Skip to the record
For the highest quality transcripts.

Original source · versioned page text

DA Form 1

of 12

Page text shows just the words. Original shows the document exactly as it was published.

   ☐ Boundary realignment (complete 12)                               ☐ Creating or changing an easement giving access to a lot
                                                                        from a constructed road (complete 13)


   10) Subdivision
   10.1) For this development, how many lots are being created and what is the intended use of those lots:
   Intended use of lots created              Residential              Commercial              Industrial               Other, please specify:


   Number of lots created

   10.2) Will the subdivision be staged?
   ☐ Yes – provide additional details below
   ☐ No
   How many stages will the works include?
   What stage(s) will this development application
   apply to?

  11) Dividing land into parts by agreement – how many parts are being created and what is the intended use of the
      parts?
   Intended use of parts created             Residential              Commercial              Industrial               Other, please specify:


   Number of parts created

   12) Boundary realignment
   12.1) What are the current and proposed areas for each lot comprising the premises?
                                Current lot                                                                Proposed lot
                                                   2
   Lot on plan description              Area (m )                             Lot on plan description               Area (m2)



   12.2) What is the reason for the boundary realignment?



   13) What are the dimensions and nature of any existing easements being changed and/or any proposed easement?
   (attach schedule if there are more than two easements)
   Existing or               Width (m)        Length (m)        Purpose of the easement? (e.g.                     Identify the land/lot(s)
   proposed?                                                    pedestrian access)                                 benefitted by the easement




Division 3 – Operational work
Note: This division is only required to be completed if any part of the development application involves operational work.
   14.1) What is the nature of the operational work?
   ☐ Road work                                              ☐ Stormwater                          ☐ Water infrastructure
   ☐ Drainage work                                          ☒ Earthworks                          ☐ Sewage infrastructure
   ☐ Landscaping                                            ☐ Signage                             ☐ Clearing vegetation
   ☒ Other – please specify:                 Access driveway
   14.2) Is the operational work necessary to facilitate the creation of new lots? (e.g. subdivision)



                                                                                                                                              Page 5
                                                                                                           DA Form 1 – Development application details
                                                                                                                         Version 1.6— 2 August 2024
Log in to download the original file

DA Form 1.pdf · 579 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.