Original source · versioned page text
2018-10-15 General Committee Agenda
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
GENERAL COMMITTEE MEETING AGENDA 15 OCTOBER 2018
EXECUTIVE SUMMARY
Not applicable.
RECOMMENDATION
That Council note the report by the Development Planner to the General Committee Meeting
dated 15 October 2018 regarding Application No. MCU18/0094 for a Development Permit for
Material Change of Use for Multiple Housing - Type 4 Conventional. (4 Dwelling Units) situated at
15 Garnet St, Cooroy and
A. Approve with the following conditions:
PLANNING
When Conditions must be Complied With
1. Unless otherwise stated, all conditions of this Decision Notice must be complied with
prior to the use commencing, and then compliance maintained at all times while the
use continues.
Approved Plans
2. Development undertaken in accordance with this approval must generally comply
with the approved plans of development. The approved plans are listed in the
following table unless otherwise amended by these conditions.
Plan Rev. Plan/Document Name Date
No.
A10 F Ground – Site Plan, drawn by Morriarchi Architecture 3 July 2018
A11 E Level 1 – Roof – Site Plan, drawn by Morriarchi Architecture 3 July 2018
A12 C Townhouse Type A (3 bed) – Floor Plans, drawn by 3 July 2018
Morriarchi Architecture
A13 C Townhouse Type B (2 bed) – Floor Plans, drawn by 3 July 2018
Morriarchi Architecture
A14 A Landscape Plan, drawn by Morriarchi Architecture 3 July 2018
A20 E Elevations, drawn by Morriarchi Architecture 3 July 2018
A30 E Sections, drawn by Morriarchi Architecture 3 July 2018
A80 E Perspective Images, drawn by Morriarchi Architecture 3 July 2018
SD-1 C Landscape Concept Plan, prepared by Project Urban 18 May 2018
Nature and Extent of Approved Use
3. This approval is for 1 x 3 bedroom unit and 3 x 2 bedroom units. The TV/Study room
is not permitted to be fully enclosed for use as a bedroom.
Building Height
4. The maximum height of the development must not exceed 8 metres above the
finished ground level and the natural ground level.
Performance Bond
5. Security in the form of a cash bond or trading bank guarantee to the sum of $20,000
must be submitted to Council, to secure performance of all conditions of this
approval, prior to pre-start meeting. The cash bond or trading bank guarantee will be
returned on performance of the conditions of approval less any costs incurred by
Council in respect of enforcing performance of this permit. Council reserves the right
to call upon the bond or guaranteed sum to effect compliance with conditions.
Page 23 of 55
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.