Original source · versioned page text
APPROVED Decision Notice OPW16/0189
Officer: Patrick Murphy Direct Telephone: 07 53296290 Our Reference: OPW16/0189 Your Reference: N/A 24 April 2017 Pile-It Pty Ltd PO Box 672 NOOSAVILLE QLD 4566 Dear Sir/Madam Decision Notice Sustainable Planning Act 2009 I refer to your application and advise that on 20 April 2017, Council decided to: A. Approve the application for the following reasons: 1. The existing works constructed are consistent with the Overall Outcomes of the Watercourses Works Code; and 2. The existing works constructed are consistent with the relevant Specific Outcomes in the Watercourses Works Code with respect to: Siting; Character and Amenity; and Design Construction and Safety 3. The existing works constructed are consistent with the IDAS Code for Prescribed Tidal Works. B. Approve the application subject to conditions. Details of the decision are as follows: application details Application No: OPW16/0189 Street Address: Jetty 290 Gympie Terrace, Noosaville Qld 4566 Real Property Description: Lot 159 CP 901988 Planning Scheme: The Noosa Plan (16 September 2013) Decision details The following type of approval has been issued: Development Permit for Operational Works Prescribed Tidal Works - Jetty Relevant period of approval The relevant period for this development approval is 2 years starting the day that this development approval takes effect. assessment manager conditions Development undertaken in accordance with this approval must generally comply with the approved plans of development. The approved plans are listed in the following table unless otherwise amended by these conditions. Plan No. Rev. Plan/Document Name Date 26159-S1 A Jetty Plan and Details June 2016 All structures associated with the development must be constructed wholly within the approved area Structures must be designed and constructed such that they are free standing within the waterway and are not connected to or behind the revetment wall or rock wall. Upon completion of works, a certification by RPEQ must be provided to Council in this regard. All structures must have no detrimental effects on stormwater drains and/or easements. The jetty and deck areas must be constructed in a manner to render the underside area vermin proof There must be no electrical reticulation system carrying electricity in excess of 24 volts beyond the revetment wall unless all switches and power outlets are positioned above the 1%AEP flood level. Lighting associated with the use must be designed, installed, operated, and maintained in accordance with Section 3 of AS4282 Control of the Obtrusive Effects of Outdoor Lighting. Wastewater and sullage must only be disposed of at approved pumpout facilities. The mooring facility must not be utilised for live-aboard purposes. Any construction and post construction activity is not to impact on the condition of the waterway, and is to be conducted so as not to breach the Environmental Protection Act EPA (1994) and the Environmental Protection (Water) Policy 2009. Certification by a Registered Professional Engineer of Queensland that states that the works have been constructed in accordance with best practice methods and are structurally sound must be submitted to Council. This certification must be submitted to Council within three (3) months of the date of this approval. A final inspection and approval of the structure by Council’s Inspector is also required. Please contact Council’s Planning Assessment Section (Development Audit & Response Officer 0428738563) to arrange the inspection. After completion, the proposed works must be maintained in a sound state of repair in accordance with the approved plans All necessary State government approvals relating to this development must be obtained. referral agencies The referral agencies applicable to this application are: Referral Status Referral Agency and Address Referral Trigger Response Concurrence SARA at DSDIP Level 3 Mike Ahern Centre 12 First Avenue, Maroochydore Qld 4558 Schedule 7, Table 2, Item 13—Tidal works, or development in a coastal management district Schedule 7, Table 2, Item 15—Tidal works, or development in a coastal management district The agency provided its response on 27 February 2017. (Reference No. SDA-0916-033767). A copy of the response is attached. Advisory notes The following notes are included for guidance and information purposes only and do not form part of the assessment manager conditions: General Advisory Notes That the Prescribed Tidal Works are to be used for the purpose of providing access to vessels and the ancillary lawful marine purposes conducted within the subject lease; That the approval makes it clear that operational works approval in no way sanctions the use of the decks for a Type 1 Food and Beverage Business (i.e. café with dining facilities for 10 or more people) or other uses requiring prior approval under the planning scheme Council has undertaken an audit check of the Operational Works drawings in relations to the proposed works. A detailed check of the calculations and drawings has not been undertaken, as they have been certified by a RPEQ. The RPEQ bears full responsibility for all aspects of the engineering design. Council reserves the right to require further amendments and/or additions at a later date should design errors become apparent. The approval or conditions do not absolve the owner of the land from complying with all the conditions of this approval and/or relevant Council By-Laws and Policies and/or relevant statues and/or statutory regulations in the execution and/or performance of said works. Council reserves the right to call up any performance bond held or levy charges against the property, should emergency works be required to be undertaken by Council to make the site safe due to inactivity on the development site for extended periods of time. Should any changes or modifications to the approved plans be required as a result of construction constraints, a “Request to change an existing approval” under the Sustainable Planning Act 2009 must be made. Amended plans clearly indicating the changes must be lodged with this application along with the appropriate fees. property notes Not Applicable preliminary approval overriding planning scheme Not Applicable further development permits required No Applicable self assessable codes The following codes for self-assessable development related to the development approval issued under this Decision Notice must be complied with. Not Applicable submissions Not Applicable reasons/grounds for approval Not Applicable RIGHTS OF APPEAL You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the Sustainable Planning Act 2009 is attached. During the appeal period, you as the applicant may suspend your appeal period and make written representations to Council about the conditions contained within the development approval. If Council agrees or agrees in part with the representations, a “negotiated decision notice” will be issued. Only one “negotiated decision notice” may be given. Taking this step will defer your appeal period, which will commence again from the start the day after you receive a “negotiated decision notice”. (Refer to Part 8 “Dealing with decision notices and approvals” - Division 1 “Changing decision notices and approvals during applicant’s appeal period” of the Sustainable Planning Act 2009.) OTHER DETAILS If you wish to obtain more information about Council’s decision, electronic copies are available on line at www.noosa.qld.gov.au, or at Council Offices. Yours faithfully Patrick Murphy Coordinator - Planning cc Unitywater SARA Enc: Referral Agency Response Approved Plans/Documents Appeal Rights Referral Agency Response SUSTAINABLE PLANNING ACT 2009 & SUSTAINABLE PLANNING REGULATION 2009 Appeal Rights SUSTAINABLE PLANNING ACT 2009 & SUSTAINABLE PLANNING REGULATION 2009 The following is an extract from the Sustainable Planning Act 2009 (Chapter 7). MATERIAL CHANGE OF USE, RECONFIGURING A LOT & OPERATIONAL WORKS Division 8 Appeals to court relating to development applications and approvals 461 Appeals by applicants (1) An applicant for a development application may appeal to the court against any of the following— (a) the refusal, or the refusal in part, of the development application; (b) any condition of a development approval, another matter stated in a development approval and the identification or inclusion of a code under section 242; (c) the decision to give a preliminary approval when a development permit was applied for; (d) the length of a period mentioned in section 341; (e) a deemed refusal of the development application. (2) An appeal under subsection (1)(a), (b), (c) or (d) must be started within 20 business days (the applicant’s appeal period) after— (a) if a decision notice or negotiated decision notice is given—the day the decision notice or negotiated decision notice is given to the applicant; or (b) otherwise—the day a decision notice was required to be given to the applicant. (3) An appeal under subsection (1)(e) may be started at any time after the last day a decision on the matter should have been made. 462 Appeals by submitters—general (1) A submitter for a development application may appeal to the court only against— (a) the part of the approval relating to the assessment manager’s decision about any part of the application requiring impact assessment under section 314; or (b) the part of the approval relating to the assessment manager’s decision under section 327. (2) To the extent an appeal may be made under subsection (1), the appeal may be against 1 or more of the following— (a) the giving of a development approval; (b) any provision of the approval including— (i) a condition of, or lack of condition for, the approval; or (ii) the length of a period mentioned in section 341 for the approval. (3) However, a submitter may not appeal if the submitter— (a) withdraws the submission before the application is decided; or (b) has given the assessment manager a notice under section 339(1)(b)(ii). (4) The appeal must be started within 20 business days (the submitter’s appeal period) after the decision notice or negotiated decision notice is given to the submitter. 463 Additional and extended appeal rights for submitters for particular development applications (1) This section applies to a development application to which chapter 9, part 7 applies. (2) A submitter of a properly made submission for the application may appeal to the court about a referral agency’s response made by a prescribed concurrence agency for the application. (3) However, the submitter may only appeal against a referral agency’s response to the extent it relates to— (a) if the prescribed concurrence agency is the chief executive (environment)—development for an aquacultural ERA; or (b) if the prescribed concurrence agency is the chief executive (fisheries)—development that is— (i) a material change of use of premises for aquaculture; or (ii) operational work that is the removal, damage or destruction of a marine plant. (4) Despite section 462(1), the submitter may appeal against the following matters for the application even if the matters relate to code assessment— (a) a decision about a matter mentioned in section 462(2) if it is a decision of the chief executive (fisheries); (b) a referral agency’s response mentioned in subsection (2). 464 Appeals by advice agency submitters (1) Subsection (2) applies if an advice agency, in its response for an application, told the assessment manager to treat the response as a properly made submission. (2) The advice agency may, within the limits of its jurisdiction, appeal to the court about— (a) any part of the approval relating to the assessment manager’s decision about any part of the application requiring impact assessment under section 314; or (b) any part of the approval relating to the assessment manager’s decision under section 327. (3) The appeal must be started within 20 business days after the day the decision notice or negotiated decision notice is given to the advice agency as a submitter. (4) However, if the advice agency has given the assessment manager a notice under section 339(1)(b)(ii), the advice agency may not appeal the decision. 465 Appeals about decisions relating to extensions for approvals (1) For a development approval given for a development application, a person to whom a notice is given under section 389, other than a notice for a decision under section 386(2), may appeal to the court against the decision in the notice. (2) The appeal must be started within 20 business days after the day the notice of the decision is given to the person. (3) Also, a person who has made a request under section 383 may appeal to the court against a deemed refusal of the request. (4) An appeal under subsection (3) may be started at any time after the last day the decision on the matter should have been made. 466 Appeals about decisions relating to permissible changes (1) For a development approval given for a development application, the following persons may appeal to the court against a decision on a request to make a permissible change to the approval— (a) if the responsible entity for making the change is the assessment manager for the application— (i) the person who made the request; or (ii) an entity that gave a notice under section 373 or a pre-request response notice about the request; (b) if the responsible entity for making the change is a concurrence agency for the application—the person who made the request. (2) The appeal must be started within 20 business days after the day the person is given notice of the decision on the request under section 376. (3) Also, a person who has made a request under section 369 may appeal to the court against a deemed refusal of the request. (4) An appeal under subsection (3) may be started at any time after the last day the decision on the matter should have been made. 467 Appeals about changing or cancelling conditions imposed by assessment manager or concurrence agency (1) A person to whom a notice under section 378(9)(b) giving a decision to change or cancel a condition of a development approval has been given may appeal to the court against the decision in the notice. (2) The appeal must be started within 20 business days after the day the notice of the decision is given to the person. [word/footer1.xml] Page 7 of 14 [word/footer2.xml] PO Box 141 P. (07) 5329 6500 [email protected] TEWANTIN QLD 4565 F. (07) 5329 6501 www.noosa.qld.gov.au Page 1 of 14 [word/header1.xml] OPW16/0189 [Attachment: image10.png (image text)] urreference: S0A-0916.093787 Yourreference: OPWIA/0189 Attachment 2—Reasons for decision to impose conditions ‘The reasons for this decision are: To ensure the development is carried out generally in accordance with the plans of development submitted with the application. To ensure landowners are aware they must take responsibility for their damaged property as they can impact on coastal resources and public safety. ‘To ensure the natural processes and the protective function of landforms and vegetation are maintained in coastal hazard areas. To ensure any disturbance to acid sulphate soils is managed to prevent impacts to coastal environments, To ensure that the development does not interfere with any existing aids to navigation. To facilitate the monitoring of the development works for compliance purposes. To ensure the development does not encroach on the navigable waterway in a way that impedes the safe passage of vessels. Deparment of rfastuchie, Local Goverment and Planing Page [Attachment: image11.png (image text)] Ourreference: SDA-0016-083767 ‘Yourreference: OPW16/0180 Attachment 3—Approved plans and specifications This page has been intentionally left blank. Deparment of nfasiucre, Local Govemment and Planing Page? [Attachment: image12.png (image text)] DRAWING SIZE ~ A2 Sie kinect aes pve crea ‘i ine tons 200 oR VSL (x) toate si ‘ont ity ang Voy = Sree NOOSA ROVER it TS) TRICAL seen & 2 PLANS AND DOCUMENTS referred to in the DEVELOPMENT APPROVAL, Approval no: $04.0916-033767 Date: 27 February 2017 Lot 159 ie 5 8° ‘SITE PLAN ys sons (SAUCE ONT ETAL Dra =| | "Oe I} C2) floor mas LeveuT . 100 Feo ne ne evn He ETT FRING SCHEDULE Sanna—i_}—f_frntst00 @ a2 Wa [ ara (3 | Sas cose ex @ | 2012091) aon 0 crs in| fino spr se CONSTRUCTION Godpseneuting sven Prlon sass se0e ran (07) sae sa0e Tier _Jety Ph and Daal Pree Boat He, Grrl Neos Done, 251965) A [Attachment: image4.png (image text)] a mm NOOSA COUNCIL [Attachment: image5.png (image text)] Queenstand Government Department of Infastuctue Local Government and Panning urreference: S0A-0916.093787 Yourreference: OPW18/0189 27 February 2017 ‘The Chief Executive Officer Noosa Shire Council PO Box 141 TEWANTIN QLD 4565 Dear Sir/Madam ‘Concurrence agency response—with conditions 290 Gympie Terrace, Noosaville QLD 4566 (Lot 159 on CP901988) (Given under secon 288 ofthe Sustainable Planning Act 2008) ‘The referral agency material for the development application described below was received by the Department of Infrastructure, Local Government and Planning under section 272 of the Sustainable Planning Act 2009 on 11 January 2017. Applicant details Applicant name: T-Boat Hire C/- Pile-it Pty Ltd Applicant contact details: PO Box 672 NOOSAVILLE QLD 4566 [email protected] Site details Street address: 290 Gympie Terrace, Noosaville QLD 4566 Lot on plan: Lot 159 CP901988 Local government area: Noosa Shire Council Application details Proposed development. Development Permit for Operational Works Prescribed Tidal ‘Works — Extension to an existing deck ‘SEQNerh Region Level Mike Ane Baling ‘2 Frst verve FO Bor 1129 Maroochydore QLD 4858 [Attachment: image6.png (image text)] Aspects of development and type of approval being sought Nature of ‘Approval Brief Proposal of Tevel of Development Type Description Assessment Operational Work | Development | Extension to existing deck to_| Code Assessment permit provide safe access and waiting area for boat hire and ferry customers Referral triggers ‘The development application was referred to the department under the following provisions of the Sustainable Planning Regulation 2009: Referral trigger Schedule 7, Table 2, Item 13—Tidal works, or development in a coastal management district Schedule 7, Table 2, tem 15—Tidal works, or development in a coastal management district Conditions Under section 287(1)(a) of the Sustainable Planning Act 2009, the conditions set out in Attachment 1 must be attached to any development approval Reasons for decision to impose conditions Under section 289( 1) of the Sustainable Planning Act 2009, the department must set out the reasons for the decision to impose conditions. These reasons are set out in Attachment 2. Approved plans and specifications ‘The department requires that the following plans and specifications set out below and in Attachment 3 must be attached to any development approval DrawingiReport Title | Prepared by Date Reference | Versionilssue no. ‘Aspect of development: Operational Work Jey plan and detall ‘SCG Consulting | T0701 | 2IESST [A Engineers Fomm 15— Compliance | Sean Richardson, | 120072016 | - Cerificate for building ‘SCH Consuiting design or specifications | Engineers ‘A copy of this response has been sent to the applicant for their information, For further information, please contact Candace Mitchell, Senior Planning Officer, SARA SEQ North on (07) 5352 9708, or email SEQNorthSARA@dilgp ald gov.au who will be pleased to assist. Deparment of rfastuchie, Local Goverment and Planing Page2 [Attachment: image7.png (image text)] Garth Nolan Manager (Planning) cc: T-Boat Hire Ci File-t Pty Lid, [email protected] fenc: Attachment {Conditions to be imposed ‘Attachment 2—Raasons for decision fo impose conditions: ‘Attachment 3—Approved plans and specifications “Department of Infrastructure. Looat Government and Planning Paced. [Attachment: image8.png (image text)] urreference: S0A-0916.093787 Yourreference: OPWIA/0189 Attachment 1—Conditions to be imposed ‘Conditions Condition timing ‘Operational Work ‘Schedule 7, Table 2, Item 13—Pursuant to section 255D of the Sustainable Planning Act 2009, the chief exe ‘ecutive administering the Act nominates the Director-General of Department of Environment and Heritage Protection to be the assessing authority for the de velopment to which this development approval relates for the administration and enforcement of any matter relating to the following condition(s) 1 The development must be carried out generally n accordance with the following plans: ‘+ Jetty plan and detail prepared by SCG Consulting Engineers dated 12/07/2016, reference Drawing no 28159-S1 and revision A, ‘At all times. Ga) The works are to be atlached to the land the subject oF this approval (b) Should the works become detached the registered landowner(s) shall be responsible for the collection and removal of all debris at their own expense. ‘At all times. “Sand must not be removed from the erosion prone area, and any ‘sand excavated from the site must be placed on the beach, ‘seaward of the work, ‘At all times. ‘As a result of works the subject of this approval any disturbed or oxidised acid sulfate soil must be treated and managed in accordance with the current Queensland Acid Sulfate Soil Technical Manual: Soil management guidelines, prepared by the Department of Science, Information Technology, Innovation and the Arts, 2014. ‘At all times. ‘Schedule 7, Table 2, Item 15—Pursuant to section 255D of the Sustainable Planning Act 2009, the chief exe and Mai ‘ecutive administering the Act nominates the Director-General of Department of Transport in Roads to be the assessing authority for the development to which this development ‘approval relates for the administration and enforcement of any matter relating to the following ‘conditior nls): 5. The development must be carried out generally n accordance with the following plans: ‘+ Jetty plan and detail prepared by SCG Consulting Engineers dated 12/07/2016, reference Drawing no 28159-S1 and revision A, ‘At all times. ‘Any navigational aid that is damaged due to the construction, ‘operation or maintenance of the approved development must be ‘promptly repaired or replaced at the applicants cost. In the event that any damage is caused to any aid to navigation, the Harbour ‘Master must be immediately contacted on 07 3305 1700. ‘At all times. “As Constructed" drawings of the approved structure must be provided to Regional Harbour Master (Brisbane) - Address below. Regional Harbour Master (Brisbane) ‘Maritime Operations Base Within two (2) weeks of the development approval ‘commencing, Deparment of rfastuchie, Local Goverment and Planing Page [Attachment: image9.png (image text)] No. _ | Conditions Condition timing ‘Macarthur Avenue East Pinkenba QLD 4008 & {@) Any debris or similar obstruction encountered whilst ‘At all times. ‘undertaking the work must be disposed of at the applicant's cost. (b) All piles andior structures to be demolished, both above and below the waterline must be completely extractedlremoved Deparment of rfastuchie, Local Goverment and Planing Pages
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.