previous advice was also provided to the applicant that the access preference was from Wattle
Street, being the lower order street. Additional access points on Garnet Street, being a heavy
vehicle bypass, was advised as not being desirable.

3.   ASSESSMENT
3.1. Instruments for Statutory Assessment
Under the Planning Act 2016 the application must be assessed against each of the following
statutory planning instruments to the extent they are relevant to the development:
    State Planning Policy;
   South East Queensland Regional Plan;
   Planning Regulation 2017
   The Noosa Plan.


                                                                                    Page 29 of 55

Section 30

GENERAL COMMITTEE MEETING AGENDA                                               15 OCTOBER 2018


The following codes from the Noosa Plan are applicable to this development:
    Cooroy & Lake Macdonald Locality Code;
     Residential Uses Code;
     Engineering Works Code; and
     Landscaping Code.
The subject site is located in the Cooroy & Lake Macdonald Locality and is zoned Attached
Housing. The proposed use is identified as a consistent use with the zone and is required to
follow an impact assessable application process. The proposed units are consistent with the
overall outcomes for the Attached Housing zone which seek to provide for accommodation in
predominantly attached housing forms that offer a high level of residential amenity, respect the
scale and character of the streetscape and located within convenient access to services and
facilities.
The application has been found to generally comply with all applicable statutory instruments. The
pertinent issues arising out of the assessment are discussed below:

Criteria                           Planning Scheme          Proposal                 Complies
Population density                 10.77 persons max        10.5 persons             
Gross floor area                   431m² max                384m²                    
Site cover                         40% max                  32%                      
Landscaped open space              315m² min                315m²                    
Soft landscaping                   Min 60% of total         60%                      
Building height
 storeys                         2 storeys max            2 storeys                
 metres                          8 metres                 8 metres                 
Boundary setbacks
 Front (Wattle)                  6 metres min             3.2 (pergolas) and 4.1   X
                                                            metres to wall
 Side (north)                    ½ Building Height        5.2- 5.9 metres          
 Side (west)                     ½ Building Height        6.5 metres               
                                   6 metres min             3.5-4.5 metres
 Front (Garnet)
                                                                                     X
Length of wall                     15 metres max            19 metres                X
Carparking                         4 covered min            8 covered                
                                   1 uncovered min          1 uncovered              
Roof Form                          5 degree pitch           20 degree pitch          
                                   600mm eaves to 75%       >75%                     


The proposal respects the scale and character of the Cooroy area and is well located as it
adjoins the Cooroy local centre and is close to public transport.
Access
The proposal is located on the corner of Garnet and Wattle Streets, with the development
accessing from Wattle Street. Previous discussions with the applicant indicated a preference for
access to be from Wattle Street, as this is the lower order street and additional access points on
Garnet Street, being a heavy vehicle bypass are not desirable. Garnet Street is used during the
day by vehicles over 4.5 tonne between 7am and 7pm, with heavy vehicles not permitted through
town during business hours. Outside of these hours heavy vehicles are required to use Maple
Street.


                                                                                     Page 30 of 55

Section 31

GENERAL COMMITTEE MEETING AGENDA                                                  15 OCTOBER 2018


Additional access points on a heavy vehicle bypass road are considered problematic as they
create conflict points, and this is especially applicable for this site, given the close proximity to an
intersection.
Although, Garnet Street presently does not convey large volumes of heavy traffic, the Cooroy
industrial estate, and the township has the capacity to grow into the future, resulting in more
traffic using Garnet Street.
While a large, mature mango tree will be removed to allow the access to the site from Wattle
Street, it is important to note that a mango tree, not being a native species, can be removed at
any point without Council approval, whether the site is redeveloped or not. Furthermore, Noosa
Plan does not identify mango trees as an important character tree for Cooroy. Refer to Figure 3
– Existing mango tree within the subject site




                            Figure 3 - Existing mango tree within subject site
Setbacks
The proposal seeks reduced setbacks from the Wattle and Garnet Street frontages. The full
length of the building is oriented to the Wattle Street frontage and has a 3.2 metre setback to the
pergolas/patio area associated with each unit and 4.1 metres to the wall. The southern end of the
building fronts Garnet Street where a setback of 3.5 metres applies for a length of 3.7 metres and
a 4.5 metre applies for a length of 6.3 metres.
The proposed setback to Wattle Street is consistent with the setback of the dwelling on the
property adjoining to the north which is setback 3 metres from Wattle St. The majority of all
residential properties on the eastern side of Wattle Street have front setbacks that range from
1.5-3.5 metres. Setbacks on the western side of the street range from 2-6 metres. Wattle Street
has an 11 metre wide road verge from the boundary to curb line which provides for sufficient
setback from the road.
The proposed setback from Garnet Street is consistent with the adjoining property and other
residential properties that have a setback ranging from 1-6 metres, with an average of 4 metres.
The proposed building is well articulated and uses a mix of materials (colourbond, fibre cement
cladding, aluminium, glass and timber), colours and textures, and is generally compatible with the
character of Cooroy. Minimum landscaping requirements have been met, which contribute to the
character of the area and street. In summary, the proposed reduced setbacks from Wattle and
Garnet Streets are considered acceptable in this case as the development will maintain the visual
continuity and patterns within the streets.




                                                                                        Page 31 of 55

Section 32

GENERAL COMMITTEE MEETING AGENDA                                                       15 OCTOBER 2018


Built form, Privacy and overlooking
The ground floor of the building on the western side has a wall length of 19 metres. The probable
solution requires a maximum of 15 metres. The ground floor includes some vertical elements
such as doors and windows that break up the elevation into three distinct sections that are just
over 6 metres long. It should also be noted that this elevation addresses the rear boundary and
will therefore have no impact on the streetscape. Furthermore, as the building is setback more
than 6 metres from the rear boundary it is considered this will not have an adverse impact on the
adjoining property.
The proposal will be conditioned that the upper level windows are at a minimum height of 1.5
metres, or suitably screened to minimise overlooking opportunities to the private open space of
the property adjoining to the west.
Consultation
External Consultation - Community
The application was publicly notified for 15 business days in accordance with the Planning Act
2016. 1 properly made submission was received. The following table provides a summary and
assessment of the issues raised the submitter.


Matters Raised                                    Comments
Concerns with a new boundary fence that will      A property owner can legally erect a fence on their
immediately adjoin an existing shed (on           boundary at any time, regardless of what use occurs
neighbouring property) which will limit access    on the site. When this site is developed, the applicant
to the back of the shed for maintenance. The      intends to put a retaining wall (<1 metre) and fence
fence will also block out natural light to the    above on this boundary at a total height of 1.8 metres.
workroom area of the shed and will devalue
the property. Concerned with the disturbance
of the soil and impact on the sheds foundations
during construction.
Location of driveway and crossover on Wattle      The applicant was previously advised by Council
St does not comply with regulation (opposite      officers that access should be from Wattle Street,
Wimmers Lane) and results in an excessive         rather than from Garnet Street, being the lower order
amount of concrete which will have a negative     road. Garnet St is identified as a heavy vehicle
impact on the streetscape. Wattle Street is       bypass. The access needs to have adequate
very busy. Prefer that access by gained from      separation from the intersection with Garnet St and
Garnet Street.                                    the proposed access location is considered logical
                                                  and the most appropriate access to the site.
Concerns with the loss of the existing mango      Although the mango tree has been on site for a
tree – it is a character tree and provides        considerable period of time, it is not a native tree. The
screening to the existing backyard and private    Mango tree can be removed at any time without
open space.                                       Council approval. Given the location of the tree on the
                                                  property boundary, its proximity to the proposed
                                                  driveway, it is considered unlikely that the tree can
                                                  practically be retained. The proposal will necessitate
                                                  the removal of this tree and planting of native species
                                                  is required as part of the development, meeting the
                                                  acceptable outcome in Noosa Plan.
                                                  The new boundary fence will be aesthetically pleasing
                                                  and provide privacy to the submitter’s private open
                                                  space.




                                                                                             Page 32 of 55

Section 33

GENERAL COMMITTEE MEETING AGENDA                                                 15 OCTOBER 2018


Internal Consultation
     Engineering Officer, Development Assessment
     Environment Officer, Development Assessment

Conclusion
The proposed development is consistent with the overall outcomes for Cooroy as it contributes a
high level of residential amenity and respects the character and scale of the streetscape. The
proposed development is well located on the periphery of Cooroy town centre which provides
convenient access to services and facilities. The proposal is therefore recommended for approval
subject to conditions contained in this report.

Departments/Sections Consulted:

     Chief Executive Officer       Community Services                      Corporate Services
     Executive Officer             Director                                Director
     Executive Support             Community Development                   Financial Services
                                   Community Facilities                    ICT
                                   Libraries & Galleries                   Procurement & Fleet
                                   Local Laws                              Property
                                   Waste & Environmental Health            Revenue Services

     Executive Services        x   Environment & Sustainable Development   Infrastructure Services
     Director                      Director                                Director
     Community Engagement          Building & Plumbing Services            Asset Management
     Customer Service          x   Development Assessment                  Buildings and Facilities
     Governance                    Economic Development                    Civil Operations
     People and Culture            Environmental Services                  Disaster Management
                                   Strategic Land Use Planning             Infrastructure Planning,
                                                                           Design and Delivery




                                                                                        Page 33 of 55

Section 34

GENERAL COMMITTEE MEETING AGENDA                                                                 15 OCTOBER 2018


6                        NOOSA GYMNASTICS CLUB CAPITAL CONTRIBUTION PAYMENT AND NEW LEASE
DOCUMENT INFORM AT ION




Author                              Community Facilities Manager, Ash Saward
                                    Community Services Department

Index                               ECM/ Subject/ 72.01 – The J

Attachments                         Nil.



EXECUTIVE SUMMARY
Not applicable.

RECOMMENDATION
That Council note the report by the Community Facilities Manager to the General Committee
Meeting dated 15 October 2018 and:
A.                       Authorise a one-off capital contribution payment of $100,000 to Noosa Gymnastics Club to
                         assist with the unexpected cost of rectifying the non-compliant fire booster pump at the
                         Bicentennial Community Centre.
B.                       Authorise the Chief Executive Officer to enter into a new lease with Noosa Gymnastics
                         Club for the expanded main hall with an initial term of 10 years and two further options of
                         five years each.
C.                       Apply the exception to the requirement for tendering of this lease under Section 236 (1) (b)
                         (ii) of the Local Government Regulation 2012, as the site will be leased to a community
                         organisation.



REPORT
In January 2015, Noosa Gymnastics Club entered into a 10-year lease with Council for use of the
main hall at Bicentennial Community Centre (BCC). The Club has continued to grow in strength
and numbers since shifting their operations to BCC and are nearing completion of a $1.025m
extension of the hall using the Club’s funds and a State government grant (50-50 split).

The extension project has recently encountered an issue with the onsite fire booster pump which
requires prompt rectification in order for the building to receive final certification. Unfortunately
the current incoming water flow rate is insufficient to feed the pump at the required level, despite
initial testing of onsite flow rates suggesting they would be adequate.

This issue has arisen at the final stages of construction and presents an unexpected challenge
for the Club. The most viable way to rectify the issue is to install two 44,000L fire tanks and
plumb the fire booster pump to be fed by these. The cost of the tanks and associated site and
plumbing works is significant and totals $130k.

The Club does not have sufficient cash reserves to fund this unexpected cost. If compelled to find
a way to fund the cost of the works, the Club would be left without sufficient working capital to
maintain their operations and finalise fit out of the new area.




                                                                                                      Page 34 of 55

Section 35

GENERAL COMMITTEE MEETING AGENDA                                                15 OCTOBER 2018


Council has the opportunity to assist the Club with the cost of resolving the booster pump issue
by providing a one-off capital contribution payment of $100k. There are reasonable grounds for
such a payment given the Club has completed a $1.025m improvement to Council’s asset at no
cost to the organisation. Council’s assistance would make a large difference to the Club and
would ensure maximised community use of the asset following certification.

Once the booster pump issue has been resolved and certification is granted, a new lease will
need to be drafted to cover the expanded building. Simultaneously the existing lease will need to
be extinguished. Discussions between Council and the Club to date have indicated that a long-
term lease is warranted given the significant investment the Club has made in Council’s asset.

Management recommends that Council authorise the Chief Executive Officer to enter into a new
lease with Noosa Gymnastics Club for the expanded main hall with an initial term of 10 years and
two further options of five years each. It is recommended the rental rate be set at a level
commensurate with that already paid by the Club, with upward adjustments made to reflect any
additional costs incurred by Council as a direct result of the extended building area. The Club has
agreed to this in preliminary consultation undertaken on the matter.

It should also be noted that Council should apply the exception to the requirement for tendering
of this lease under Section 236 (1) (b) (ii) of the Local Government Regulation 2012, as the site
will be leased to a community organisation

Previous Council Consideration
Ordinary Meeting, 23 October 2014, Item 4, Page 4
That Council note the report by the Manager Community Facilities to the Infrastructure &
Services Committee Meeting dated 14 October 2014 and
A.    Authorise the Chief Executive Officer to enter into a 10 year lease with Noosa Gymnastics
      Club Inc. for the main hall at the Bicentennial Community Centre (as identified in
      Attachment 1);
B.    Authorise the Chief Executive Officer to enter into a 10 year lease to Noosa Christian
      Outreach Church to operate a Montessori School, if they are successful with their school
      accreditation, for the demountable building at the Bicentennial Community Centre (as
      identified in Attachment 1); and
C.    Apply the exception to the requirement for tendering of these leases under Section 236 (1)
      (b) (ii) of the Local Government Regulation 2012 as both leases are to community
      organisations.
Finance
The $100,000 contribution towards the cost of the booster pump is proposed to be included as a
capital cost in the next budget review (BR2) along with the new booster pump asset.

The additional lifecycle costs associated with the extended building will be incorporated into the
market rates set for the new lease to mitigate the impact to general rates.

Risks & Opportunities
Without resolution of the fire pump issue the building cannot receive final certification. This would
render a valuable Council and community asset unusable following the expiration of the current
interim certification.

The Noosa Gymnastics Club is well established and well managed and any risk of it not being
able to meet its commitments under a new leasing arrangement will be mitigated by the usual
legal conditions of a lease.


                                                                                      Page 35 of 55

Section 36

GENERAL COMMITTEE MEETING AGENDA                                                    15 OCTOBER 2018


The opportunity is for Council to secure a stable and long-term tenant for BCC at a rate which is
both commercially competitive and reflective of additional costs borne by Council as a result of
the building’s expansion.

Consultation
External Consultation - Community & Stakeholder
Noosa Gymnastics Club Management Committee

Internal Consultation
Departments/Sections Consulted:

   Chief Executive Officer   x    Community Services                      x   Corporate Services
   Executive Officer         x    Director                                x   Director
   Executive Support         x    Community Development                   x   Financial Services
                             x    Community Facilities                        ICT
                                  Libraries & Galleries                       Procurement & Fleet
                                  Local Laws                                  Property
                                  Waste & Environmental Health                Revenue Services

   Executive Services             Environment & Sustainable Development       Infrastructure Services
   Director                       Director                                    Director
   Community Engagement           Building & Plumbing Services                Asset Management
   Customer Service               Development Assessment                      Buildings and Facilities
   Governance                     Economic Development                        Civil Operations
   People and Culture             Environmental Services                      Disaster Management
                                  Strategic Land Use Planning                 Infrastructure Planning,
                                                                              Design and Delivery




                                                                                           Page 36 of 55

Section 37

GENERAL COMMITTEE MEETING AGENDA                                                               15 OCTOBER 2018


7                         CAPITAL PROGRAM DELIVERY STATUS - SEPTEMBER 2018
DOCUMENT INFORM AT ION




Author                               Asset Planning Manager, Bryan O’Connor &
                                     Infrastructure Planning, Design & Delivery Manager, Craig Eldridge

Index                                ECM/ Subject/ 2018-2019 Annual Capital Works Program

Attachments                          1.    Capital Projects Delivery Status for September 2018



EXECUTIVE SUMMARY
Not applicable.

RECOMMENDATION
That Council note the report by the Asset Planning Manager and the Infrastructure Planning,
Design and Delivery Manager to the General Committee Meeting dated 15 October 2018
providing an update on the projects being delivered throughout the 2018/19 Capital Program.


REPORT
The purpose of this report is to inform Council of the overall status and associated activities of
the Capital Program for the first quarter of the 2018/19 financial year.

There are currently 96 projects listed in the 2018/19 Capital Program, with a total allocated
budget of $31,240,755. This is inclusive of all carryover projects and recent emergent works.

1.                        Multi-year Projects

There are a number of projects that were carried over from the 2017/18 financial year into the
2018/19 financial year. These include but are not limited to:

                       Hinterland Playground, Cooroy - $1.25m
                       Noosaville Library - $805k
                       Mary River Road Bridge, Cooroy - $1.2m
                       Noosa Heads Park Road Boardwalk - $5.2m
                       Noosa River Holiday Park Amenities (Small & Large) Upgrades - $652k

2.                        Completed Projects

Projects continue to be delivered across the capital program with many projects well underway.
Some recently completed projects include:

                       Maple Street Raised Crossing, Cooroy
                       Main Beach Boardwalk, Noosa Heads
                       Gympie Terrace Corridor Upgrade Stage 1, Noosaville
                       Station Street Carpark & Bus Turning Circle, Pomona
                       Donnelly’s Road & Cooroy Belli Creek Road Safety Improvements, Ridgewood




                                                                                                    Page 37 of 55

Section 38

GENERAL COMMITTEE MEETING AGENDA                                  15 OCTOBER 2018


Maple Street raised crossing, Cooroy
Before                                     After




Main Beach Boardwalk Upgrade




Donnelly’s Road & Cooroy Belli Creek Road Safety Improvements, Ridgewood
Before                                    After




                                                                      Page 38 of 55

Section 39

GENERAL COMMITTEE MEETING AGENDA                                              15 OCTOBER 2018


3.     Project design and delivery

The project delivery section is being impacted by unplanned staff leave and the secondment of
the Project Delivery Coordinator to the Transport Strategy. These resourcing impacts are
delaying the tender, contracting and delivery of projects to be delivered in the 2018/19 Capital
Program.

Design and Delivery staff will forward plan for project adjustments in the second budget review of
the Capital Program. This will assist Council to have a realistic approach to the successful
delivery of the Program for the remainder of the 2018/19 financial year.

Summary

The current capital delivery expenditure to 30 September 2018 including actuals and
commitments is $18.1m or 58% of the Capital Program. The delivery and completion of projects
continues across the Program with staffing resources to be allocated in the coming months to
support the design and delivery phases of the projects.

The Program is currently behind schedule for the year to date budget of $10.7m, with year to
date actual expenditure of $7.6m to 30 September 2018. Increased monitoring across all projects
will be required for the remainder of the financial year with proposed adjustments to the delivery
timeframes to be considered during future budget review processes.

The table and the graph provided shows a breakdown of expenditure as at 30 September 2018.

YTD Actual Expenditure                        $7,654,082
Committed Expenditure                       $10,470,832
Remaining Capital Expenditure               $13,115,842
Full Year Budgeted Expenditure              $31,240,756




                                                                        YTD Actual
        Remaining Capital                                              Expenditure
          Expenditure                                                    24.50%
            41.98%




                                                                      Committed
                                                                      Expenditure
                                                                        33.52%




Previous Council Consideration
Nil.




                                                                                     Page 39 of 55

Section 40

GENERAL COMMITTEE MEETING AGENDA                                                   15 OCTOBER 2018


Finance
Nil.

Risks & Opportunities
Nil.

Consultation
External Consultation - Community & Stakeholder
Nil.

Internal Consultation
Project delivery staff within the Infrastructure Services Department were consulted in the
preparation of this report.


       Chief Executive Officer   Community Services                      X   Corporate Services
       Executive Officer         Director                                    Director
       Executive Support         Community Development                   X   Financial Services
                                 Community Facilities                        ICT
                                 Libraries & Galleries                       Procurement & Fleet
                                 Local Laws                                  Property
                                 Waste & Environmental Health                Revenue Services

       Executive Services        Environment & Sustainable Development   X   Infrastructure Services
       Director                  Director                                X   Director
       Community Engagement      Building & Plumbing Services            X   Asset Management
       Customer Service          Development Assessment                      Buildings and Facilities
       Governance                Economic Development                        Civil Operations
       People and Culture        Environmental Services                      Disaster Management
                                 Strategic Land Use Planning             X   Infrastructure Planning,
                                                                             Design and Delivery




                                                                                          Page 40 of 55

Section 41

ATTACHMENT 1




 Page 41 of 55

an,      |      T    =!                                                                                                                                                  .
                           NOOSA COUNCIL                                                                                                                                                                Capital Schedule
                                                                                                                                                                                              for the period ending September 2018
                                                                                                                                                                                                           ATTACHMENT 1
Report run date: 08-Oct-2018 13:34:38

Capital Works                                                                                     25,133,000       25,891,255                                                9,745,097       6,822,145        LAF eR)

   500813         500810 - Mary River Road Bridge Replacement                                         973,000        1,157,365                  9                    0         973,674          758,346        1,024,[email protected]%
   500814         500811 - Old Noosa Road Bridge Replacement                                        1.520,000        1,532,896                  9                    0         441,724           59,652        1,156,[email protected]%
    500812         500812 - Orealla Crescent Overpass Refurbishment                                         0          11.961                   a                    o          11.961           13,567           39,656 ©      113.43%
   500863         500863 - Noosa Heads Witta Circle Bridge Renewal                                     28,000          28,000                   0                    0          4,900              256                 0®         0.91%
   500864         500864 - Tewantin Doonella Bridge Renewal                                            18,000          18,000                   0                    0           4,900             523                 0g         2.91%
    500913         500911 - Cooroy Mountain Bridge                                                          0               a                   0                    0               0            9,821           55,[email protected]%
                                                                                Total Bridges       2,539,000       2,748,222                   0                    0        1,437,159         842,166        2,275,766         30.64%

   500784         500784 - Noosa River Bathymetry Survey                                               60,000         54.664                    a                    0           2.000               0                [email protected]%
   400820         600820 - Renewal of revetment wall at O-Boals Gympie Tce, Noosaville                224,000        223,024                    Qa                   o          18,850            1,444           24,[email protected]%
   500867         500867 - Peragian Beach Boardwalk Renewal North of Tower to accass                  140,000         140,000                   0                    0          12,600            1,459            6,600 ©        1.04%
                                                           Total Coastal Canals and Waterways         424,000         417,688                   0                    0          33,450            2,903           31,495          0.70%

   500866         500866 - Pomona Cemetery Timber Fence Renewal                                        27,000          27,000                   0                    0          27.000               0            20,[email protected]%
                                                                             Total Cemeteries          27,000          27,000                   a                    0          27,000               0            20,937          0.00%

   500693         500693 - Peregian Beach, 5 Rufous St Redevelopment Construction                           0               0                   0                    0               0           -5,973               019         0.00%
    500861        500855 - Peregian Digital Hub - Fitout                                                    0         124.181                   a                    0          82,786           34,347           97,[email protected]%
   500907         500905 - Rufous St - Community House                                                      0         100,000                   9                    0          18.180            8,155            7,[email protected]%
   500808         6500906 - Rufous St Stage 3 - Civil Works                                                 Oo              0                   0                    0               0            884                  [email protected]%
                                                             Total Commerical Land & Property               0        224,181                    Q                    0         100,966           37,414          104,380         16.69%

    100726         100726 - Peregian Surf Club Public Amenities - Planning & Design                         0         377,091                   0                    0          24.424            1,963           26,963 ©        0.52%
   500539         500539 - Noosa Heads Demolition of Lifeguard Service! SLSQ operations                52,000         49.271                    0                    0               0            5,813               00         11.80%
   500842         500840 - Tewantin SES Termite Damage                                                      0           6.977                   a                    0           6.977            3,324               09        47.64%
    500857        500851 - NAC & NLC Roof Restoration (to Support Solar Panels)                       100,000         172,500                   0                    0          49.165            7,132                [email protected]%
   500868          500868 - Pomona Community House Airconditioning Renewal                             30,000          30,000                   0                    0          30,000               0                 0®@        0.00%
   500869         500869 - Tinbeerwah Main Hall Flooring Renewal                                       50,000          50,000                   0                    0         50.000                0                 0g         0.00%
  500870           500870 - Pomona Kindergartan - Roof Replacement                                     50,000          50,000                   0                    0               0               0                 0®@        0.00%
   500871          500871 - NAC - 25m AMP Pool Renewal Program                                         14,000          14,000                   0                    0           3,500                0                09         0.00%
   500872          500872 - NAC - 50m AMP Pool Renewal Program                                        131,000         131,000                   0                    0          32,750               0                [email protected]%
   500873         500873 - NAC - LTS AMP Pool Renewal Program                                          14,000          14.000                   a                    0           3.500               0                [email protected]%
    500874        500874 - NAC - Other AMP Infrastructure Renewal Program                             306,000         306.000                   0                    0          76.500               0                0%          0.00%
                                                                                                                                                                                                              Page 41 of 55

Section 42

Page 42 of 55

500875         500875 - NAC - Replace Automated Pool Cleaner                                      15,000          15,000                   a                   0           3.750               0               01o        0.00%
                                                                Total Community Facilities        762,000       1,215,839                   0                   0         280,566          18,237          26,963           1.50%

500776          500776 - Tewantin Administration Building - masterplan                            180,000        200.000                    0                   0          25,988               0               [email protected]%
 400843         500841 - Tewantin Admin Quilding Automatic Transfer Sviteh                             0           17.037                   a                   0          17,037          15,236                 71g     89.43%
500858          500852 - Tewantin Administration Building Roof                                    600,000         650,000                   a                   0               0           2,379            1,[email protected]%
500910          500910 - Cooroy SES Shed Alterations                                                   0          30,000                    a                   0               a             378                19         1.26%
                                                                 Total Corporate Buildings        780,000         397,037                   0                   0          43,025          17,993            1,255          2.01%

500865          500865 - Tewantin - Read Park Carpark Surfacing                                   150,000         150,000                   9                   0         150,000           1,529            2.727 ©        1.02%
                                                                           Total Car Parks        150,000         150,000                   a                   o         150,000           1,529           2,727           1.02%

 500519         500519 - Whole of Shire Gravel Resheeting - Annual Program                        410,000         410,000                   a                   0         102,500          44,283           37 [email protected]%
500841          500758 - Hinterland - Upgrade of Hinterland Gravel Road Sections                  391,000        547.015                    0                   0        547.015          686,654           87,919 ©      125.53%
                                                                Total Gravel Road Network         801,000         957,015                   Q                   0        649,515          730,937          125,555         76.38%

500661          500661 - Noosa North Shore Campground Redevelopment                             2,500,000       2,509,110                   a                   0         56,968           13,824            8496 O        0.55%
500662          500662 - Noosaville, Noosa River Holiday Park Small Amenities Replace             199,000        224.387                    a                   0         118,846          40,648           11,[email protected]%
500663          500663 - Noosaville, Noosa River Holiday Park Large Amenities Refurb              428,000         428,000                   a                   0        382,000           98,913          321,[email protected]%
500876          500876 - NRHP Road Reseal and V Drain Foreshore Works                             149,000         149.000                   0                   0           6,290               0                09        0.00%
                                                                       Total Holiday Parks     3,276,000        3,310,497                   Q                   0        564,104          153,385          341,932          4.63%

500651          500651 - Noosaville Library, Refurbishment Planning and Design                    805,000        586.964                    a                   0        586,964          670,295          350,492 ©      114.20%
 500878         500878 - Noosaville Library Weather Protection Shelter to Entrance                35,000           35,000                   a                   0          35,000               0               oo         0.00%
500879          500879 - Cooray Library Air Conditioner Plant Room Enclosure                      20,000          20,000                    a                   0           1,875              92            5,[email protected]%
                                                                 Total Libraries & Galleries      860,000         641,964                   0                   0        623,839          670,388         356,292         104.43%

500551          500551 - Noosa Hinterland Prority Playground - Planning & Design                1,250,000       1,220,317                   0                   o         115,000          31,010          158,[email protected]%
 500594         500594 - Botanic Garden Shade House                                                    0            2.664                   a                   0           2.664           4,007               18        150.43%
 500666         500666 - Noosaville, Gympie Terrace Park Furniture Renewals                       80,000          80.000                    0                   0         20,000              77                ogo        0.10%
500781          500781 - Cooran Pioneer Park upgrade - Design & Construction (incl D              155,000         123,599                   a                   0         123,599         111,798           16,[email protected]%
500880          500880 - Pomona Stan Topper Park - Basketball Court Renewal                       35,000           35,000                   0                   0               0              S7                08         0.16%
 500881         500881 - Pomona Jo Bazzo Park BBO and Associated Pathways                         30,000          30,000                    a                   0           1.000             86                [email protected]%

                                                                                                                                                                                                     Page 42 of 55

Section 43

Page 43 of 55

500882          500882 - Peregian Beach Town Square Upgrade Planning & Design                    25,000         25,000                    0                   0          17,000            545            3,300 ©        2.18%
500883          500883 - Headland Park Playground Renewal                                        60,000         60,000                    0                   0           2,000            891                01o        1AB%
 500884         500884 - Wavecrest Park Shade Sail Renewal                                       43,000          43,000                   0                   0          21,500              0                0          0.00%
500885          500885 - Noosa Heads Pinaroo Park Swing & Softfall Renewal                        19,000         19.000                   0                   0               0              0                08         0.00%
 500886         500886 - Sunrise Beach Orient Park North Swing & Softfall Renewal                 19,000         19.000                   9                   0               9              0                08         0.00%
 500887         500887 - Sunrise Beach Comet Park Swing & Softfall Renewal                        19,000         19,000                   0                   0               9              0                [email protected]%
                                                                Total Parks & Playgrounds      1,735,000       1,676,580                  0                   0        302,763          148,472         179,036          8.86%

500630          500616 - Whole of Shire - Noosa Pedestrian and Cycle Data Counters                    0          73,125                   0                   0          73,125          73,135               0        100.01%
500636          500622 - Noosa Heads Noosa Parade Road Corridor Upgrade - Design                      0          16.709                   0                   0           3,038           6,395           6370 ©        38.27%
 500671         500671 - Noosa Heads, Park Road Boardwalk Construction                         5,121,000       5,187,820                  9                   0       3,060.747       2.398.810        1,226,[email protected]%
 500672         500672 - Noosa Heads. Main Beach Boardwalk Construction                         697,000         349,057                   9                   0        349,057          241,946           [email protected]%
500817          600814 - Jacaranda Park, Tewantin - Pathway Renewal                                   oO         33.601                   o                   0         33.601          $3,496              178        169.21%
400823          500823 - Boardwalk renewal at Gympie Tce, Noosaville                                  oO              a                   0                   0               a           446                 [email protected]%
500828          500828 - Pathway renawal at Gympie Terrace                                            0          68,505                   0                   0          12,454         20,347                oo        29.70%
500829          500829 - Pathway renewal at James St, Noosaville                                      0               0                   0                   0               0           4,669               oo         0.00%
500831          500831 - Tewantin Diyan Street New Footpath                                           0               a                   0                   0               0           1,127               08         0.00%
500888          500888 - Cooroy Maple Street Raised Pedestrian Crossing                          75,000          75.000                   9                   0               0          22,770          25,[email protected]%
500906          500903 - Tewantin. Hilton Terrace CNLGGP Shared Pathway                         400,000        400.000                    Q                   0         99.000            1,274               [email protected]%
                                                             Total Pathways & Boardwalks       6,293,000      6,203,817                   0                   0       3,631,022       2,824,416        1,276,173        45.53%

 500891         500891 - Peragian Beach Public Amanitias Renewal Construction                   350,000               a                   0                   0               0            446                01o        0.00%
                                                                   Total Public Amenities       350,000               0                   0                   0               0           446                 0          0.00%

 600312         500528 - Whole of Shire Bus Shelter Disabled Compliant Program                  518,000         518,000                   0                   o          74,750          45,839         214,188 @        8. B5%
                                                       Total Public Transport Infrastructure    518,000         516,000                   0                   0          74,750         45,839          214,188          8.85%

500530          500530 - Whole of Shire Reseal & Rehabilitation Program                        3,800,000      3,800,000                   0                   0         950,000         310,934        3,694,267 ©       8.18%
 500633         500619 - Black Mountain Rd Landslip                                                   0               a                   Q                   0               0           7.952          23,[email protected]%
500840          500757 - Black Mountain - Road Priority Sections and Road Reconstruct           410,000        384,863                    9                   0          61,500          23,544           14,[email protected]%
 500806         500806 - Weyba Road Corridor Improvements                                             o         40,000                    0                   o         40,000           23,304          22,058 ©       58.26%
500837          500837 - Eumundi Rd, Gibson Rd, Hilton Tce, Gympia Tee Roundabout res                 0          23,509                   0                   0          23,509          17,286               10        73.53%
 500845         500845 - Peragian Beach, David Low Way Guardrail Renewal                              0          AS,042                   0                   0               0          15,686             [email protected]%
500847          500847 - Sunshine Beach Resurfacing Preparation Warks                                 0         155.400                   a                   0               0         137,960             [email protected]%
500859          500853 - Cooroy Belli Creek Road Slip (Ex TC Debbie Betterment Claim)                 0          95,900                   0                   0          63,932         84,552            9,447 ©       88.17%
500912          500909 - Ben Lexen Drive Sunshine Beach School Drop Off-Pickup Zone                   0           5,875                   0                   0           5,875              0                08         0.00%

                                                                                                                                                                                                   Page 43 of 55

Section 44

Page 44 of 55

Total Sealed Roads Network       4,210,000        4,550,589                   0                    0       1,144,816         621,218         3,764,296         13.65%

   500835          500835 - Renewal of vanous stormwater structures across the shire                        0          74,988                    0                    0          37,494          41,479             5,030 ©      55.31%
   500911          500908 - Grosvenor Terrace Drainage Improvement Works                                    0          67,000                    9                   0           67.000            7422                [email protected]%
                                                                    Total Stormwater Drainage               0          141,988                   a                   o          104,494         48,900              5,030         34.44%

   500898          500862 - Hastings Street CCTV Systam Renewal                                       156,000          156.000                   a                   0           39.000             173                0g          0.11%
                                                         Total Streetscapes and Road Corridors        156,000          156,000                   0                    0          39,000             173                0           0.11%

   400300          500546 - Whole af Shire Forward Planning & Design Program - Construct              500,000         500,000                    a                   o          125,000          89,033            87 484 ©       17.81%
   400615          500601 - Noosaville Fenie Ck Pathway signage stage 2                                     0               a                    0                   0                0            2,027               og          0.00%
   500678          500678 - Castaways Beach, David Low Way Safety and Corridor Improveme              254,000         254.000                    0                   0                0           10,637               in /)       4.19%
   500679          500678 - Tewantin, Hilton Terrace & Ernest Street Intersection                    1,100,000        765,210                    0                   0          276,000         353,019           735,[email protected]%
  500705           500705 - Tewantin, Poinciana Avenue & Moorindil Street Intersection                      0           23,391                   0                    0          23,391            6,601          107,697 ©      28.22%
   500706          500706 - Pomona, Station Road Car Parking and Safety Improvements                        0          114.237                   0                   0          114.237          177,211            5,665 ©      155.13%
   500892          500892 - Bicentennial Carpark and School Safe ST Program                           134,000          134,000                   0                   0                9               0                 [email protected]%
   500893          500893 - Sunshine Beach Pacific Avenue Pathway, Pedestnan & Drainage               150,000          150,000                   0                   0                0            4,242                [email protected]%
                                                 Total Transport and Infrastructure Management      2,138,000        1,940,838                   0                   0         538,628         642,769            936,611         33.12%

   500787          500787 - Noosaville Eumundi Road landfill Upgrade Brite Side facility                    0               0                    0                    0               0            9,404               0o          0.00%
   500788          500788 - Noosaville Eumundi Road landfill New Shed                                       0               0                    a                    0               0            1,622               0o          0.00%
   500894          500894 - Eumundi Rd Landfill Concept Design & Geotechnical Investigat               37,000           37,000                   9                   0                0               0            12,[email protected]%
   400895          6500895 - Eumundi Rd Landfill Provision af Bidim Fabric A14                         10,000           10.000                   a                   0                a               0                 [email protected]%
   500896          500896 - Eumundi Rd Landfill Recyclables Sales Shed & Education Roam                67,000           67,000                   0                   0                a               0                 08         0.00%
   500862          500897 - Eumundi Rd Landfill - RRA carpark reseal                                        0               0                    0                   0                0            3,933             6129          0.00%
                                                                     Total Waste Management           114,000          114,000                   0                    0               0           14,959           13,352         13.12%

Other Capital                                                                                       3,928,000       5,349,500                                                  i es)            Eee Rs           Fic renee

   500685          500685 - Whole of Shire, Pavement System and Analysis for Reseal Prog               40,000          40,000                    0                   0                0            1,126               [email protected]%
   500687          500687 - Whole of Shire, CCTV Drainage Program                                     200,000         200.000                    0                   0          50,000           35,885            27,[email protected]%
   500710          500710 - Whole of Shire, T1 Asset Systems Mobility Rollout & Hardware              100,000          150.000                   a                   0           4,090            10,584                oo         7.06%
   500753          500753 - Zero Emissions Noosa Project Implementation                               500,000         655.517                    0                    0         64.400           42,595           118,[email protected]%
   500780          500780 - Tewantin Administration Building Air Handling Unit replaceme                    0            5,000                   0                    0               0               0                 09         0.00%

                                                                                                                                                                                                            Page 44 of 55

Section 45

Page 45 of 55

Total Asset Management         840,000        1,050,517                  0                   0         148,490         90,189           145,474         8.59%

5005138         500518 - Plant and Fleet Replacement Program                                    1,098,000       1,998,878                  0                   0         433,296         475,253          380,638 ©      23.78%
                                                            Total Fleet - Plant Replacement     1,098,000       1,998,878                  Q                   0        438,296          475,253          380,638        23.78%

500542          500542 - Implementation of Cl Anywhere Functionality for TechnologyOn            400,000         478.371                   a                   0         54.248           71,810           18,[email protected]%
500778          500778 - Noosa Heads The J renewal of AV system Year 2 of 3                      30,000          30,000                    0                   0          15,000               0               018        0.00%
500877          500877 - ICT Hardware - Network Switch Replacement                               370,000         370,000                   0                   0               0           9,154               08         2AT%
                                                             Total Information Technology        800,000         878,371                   Q                   0          69,248         80,964            18,380         9.22%

 600107         600107 - Noosa River Hydraulic Model                                                   0         34.910                    0                   0           6.346               oO              01g        0.00%
500714          500714 - Whole of Shire, Climata Change Adaptation Strategy                      175,000         371,824                   0                   0          79,536          43,034          206,[email protected]%
500716          500716 - Whole of Shire, Project Team Resources for New Planning Sche            676,000         676.000                   0                   0         162.000         122,611           20,[email protected]%
500889          500889 - Shire Project Team Materials & Services                                 125,000         125.000                   0                   0         50,000           19,885           22,[email protected]%
 500890         500890 - Shire Planning Scheme Consultancy                                       214,000         214,000                   0                   0         40,000                0               00         0.00%
                                                         Total Planning Scheme Expansion        1,190,000       1,421,734                  o                   0        337,882          185,530          250,350        13.05%

                                                                            Grand Total                      29,061,000_31,240755 OSC 10,799,013                                      7,654,082       10,470,832         24.50%

                                                                                                                                                                                                  Page 45 of 55

Section 46

GENERAL COMMITTEE MEETING AGENDA                                                                15 OCTOBER 2018



8                             FINANCIAL PERFORMANCE REPORT - SEPTEMBER 2018
DOCUMENT INFORM AT ION




Author                                Manager Financial Services, Trent Grauf
                                      Corporate Services Department

Index                                 ECM/ Subject/ 22.09 – Monthly Financial Performance Report

Attachments                           1.   Statement of Income and Expenditure (Profit & Loss and Capital)
                                      2.   Statement of Financial Position
                                      3.   Statement of Cash Flows


EXECUTIVE SUMMARY
Performance against current budget for the month of September 2018 aligns with YTD budget.

The budget review 2 (BR2) process is currently underway and will address any real current
budget variations and emergent requests.

YTD Financial Performance Summary
                                                  Budget        Actual        Variance   Variance     Status
                                                     $m            $m              $m          %
Operating Revenue                                   $40.6        $41.4            $0.8      2.0%      On Track
Operating Expense                                   $23.5        $22.9            $0.6      2.6%      On Track
Operating Position                                  $17.1        $18.4            $1.4      8.3%


Capital Revenue                                      $0.4         $0.4            $0.0      0.8%      On Track
Capital Expenditure*                                $10.7         $7.7            $3.0      28.7%   Below Budget
* Reflects constructed assets and intangibles only (excludes contributed)


Financial statements including Statement of Operating Profit & Loss, Summary of Capital
Financial Performance, Statement of Financial Position (balance sheet), and Statement of Cash
Flows are included as attachments for information of Council.

Figure 1: Actual Performance Compared to Budget

               $45
                                                            YTD Budget ($m)
               $40                                          YTD Actual ($m)
               $35
               $30
               $25
               $20
               $15
               $10
                         $5
                         $-
                                     Operating Revenue              Operating Expenditure



                                                                                                     Page 46 of 55

Section 47

GENERAL COMMITTEE MEETING AGENDA                                                       15 OCTOBER 2018


RECOMMENDATION
That Council note the report by the Manager Financial Services to the General Committee
Meeting dated 15 October 2018 outlining September 2018 year to date financial performance
against budget.


REPORT
Operating Revenue (YTD Benchmark 25.0%)
Council has received 43% ($41.4 million) of its operating revenue budget ($95.7 million).
Commentary on each revenue category is provided below.

Category           Summary                          Comments
Rates and Levies   $33.2 million (50%) of the           Overall, rates and levies earned are in line with
                   annual budget of $66.6                 budget expectations
                   million has been earned
Fees and           $2.2 million (40%) of the $5.5       Development related fees $111k above YTD
Charges            million annual budget has              budget (36% or $395k of $1.1m budget earned)
                   been earned                          Building application and search fees $66k above
                                                          YTD budget (37% or $199k of $533k budget
                                                          earned)
                                                        Local laws parking infringements $27k above
                                                          YTD budget (29% or $198k of $670k budget
                                                          earned)
                                                        Cemetery fees $26k above YTD budget (36% or
                                                          $81k of $221k budget earned)
Sale of Goods      $2.4 million (27%) of the $8.7       Eumundi Landfill disposal charges $143k above
and Services       million budget has been                YTD budget (29% or $842k of $2.9m budget
                   received                               earned)
                                                        Holiday parks $97k above YTD budget (27% or
                                                          $797k of $2.9m budget earned)
                                                        Noosa Aquatic Centre $40k above YTD budget
                                                          (22% or $392k of the $1.7m budget earned)
Interest           $1.2 million (28%) of the $4.3       Investment revenue $138k above YTD budget
Received           million annual budget has              (36% or $451k of $1.25m budget earned)
                   been earned                          Interest on overdue rates and charges $17k
                                                          above YTD budget (29% of $117k of $400k
                                                          budget earned)
Dividend and       On track                         Nil
Tax
Other Revenue      $776k (33%) of the $2.4              Civil operations internal recoveries for works and
                   million budget has been                quarry material $328k (no budget)
                   earned                               Waste Management internal recoveries for
                                                          landfill disposal $18k above YTD budget (115%
                                                          or $23k of $20k budget earned)
Operating          $1.2 million (23%) of the $5.2       Operating grants are in line with budget
Grants,            million budget has been                expectations at this stage.
Subsidies          received                             50% or $1 million of the financial assistance
                                                          grant was again prepaid in June 2018 and may
                                                          impact on Council’s 2018/19 final operating
                                                          position if the prepayment approach is
                                                          discontinued by the Australian government.



                                                                                             Page 47 of 55

Section 48

GENERAL COMMITTEE MEETING AGENDA                                                             15 OCTOBER 2018


Figure 2: Operating Revenue Position by Type (Excluding Rates)

 $3.0
                                                       YTD Budget ($m)

 $2.5                                                  YTD Actual ($m)


 $2.0

 $1.5

 $1.0

 $0.5

 $0.0



                                                            Income
           Charges




                                                                         Other




                                                                                    Grants
                                            Goods &
                      Dividend




                                            Services
                                            Sales of




                                                             Rental
                                 Interest
           Fees &




                       & Tax




Operating Expenditure (YTD Benchmark 25.0%)

Actual operating expenditure is currently 24% ($22.9 million) of full year budget ($95.7 million).
Detailed commentary for each expenditure category is provided below.

Category             Summary                           Comments
Employee Costs       $6.9 million (22%) of the               Under expenditure for permanent staff salaries
                     annual budget of $32.3                    and wages ($382k) partially offset by additional
                     million has been expended                 spend on casual staff and external labour hire
                                                               ($172k)
                                                             Staff training underspend of $71k (4% or $16k
                                                               of $363k budget expended)
Materials and        $10.5 million (25%) of the              Community development $35k below YTD
Services             $41.2 million annual budget               budget due to timing of community grants
                     has been expended.                        (57% or $558k of $978k budget spent)
                                                             Cemeteries $23k below YTD budget (11% or
                                                               $19k of $177k budget spent)
                                                             Waste management collection and landfill
                                                               contract costs $36k below YTD budget (25% or
                                                               $2.0 million of $7.9 million budget spent)
                                                             Civil operations contract services $126k below
                                                               YTD budget (20% or $1.1m of $5.4m budget
                                                               spent)
                                                             Asset management consultancy fees $116k
                                                               above YTD budget (99% or $140k of $142k
                                                               budget spent)
Finance Costs        On track                          Nil
Depreciation         On track                          Nil
Other Expenses       On track                          Nil




                                                                                                 Page 48 of 55

Section 49

GENERAL COMMITTEE MEETING AGENDA                                                                                 15 OCTOBER 2018


Figure 3: Operating Expenditure Position by Type

 $12
                                                     YTD Budget ($m)
 $10
                                                     YTD Actual ($m)
  $8

  $6

  $4

  $2

  $0


                                                            Finance Costs
                                         Materials




                                                                            Depreciation
             Employees




                                                                                                         Other
Capital Revenue
YTD capital revenue of $360k received comprises cash contributions from developers ($154k)
and capital grants ($206k). Note that the timing of capital grant receipts are generally dependent
on the timing of grant conditions and also capital delivery performance, and that the timing of the
receipt of developer contributions (both cash and contributed) is unpredictable.

Figure 4: Capital Revenue by Type

$0.3
                                                                            YTD Budget ($m)

$0.2                                                                        YTD Actual ($m)


$0.2


$0.1


$0.1


$0.0
                         Contributions




                                                       Subsidies




                                                                                           Contributed
                                                        Grants /




                                                                                             Assets
                            Cash




                                                                                                                    Page 49 of 55

Section 50

GENERAL COMMITTEE MEETING AGENDA                                               15 OCTOBER 2018


Capital Program
Actual capital expenditure (excluding commitments) is $7.7 million (YTD budget $10.7 million).
Detailed discussion of progress in the delivery of the capital works program is provided through a
separate report by the Infrastructure Services Department.

Figure 5: Capital Program Delivery Performance

$12.0
                                                            YTD Budget ($m)
                                                            YTD Actual ($m)
$10.0

 $8.0

 $6.0

 $4.0

 $2.0

 $0.0
                          Capital works                 Other capital




Cash Management and Investment Performance
Total cash on hand at the end of September was $77 million. Included in this balance are funds
held in trust and for restricted purposes (e.g. unexpended levy and grant funds).

The pie charts following present the mix of cash held at September 2018 by agency (graph on
the left) and by credit risk rating (graph on the right). All funds have been invested in accordance
with the Investment Policy and in consideration of the principles of ethical investment,
preservation of capital, return on investment and counterparty thresholds.

Figure 6: Closing Cash Held by Agency and Credit Rating


                        Bendigo                                       A3
                          5%                                       (Bendigo)
              Suncorp                                           A1    5%
               12%                                           (Suncorp
                                                                 )
                                                               12%
        NAB                                                                     A1 +
                                          QTC               A1 +               (QTC)
        12%
                                          59%        (CBA + NAB + Wpac)         59%
                                                            24%

          CBA
          11%




                                                                                       Page 50 of 55

Section 51

GENERAL COMMITTEE MEETING AGENDA                                                             15 OCTOBER 2018


The following chart monitors the year-to-date trend on total cash and the agencies invested. To
ensure optimal return in accordance with the Investment Policy, $10 million was invested during
September with Suncorp bank in a range of term deposits. A $2 million term deposit held with
NAB bank also matured during September and was utilised to cover working capital
requirements.

Figure 7: Year to Date Trend of Cash Invested by Agency

  100,000,000.00

   90,000,000.00

   80,000,000.00

   70,000,000.00

   60,000,000.00

   50,000,000.00

   40,000,000.00

   30,000,000.00

   20,000,000.00

   10,000,000.00

              -
                  Oct-17 Nov-17 Dec-17 Jan-18 Feb-18 Mar-18 Apr-18 May-18 Jun-18    Jul-18   Aug-18 Sep-18

                            QTC         Bendigo       Westpac       NAB            Suncorp         CBA



Actual interest revenue for July was $150k with a weighted average yield of 2.3%, which reflects
a positive return compared to the industry benchmark (Bloomberg AusBond Bank Bill Index) of
1.9%.

Previous Council Consideration
Nil.

Finance
As above.

Risks & Opportunities
Council’s risk register includes a number of risks that could impact on ongoing financial
sustainability. Effective budget management and reporting is an important risk mitigation tool.

Consultation
External Consultation - Community & Stakeholder
Nil.

Internal Consultation
All areas of Council are consulted as part of the regular monitoring of budget performance.




                                                                                                 Page 51 of 55

Section 52

GENERAL COMMITTEE MEETING AGENDA                                                    15 OCTOBER 2018



Departments/Sections Consulted:

x   Chief Executive Officer   x   Community Services                      X   Corporate Services
    Executive Officer             Director                                x   Director
    Executive Support             Community Development                   x   Financial Services
                                  Community Facilities                        ICT
                                  Libraries & Galleries                       Procurement & Fleet
                                  Local Laws                                  Property
                                  Waste & Environmental Health                Revenue Services

x   Executive Services        x   Environment & Sustainable Development   x   Infrastructure Services
    Director                      Director                                    Director
    Community Engagement          Building & Plumbing Services                Asset Management
    Customer Service              Development Assessment                      Buildings and Facilities
    Governance                    Economic Development                        Civil Operations
    People and Culture            Environmental Services                      Disaster Management
                                  Strategic Land Use Planning                 Infrastructure Planning,
                                                                              Design and Delivery




                                                                                           Page 52 of 55

Section 53

Page 53 of 55

ATTACHMENT 1

 Profit and Loss Statement

 Revenue
     Recurrent Revenue
     Rates, levies and charges                          66,553           33,276           33,217             (59)       50%
     Fees and charges                                     5,542           1,950            2,210             260        40%
     Dividend income                                      1,600               -                .                -        0%
     Interest received                                   4,250            1,050            1,205             155        28%
     Tax equivalents                                      1,450             380             380                 -       26%
     Sale of Goods and major services                    8,731            2,106            2,382             276        27%
     Sale of contract and recoverable works                 16                -                1               1         5%
     Rental & lease income                                1,546             416             400              (16)       26%
     Other income                                          811              192             376              184        46%
     Grants, subsidies, contributions and donations       5,225           1,180            1,205              25        23%
                                                        95,724          40,551            41,377             825        43%
 Expenses
     Recurrent Expenses
     Employee benefits                                  32,273            7,455            6,997            (458)       22%
     Materials and services                             41,439           10,610           10,467            (143)       25%
     Finance costs                                       2,579              600             599               (1)       23%
     Depreciation and amortisation                       19,264           4,816            4,816                -       25%
     Other expenses                                        154               55              63                8        41%
                                                “95,709          23,536           22,943          (593)            24%
Operating Result                                                       0                 184

 Summary of Capital Revenue and Expenditure
 Capital Revenue
     Capital contributions and donations                 4,043              158              154              (4)        4%
     Grants, subsidies, contributions and donations       3,375             206             206                 -        6%
     Other capital revenue                                    -               -                -                -
TotalCapitalRevenue                                        At 8
 Capital Expenditure
     Contributed assets                                  2,000                -                -                -        0%
     Constructed assets                                 31,240           10,739            7,654          (3,085)       25%
     Other capital expenses                                   -               -                -                :
Total Capital Expenditure =                             33,240          10,799            7,654          (8,085)

                                                                                                           Page 53 of 55

Section 54

Page 54 of 55

ATTACHMENT 2

  Current Assets
       Cash and cash equivalents                                       46,127                 77,151                  64,229
       Trade and other receivables                                      8,943                  8,232                   6,944
       Inventories                                                        330                    329                    326
       Other current assets                                               490                  2,682                   4,117
                                                                       55,890                88,394                   75,615
       Non Current Assets held for sale                                     -                      -                       -
  Total Current Assets                                                 55,890                88,394                   75,615
  Non Current Assets
       Trade and other receivables                                     49,218                 49,218                 49,218
       Other non current Assets                                             -                      -                       -
       Investments                                                     73,332                 60,978                  60,978
       Investment property                                              4,405                  4,405                   4,405
       Property, plant and equipment                                  978,029                913,116                910,464
       Intangible assets                                                7,156                  5,046                   4,862
  Total Non Current Assets                                          1,112,140              1,032,764               1,029,927
TotalAssets                                                         4,968,030,           127,158                  1,105,542
  Current Liabilities
       Trade and other payables                                         4,705                 10,445                   9,791
       Borrowings                                                       3,718                  1,849                   1,849
      Provisions                                                        4,282                    741                   2,559
      Other                                                              665                     749                    for
  Total Current Liabilities                                            13,368                 13,783                  14,957
  Non Current Liabilities
       Trade and other payables                                             -                      -                       -
       Borrowings                                                     34,040                  32,165                  34,291
      Provisions                                                       10,328                 10,000                   9,879
  Total Non Current Liabilities                                       44,367                  42,164                  44,169
Total Liabilities: ©                                                     T3685 94                                   59,126
NetCommunityAssets                                               410,294                 1,065,211               1,046,417
  Community Equity
       Asset Revaluation Surplus                                       67,090                 41,739                  41,739
       Retained Surplus / (Defeciency)                                      -                      -                       -
       Shire Capital                                                1,043,204                991,874                991,874
       Current Year Net ae                                                  -                 31 A                    12,804

                                                                                                       Page 54 of 55

Section 55

Page 55 of 55

ATTACHMENT 3

Cash flows from operating activities

      Cash Flows from Operating Activities

      Receipts from Customers                                                     81,362              40,825               84,501
      Payments to Suppliers and Employees                                        (74,275)             (21,021)             (77,571)
                                                                                   7,087              19,804                6,930
      Receipts:
      Investment and Interest Revenue Received                                     4,250                1,205               4,741
      Rental Income                                                                1,541                 400                 1,358
      Non Capital Grants and Contributions                                         5,211                1,205               6,033
      Income Tax Equivalent Received                                               1,200                 380                 1,200
      Income from Equity Investments                                               1,850                    -                1,860
      Payments:
      Borrowing Costs                                                                   -                   -                    -
      Interest Expense                                                               (11)                 (87)                (142)
      Net Cash Inflow/(Outflow) from Operating Activities                         21,128             22,908                21,980
Cash Flows from Investing Activities

      Receipts:
      Proceeds of Sale of Property, Plant and Equipment                               10                    -                 154
      Grants, Subsidies, Contributions and Donations                               5,419                 360                7,351
      Payments:
      Payments of Property, Plant and Equipment                                  (28,916)              (7,402)             (24,881)
      Payments for Intangible Assets                                              (2,325)                (305)              (1,839)
      Net Cash Inflow/(Outflow) from Investing Activities                        (25,812)              (7,347)             (19,215)
Cash Flows from Financing Activities

      Receipts:
      Proceeds from Borrowings                                                     4,875                    -                1,165
      Payments:
      Repayment of Borrowings                                                     (5,300)              (2,639)              (5,164)
      Net Cash Inflow/(Outflow) from Financing Activities                           (425)              (2,639)              (3,999)
      Net Increase/(Decrease) in Cash and Cash Equivalents held                   (5,109)             12,922                (1,234)
      Cash and Cash Equivalents at the beginning of the reporting period          51,236              64,229               65,463
      Cash and Cash Equivalents at the end of the reporting period               46,127               77,151               64,229

                                                                                                             Page 55 of 55

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.