2018-10-15 General Committee Agenda
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
GENERAL COMMITTEE MEETING AGENDA 15 OCTOBER 2018
ENGINEERING
External Works
26. Goodchap Street and Val Crescent must be upgraded for the length of their frontage
to the subject site. The works must be undertaken in accordance with an Operational
Works approval and must include in particular:
reconstruction of any damaged kerb and channelling;
construction of pedestrian footpaths in accordance with the conditions of this
Decision Notice;
removal of the existing property accesses and reinstatement of the kerb,
footpath and verge area to match the balance of the site frontage, including the
provision of topsoil and turf where the existing verge is grassed;
relocation/reinstatement of existing on-street parking bays required as a result
of development works;
linemarking for any potential additional on street parking spaces.
This Condition is imposed pursuant to s145 of the Planning Act 2016 being non-trunk
infrastructure and s128 being necessary trunk infrastructure identified by Council’s
LGIP to service the development.
27. The existing formation in Val Crescent must be upgraded from the existing formation
in Goodchap Street and extending to the tangent point in the kerb line adjacent to the
northern boundary of No 3 Val Crescent. The works must be undertaken in
accordance with an Operational Works approval and must include but not be limited
to:
works designed and constructed in accordance with Council’s Planning
Scheme Policy PSP 5 – Engineering Design Standards – Roads, Drainage and
Earthworks (section 3.19(d) – Industrial/Commercial – Local road);
the full width of the formation in Val Crescent;
reinstatement of existing linemarking.
This Condition is imposed pursuant to s145 of the Planning Act 2016 being non-trunk
infrastructure.
Bus Stop relocation
28. The bus stop and associated infrastructure must be relocated in accordance with
Translink’s requirements. These works must also include the installation of a new
shelter in accordance with Council’s standard drawings. In this regard please note
that Council has a contract with a 3rd party to manufacture and install bus shelters.
The developer must:
carryout adjustment works to the kerb line and/or road linemarking along the
new bus stop bay as necessary to achieve compliance with the applicable
standards for cycle lanes requirements. The works must be included as part of
the Operational Works application.
liaise with the bus shelter manufacturer/installer and create all necessary
conditions for their works (i.e. concrete slab, etc.);
advise Council of timing for the installation of the bus shelter and report as soon
as possible any changes to the programme.
This condition is imposed pursuant to s145 of the Planning Act 2016 being non-trunk
infrastructure. The relocation of the bus stop is only to facilitate the development and
therefore no offset of the Infrastructure Charges is applicable.
Page 8 of 55
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.