APPENDIX P

Certification Assessment
Prepared by

Catchpole Building Services

743 Ann Street, PO Box 1559, Fortitude Valley QLD 4006 Phone 07 3237 8899 Facsimile 07 3237 8833

Page 45 | 20517_PiReport_FINAL_FW MC.doc
Full text of the other 24 pages

Page 2

Catchpole Building Services:

compliance~assess~table~perigian

 

 

 

ESSENCE AT PERIGIAN

“COMPLIANCE ASSESSMENT REPORT”

RE: THE BUILDING ACT 1975
THE BUILDING REGULATION 2006
BUILDING CODE OF AUSTRALIA 2007

Prepared By:

CATCHPOLE BUILDING SERVICES

CONSULTANT BUILDING SURVEYORS
Rev 1 — 29" of May 2007

REFERENCE:
CATCHPOLE BUILDING SERVICES
Mark J. Catchpole M.a.1.B.s
Masters in Applied Science “Fire Safety Design”
Grad. Dip. Applied Science (Building)
58 AbbeyStreet,
Forestdale. Qld 4118
Ph. 3800 1262

 

 

Mark CATCHPOLE

 

Page 3

Catchpole Building Services: compliance~assess~table~perigian

Compliance assessment Table:

 

 

 

 

ADDRESS: David Low Way Perigian
Project: Proposed commercial and residential development
ASSESSMENT COMMENTS otes/ Tasks
UILDING ATTRIBUTE STATUS
Building status Preliminary uilding design development phase reliminary documentatio
assessment lodged for skeletal

compliance assessment.

  
   
 
   
   
   
 
   
 

he real property descriptio:
n the site appears to be fo
separate parcels of land.

The proposal appears to be erected over several parcels o
land.

 
 

The term ‘Fire Source Feature” applies to both allotment§fThe commercial developmen
oundaries and other buildings erected upon the sameflappears to be erected hard up|
allotment gainst a rear allotmen
oundary. See protection o,
enings section of thi

he development proposa
ill need to consider the}
onfiguration of the
llotments in relation to the|
ositioning of the buildin:
nd the respective openings.

he commercial precinc
nclosed carpark appears to
interface with the residential]
recinct carpark.

f the allotment boundary between the commercial precinc
land the residential precinct remains then a fire rated wal
along the allotment boundary for each building is require:
land no openings permitted in that alignment.

 

 

Mark CATCHPOLE

Page 4

Catchpole Building Services:

compliance~assess~table~perigian

 

 

 

   
   
  
  

he decision needs to be}
ade as to whether or not to}
malgamate (reconfigure) the
llotment boundaries eithe.
s one parcel of land or to
fire separate each parcel fro

he other where buildings are

   
   
   
  
 
   
  
  
   
  
  

he development is considered to have the following buildin
configurations:

(Commercial precinct: Is one building made up of low ris
icommercial/retail and carparking

Residential precinct:

Single detached class la dwellings S 1 — S31 are each
separate buildings.

The residential apartment blocks sit upon the carpark sla
lover.

he footprint of the carpar!
oof slab is not uniform an
here are sections removed to}
llow for the swimmin
ools etc to be open to the}
sky.

his aspect provide fire}
nd not considered as a full

fire rated roof over an open}
eck carpark.

 

Mark CATCHPOLE

Page 5

Catchpole Building Services:

Site Circulation

compliance~assess~table~perigian

   
  
   
   
  
   
   

     
   
   
  
   
 
  
  
   
 
   
   

he residential blocks are configured and designed that the

he elevated walkways|
eed to be considered separate FIRE COMPARTMENTS.

ridge between the buildings.

f the determination by the regulatory authority havin
jurisdiction determines them one building with man
parts each residential portion is a _ separate fir
compartment to the adjacent part.

he spatial criteria fo
penings in separate fire
ompartments is essentiall
he same as if they were
separate buildings.

Applicable here is site circulation issues to deal with on_ this

development.

he plans show that there is to be an elevated pedestrian]
alkway between the Commercial precinct and th
Residential precinct.

f the site is to be separate allotments we believe that
easements and agreements will need to be in place to allo
site circulation, easements of support of structures etc.
support of adjacent

hese sort of agreements}
sually require Council as
hird party to the agreements
o ensure their perpetuity.

The integrating of site circulation and vehicular movemen
etc. may impact upon the Councils deliberation over th
development they may insist on the development being o
lone parcel of land.

 

Rise in Storeys

 
  
 

Varies from building to}
building

 

‘The commercial precinct has a building with a rise in storeys|

he commercial precinc
lof three

ttract Type B fire resistan|
Construction.

 

   

 

 

Mark CATCHPOLE

Page 6

Catchpole Building Services:

Fire Source Features identified

 

compliance~assess~table~perigian

The class la residential dwelling (cabins) have a rise i
storeys of three)

  
 
 
  
  
    
 
   
 
   
   
 
 
  
  

he class 1a dwelling do no
ttract fire rated construction

he residential unit buildings Class 3 have a rise in storeys|

he class 3 buildings attrac’
arying from Three to Four.

ype <A _ fire — resistan
onstruction.
development _ strateg
eeds to be cognisant of th
exposure to fire ove
llotment boundaries.

Yes here are significant non compliance issues with the exposur:
o “Fire source features” in this current development concept.

he current design does no
larify if the site is to be
malgamated into one parcel
f land.

t is assumed it won’t so as to|
aximise the developmen
otential for future sale.

herefore the current desig:
roposal in relation to th
rientation of the commercial]
evelopment site access an
egress relies upon anothe
arcel of land which is a fire}

 

 

Mark CATCHPOLE

Page 7

Catchpole Building Services:

compliance~assess~table~perigian

 

 

Buildings:-

Yes

   
  
 
     
  
 
  
  
 
   
 
 

The class 1a buildings on the allotment need to be at leas
1800 mm apart so as not to attract a fire resistance level]
(FRL) of the external walls.

    
  
 
   
 
 
 
  
  

efer clause C3.2 of th
CA. The building is Type Al
onstruction therefore all
external loadbearing walls}
re required to be fire rated

The class 3 buildings need to be at least six metres apart so
hat the openings in the external walls required to have a FR.
fare at least six metres apart.

(The class 7a carpark portions and the class 5/6 commercia
ortions are required to be fire rated when within six metre:
lof another building on the same allotment

f the site is amalgamated
hen the commercial precinc
eeds to be adequately fire|
separated from the othe
uildings on the sam

f the site is not amalgamated
hen each building requires
fire rated wall to be erected
pon the allotment boundary.

 

Boundaries:-

 

Yes

he issue of  allotmen
oundaries needs to be
ddressed before the final
sign development can
ccur as it will affect the

llotment boundaries

  
   
   
 

   
  
  
  
   
 

he shape of the allotment boundaries needs to consider the§As the enclosed carpark o:
osition of each buildings openings in relation to thejthe commercial precinct
allotment boundary they face. eeds to empty west then th

 

 

Mark CATCHPOLE

Page 8

Catchpole Building Services:

compliance~assess~table~perigian

 

llotment boundary needs to
e 3 m west of that openin:
So as not to require a Fire}
ated opening.

   
 
 
  
  
 

Similarly the Opening in the|
esidential precincts open]
eck carpark need to be 3
way from the allotmen
oundaries also.

 

 

 

 

   

 

 

 

Building Classification/s Applicable ‘The stand along cabin type dwelling are class la
he apartment buildings are class 3
he open deck carpark is class 7a
he enclosed carpark is class 7a
he commercial portions above can be class 5/6.
Heritage Significance Nil
ype of Construction/s Type B he commercial development is Type B Construction due toffRefer Clause C1.2 of the}
(commercial) he rise in storeys of three and class 5 or six will be the use on§BCA
the upper storey of that building.
Type A ‘he class 3 buildings will be Type A Construction as theirRefer Clause C1.2 of the
(Residential) ise in storeys are four with some building being 3. CA
Detached Dwellings {The detached dwellings do not attract a Type of Construction They are to be assessed unde
olume 2 of the BCA
Idg. > 6 Storeys or 25M No omplies
nited Building No [The elevated walkways do not constitute connection offfTherefore the _ elevated|

 

 

 

 

Mark CATCHPOLE

Page 9

Catchpole Building Services:

compliance~assess~table~perigian

 

   

lopenings in the external walls of the buildings. alkways merely provid

ccess between buildings.

 

Floor Area Limitations

Large Isolated Building

 

Applicable

Commercial

Residential

    
    
    
   
  

he commercial precinct has floor area limitations i
accordance with clause C2.2 of the BCA
12000 m? & 12,000 m’ class 7/8 portion

he Class 5 portions have
floor area and  volum
limitation 5500 m? and
olume limitation of 33000)
a

he Class 6 /7a portions have}
500 m? and 21000 m? floo
rea and volume limitations.

3000m? & 18000 m3 Class 5 portion

he limitations can b
lassessed on a prorata basis}
etween classifications t
letermine the overall floo
larea and volume limitation o
he fire compartment.

he class 3 portions and the class la dwelling do attract
floor area or volume limitation.

he class 7a open deck carpark does not attract a floor area o
volume limitation. See Clause C2.1 of the BCA.

he class 1a buildings do not have a floor area limitation

he building is not a large isolated building provided th
commercial building is a separate fire compartment to th
esidential carpark portion.

 

Mark CATCHPOLE

Page 10

Catchpole Building Services:

compliance~assess~table~perigian

 

Fire Compartmentation

Applicable

    
 
 
  
   
  
  
  

‘he whole building can be assessed as one fire compartmen
las it attracts type B construction. However the carpar'
ortion which is required to be sprinkler protected will nee
ito be 120/120/120 FRL fire separated from the balance of th
on sprinklered building otherwise the rest of that buildin:
ill require sprinkler protection.

Commercial precinct

he class 3 buildings and the carpark each will require fir
icompartmentation storey by storey as the buildings attrac
[Type A fire rated construction.

Residential precinct

[The buildings need to be spaced sufficient distance apart so a:
ot to attract fire rating of the openings in the external wall:
lof the opposing fire compartment.

Recommend that the Class 7
arpark be constructed as
separate fire compartment t
hat of the class 5/6 portions
lbove so as not to require}
sprinklers in those classes.

6 m spatial distance between
openings in external walls i
equired. So as not to driv
he need for fire rate
openings.

 

Fire Resistance Levels

 

Applicable

   
 

able 4 of Specification C1.1
il FRL’s for floor laid directly on the ground.
External loadbearing walls < 18 m from FSF attract a FRL

Commercial Precinct

External non-loadbearing walls < 3 m from a FSF attract
IFRL.

Imasonry.
Internal non loadbearing walls do not attract a FRL.

Internal loadbearing walls and columns are to be concrete o

 

Mark CATCHPOLE *

Page 11

Catchpole Building Services:

compliance~assess~table~perigian

 

 

 

Residential precinct

The roof needs to be non-combustible.

The fire stairs if connecting three storeys needs to be fir
isolated and fire rated from the balance of the building.

The lid of the fire isolated Stairs needs to be fire rated i
laccordance with clause 2.7 of Specification C1.1 of the BC
lat the same rating as the walls of the stair shaft.

The floor between the class 7a sprinklered enclosed carpar
land the class 5/6 portion above needs to be 120/120/120 FRL

Walls erected on the boundary are to be fire walls.

Table 3 of Specification C1.1

INil FRL’s for floor laid directly on the ground.

All External loadbearing walls attract a FRL

|All external loadbearing columns < 3 m from a FSF attract
FRL

|All Loadbearing (LB) internal walls attract a 90/90/90 FRL

Internal (NLB) walls bounding lift and stair shafts attract
-/90/90 FRL
Internal NLB walls bounding SOU’s attract -/60/60 FRL

Internal (NLB) walls Bounding public corridors and the lik
attract -/60/60 FRL

LB Walls bounding shafts attract 90/90/90 FRL NLB wall
attract -/60/60 FRL.

Floors attract 90/90/90 FRL

B Walls bounding — th
SOU’s are to be 90/90/90
IFRL. In addition th
onfiguration of the units
llows for sub tenancies from
ime to time. These areas
ill also need to be treated as
alls bounding a SOU.

 

 

Mark CATCHPOLE

Page 12

Catchpole Building Services:

compliance~assess~table~perigian

 

 

Roofs receive a concession under clause 3.5 of Specificatio:
C1.1 provided it is non-combustible.

 
 
 

 

  
 
  

 

   
 

 

 

Vertical Separation Applicable The Class 3 apartment buildings attract Type A construction§The Commercial precinct o
therefore clause C2.6 of the BCA applies to the openings inffType B construction does no
the external walls between storeys. rigger clause C2.6 of th

CA.

Separation of Equipment Applicable Ensure switchboards are enclosed in non-combustible cabine
lor cupboard with smoke seals on the doors.

Protection of Openings Applicable (Openings in floors which require a FRL are to be protected i

 

 
  
  
    
   
    
  

accordance with Clause C3.12 of the BCA and clause C3.15.
Openings in fire rated shafts are to comply with Clause C3.13

Openings for services installations are to comply with claus’
(C3.15 and Specification C3.15 of the BCA

Openings in external walls are to comply with Clause C3.2 0
he BCA.

Openings within 1.5 m of a FSF are prohibited in both thi
commercial precinct and the residential precinct.

he doors to the SOU’s are to be protected in accordanceffThe doors in the residential
ith Clause C3.11 of the BCA. recinct are to be -/60/30 Sel
Closing fire doors.

he configuration of the uni
allows for sub tenancies fro.
ime to time those sub
enancies will be deemed aj

 

 

Mark CATCHPOLE

Page 13

Catchpole Building Services:

compliance~assess~table~perigian

 

SOU for the duration of tha
enure therefore the doors to}
hose areas also need to bi

reated as a door bounding
SOU.

 

umber of Exits

(Travel Distances

 

   
    
 
 
  
  
 
  
   
  
 
  

Applicable
Commercial precinct [Ensure adequate exits so that no part of the floor is greaterfEach storey requires at leas

han 40 metres from one of two or more exits. wo exits.

he enclosed carpark storey requires at least two exits due t
travel distances exceeding 20 m to an exit.

Residential precinct [Each building is required to have at least one exit per storey. JThe current exi

onfiguration does no
omply as persons are
equired to travel along
ath of travel to an exit.

he open deck carpark is to have at least two exits from th
storey.

Applicable
Commercial precinct The ground floor of the class 7a carpark will require to exit:
ito permit a travel distance of 40 metres to open space.

point of choice is required before 20 m has been travelle
hen exiting along that path of travel.

he Street level Class 5 and 6 shops receive a concession t
lallow a single exit to be 30 m from the remotest part of th
storey. If this aspect does not comply more than one exit i
equired from the storey.

 

Mark CATCHPOLE

Page 14

Catchpole Building Services:

compliance~assess~table~perigian

 

 

Residential precinct

 
 
   
   
  
 
 
   
  
  
  

he discharge of the carpark level into the foyer of the uppe
ground level is permitted as it complies with clause D1.9 0
he BCA and a further 20 m is permitted from the top of thos:
stairs to open space.

The upper level maximum travel distance to the top of th
lexit stair is 40 m as there is two exits provided.

additional 20 m travel distance is permitted in accordanc
with clause D1.9 from the bottom of the exit stair to ope
lace.

(The maximum travel distance from a door of a SOU to an exi
lor to a point of choice to two or more exits is six (6) m.

e y building pods only have exits on half of the pod.

The lobby outside the SOU’s are required to be fire rate
lhowever cannot be deemed a Fire Isolated passageway for th
following reasons.

 
  
 
 
 
 
  
  
   
  
    
    
  
  
    
 

he current exi
onfiguration does no}
omply with the BCA.

he plans indicate that there]
lare instances where the door
o sub tenancies can b
SOU’s the travel distances|
UST be measured from}
hese points as this is th
ost adverse travel distance|
ombination.

SOU’s door is no
ermitted to open directl
into a Fire isolate
assageway, fire isolate
stairway refer clause D1.7.

in addition the requirements}

 

Mark CATCHPOLE

Page 15

Catchpole Building Services:

compliance~assess~table~perigian

 

 

f Clause E2.3 and Table}
2.2a “FIRE ISOLATED)
XITS” of the BCA woul
rigger smoke pressurisation
f the fire isolated|
assageway as more than 2
loors open into it.

 
   
   
  
   
   
   
    

 
   
 
 
   
   
   
 
 

he resolution of the above}
roblem is that fire exit stairs
e relocated so that no travel}
istance exceeds 6 m from|
he door of any SOU to a exi
r a point of choice to two o
ore exits on that storey o
hat building.

See also construction o
lexits

 

   

 

idths of Exits Applicable isles are to be a minimum 1000 mm wide.
IDoorways are to be a minimum of 750 mm clear openin,
width
he PWD accessible units are to have doorways which are ai
least 800 mm clear when fully open.
Construction of Exits Applicable

 

Commercial precinct

    
  
 
  

    

s the rise in storeys of the commercial precinct is three an
stair that passes through or by three storeys is required to b
fire isolated.

s the stair configuratio
nly connects two storeys
aximum the stair do no
eed to be fire isolated.

owever the walls to the
stair shafts if loadbearing wil

 

 

Mark CATCHPOLE

Page 16

Catchpole Building Services:

compliance~assess~table~perigian

 

 

e required to be fire rate
nder the provisions of p:
IC of the BCA.

  
    
  
 

    
   
 

he room formed under the upper storey exit stair is to befRefer Clause D2.8

60/60/60 FRL rated with a self closing fire door fitted.
Residential precinct [The exit stairs to the Class 3 buildings are required to be fir
isolated as the rise in storeys exceeds 2 + 1 extra storey of ca
laccommodation.

Some of the buildings have al
ise in storeys of four.

 

(Handrails and Balustrades

   
  
   
  

    
   
  
  
  
  
 
 
  
 

Applicable
Commercial precinct [The exit stairs are to be fitted with handrails in accordanc

with clause D2.17 of the BCA.

he external balconies walk ways and the like are to hav
alustrades which comply with clause D2.16 of the BCA.

Where persons can fall more
han 4 m the balustrade mus
ot facilitate person:

Residential precinct
in accordance with clause D2.16 of the BCA and maximu
spacing of 125 mm.

he balconies walkways and the like are to have handrails}
nd balustrades in accordance with Clause D2.16 and mus
ot facilitate climbing where persons could fall more than

 

 

 

Pool Fencing Applicable Pool Fencing is to comply with the Building Act 1975 and AS
1926.

Number of Occupants

Firemains Applicable The fire mains will be required to be provided to serve th

 

  
 

uilding in excess of 500 m?a ring main as the project is
large isolated building

 

 

 

Mark CATCHPOLE

Page 17

Catchpole Building Services:

iPumpsets / Boosters

Fire Hose Reels

compliance~assess~table~perigian

Applicable

  
  
  
  
   
 
   
 
  

Commercial precinct [Fire hydrants are required as the building is Greater than 50

2

  
 
  
 
  
 
 
  
 
   
 

Sprinkler booster and pumps et required as the carpar!
equires sprinkler protection.
Residential precinct ooster assembly is required as the fire compartment exceeds|
2000 m? and there will be more than two external fir
ydrants serving the building.

he sprinkler system will require pumps and_booste!
assembly.

Applicable
Commercial precinct

s the floor area exceeds 500 m? Fire hose reel/s will be

equired on each store
ithin 4 metres of exits.

Residential precinct The carpark area and the external areas of the podium andfThe BCA gives a concessio!

alconies etc of the unit blocks will require hose reelfffor hose reel coverage not tof
e required within SOU’s.

he laundries and th
common areas and common
itchens will require hose}
eel coverage.

 

ire Hydrants

 

Applicable s the floor area exceeds 500 m?

   

Commercial precinct The fire mains and the fire hydrant system needs to b

separate from that of the residential precinct as it is a separat

 

 

Mark CATCHPOLE

Page 18

Catchpole Building Services:

compliance~assess~table~perigian

 

 

Residential precinct

arcel of land.

The site configuration dictates a mixture of internal attac
hydrants and external feed/ attack hydrants.

‘The upper level may require dedicated fir hydrants if not abl

0 be served by an external hydrant.

he site configuration dictates a mixture of internal attac
ydrants and external feed/ attack hydrants.

he upper levels may require dedicated fir hydrants if no

lable to be served by an external hydrant.

xternal fire hydrants ma’
eed to be nestled up agains
he external wall of th
uilding shielded b
90/90/90 FRL fire rated
anels as per AS 2419.1.

ote: Fire rated panels are}
mly required by AS 2419.1
0 be 4 m wide x 3 m tall.

 

 

 

Protection Essential Services Applicable If electric pumps are used essential supply will be required tofDepending upon the pump}
that Special fire service. configuration essential
supply to this building woul
ot normally be required.
Sprinklers Applicable
Floor area limitations Not Applicable

 

Storage height

Not Applicable

 

Building height

Not Applicable

 

Enclosed Carparks

 

Applicable

As the enclosed carpark in the commercial precinct excess o

0 motor vehicles then the area MUST be served b
automatic fire sprinklers.

 

 

Mark CATCHPOLE

Page 19

Catchpole Building Services:

Smoke Hazard Management
Fire and Smoke Alarms

compliance~assess~table~perigian

   
   
  
 
 

Applicable

Applicable emporal tones are th

urrent requirement unde
S 1670.

 
   
  
  
    
   

Commercial precinct The building is to be fitted with smoke detection and ala
system in accordance with Specification E2.2a as it is
uilding in excess of two storeys in rise with class 5 and class
6 parts.

he sprinkler system requires a Building Occupant Warnin
System (BOWS) in accordance with AS 2118.1 criteria to AS
1670 tonal requirements.

Smoke detection and alarm System is required in accordanc
ith Specification E2.2a

Residential precinct

Smoke alarms are required to be installed in accordance wit!
S 3786 and clause 3.7.2 of the BCA Volume 2.

Class 1 buildings

 

triums
ort. Fire Extinguishers

ire Control Centres

Mark CATCHPOLE

 

Not applicable

Applicable Install appropriate fire extinguishers.

 
 
  
   
 

   
 
 
 
 
  

Commercial precinct
ire extinguishers should be

located adjacent fire hose|
eels and area of identifie
isk. Refer Clause E1.6 of the}
CA.

Required in accordance with Table E1.6

Fire extinguisher coverage is required outside the Class 3§Some specific workplace|
SOU areas which includes the common Kitchens , laundries{fsafety criteria will dictate fire}

land the associated class 7a carpark xtinguishers to be installed
o AS 2444.

Residential precinct

N/A ot required as the building is less than 25 m effective heigh

Page 20

Catchpole Building Services:

compliance~assess~table~perigian

 

 

land less than 18,000 m?

 

 

    

 

  
    
 
 
   
   
 
  
  
 

   
  
 
  

 

     

 

     

 

 

Special Fire Hazards N/A The building is not considered to be a special hazard unde:
clause E1.10.
Lifts Applicable
Commercial precinct §Lift access is provided to all levels. Disabled persons
accessibility is to comply on all levels with part D3 and Pai
F3 of the BCA
Residential precinct Lift access is required to the levels in which access isThe DDA is a separate form]
rovided for person with disabilities in the class 3 units. f commonwealth legislation}
d must be considered in th
esign. However is outsid
ur jurisdiction under th
uilding Act 1975.
he BCA 2007  requires|
equitable and _ dignifie
ccess to and withi
uildings. This aspect can b
et by complying with th
TS provisions of the BCA
art E3.
Emergency Lighting Applicable s the building exceeds 300-m? emergency lighting and exi
signage is required.
Exit Signage Applicable Ensure sufficient directional exit signage is installed so thatfJApplicant to demonstrate}
loccupants can always see at least two exit routes ompliance achieved
E.W.LS N/A
Access for Disabled Applicable

 

   

 

 

Mark CATCHPOLE

Page 21

Catchpole Building Services:

compliance~assess~table~perigian

 

 

 
 
 
  
  
 
  

  
 
 
  
  
   
 
 
 

Commercial precinct efer Clause D3.2 and Table

ID3.2.

ccess is required to the main entrance of the building and to
all levels providing access via a lift...

he passenger lift will need to comply with PWDgRefer Clause E3.6
accessibility requirements.

Tactile and ground surface indicators are required for publi
accessible portions as per clause D3.8

he sub tenancies create
ditional SOU numbers
herefore the PWD accessibl
ISOU’s numbers need to b
eflected in based on th
aximum total SOU’s|
pplicable at any one time.

Residential precinct The class 3 unit development requires PWD accessible SOU’s

in the number as scheduled in table D3.2.

 

 

 

  

   
  
  

 

 

Number of Employees TBA
Employee Facilities The facilities for male and female will be based upon th
written advice from the owner as to the population number:
land gender split.
Refer Table F2.3 for facility numbers
atron Facilities Applicable art of staff facilities
isabled Facilities Applicable

 

   
  
 
 

Commercial precinct [PWD facilities are to be provided in accordance with Tabl
IF 2.4
One Unisex disabled person toilet facility is provided on th

ground floor.

  

his would imply that wheel chair bound staff in the uppe

 

 

Mark CATCHPOLE

Page 22

Catchpole Building Services:

compliance~assess~table~perigian

 
  
   
 
 
  
 

level office area are compelled to catch the lift to use thei
oilet facility.

actile and Braille signage is required to this facility i
accordance with clause D3.6 and Specification D3.6 of th
BCA

Residential precinct [The PWD facilities are required to be provided in the PW.

accessible SOU’s in accordance with Part F2.4

 

ight and Ventilation

Applicable

Commercial precinct
mixture of natural and A/C ventilation is provided

mixture of natural lighting and artificial lighting is to b
rovided.

    
   

Residential precinct atural ventilation is required to all bedroom in the class 3

ortion.

ir flow paths are required to meet pat J requirements

 

  
 
 
 

 

echanical Ventilation Applicable The air Handling system to the offices and conditioned space:
ust comply with AS 1668.2.
echanical ventilation of the Sanitary facilities are to be at
ate of 10 I/s//m? in accordance with AS 1668.2
Carpark Ventilation Applicable

Mark CATCHPOLE

 

 
 
  

Commercial precinct {Comply with AS 1668.2 for the ventilation requirements o:

the enclosed carpark. The standard has criteria for natura!
entilation limits.

he geometry of the carparl
ppears to dictate that

arpark

mechanical

Page 23

Catchpole Building Services:

compliance~assess~table~perigian

 

 

 
   
  
  
 

entilation system will b
equired to comply with AS|
1668.2.

   
  

Residential precinct [The open deck carpark can be naturally ventilated provided i
ican meet the criteria as listed in AS 1668.2 for cross

ventilated carparks.

 

Sound Transmission and insulation

Applicable

   
 
  

Residential portions ote Qld Appendix F5 is
pplicable and do not use th

ain BCA Part FS.

   

he sub tenancies are also SOU’s when in use therefore mus'
be sound insulated from the adjacent areas in accordance wit
Qid F5.

 

Theatres Stages and Public Halls

 

N/A

 

orkplaces

 

   

   
   
 
   

Applicable he workplace criteria of QDC 1 are applicable to th

uilding.

pplicant to demonstrate}
compliance achieved

Clarify if the staff is required to wear specific apparel for th
carrying out of their duties. If so compliance with clause AY
lof QDC 1 will be required.

We have assumed at this stage that the building is not subjec
to wash down or spillages associated with the workplac

standard for waterproofin;

 

Mark CATCHPOLE

Page 24

Catchpole Building Services:

compliance~assess~table~perigian

 

 

ae etc. f

 

Energy Efficiency

Applicable

 

he provisions of Part J will apply to the building.

 
 
    
  
 
 
   
  
 
 
   
  
   
    
   
   
 

The class 3 portion of the building is a conditioned space.

he class 5/6 portions of the building are also required to be designed to be a conditione
pace.

The class 7a carpark portions are not conditioned spaces.
Part J1, J2, J3, J4, J5, J6, J7 and J8 apply.

Ensure methods of compliance are documented on plans together with appropriate competen
erson certification.

1: Generally:
Roof / ceiling to conditioned space requires R3.2
Walls to the conditioned space require compliance with clause J1.5 and Table J1.5b option

(d)

2: Generally

dentify which glazing method to be used.

dentify the aggregate glazing conductance and solar heat gain limits
Identify what extent of shading is required.

3: Generally
Identify the means of compliance of building sealing to the conditioned space.

4: Generally
dentify the building air movement to those areas not being served by Air Handling systems|

o Part F4 and J5 requirements.

5: Generally

 

 

Mark CATCHPOLE

Page 25

Catchpole Building Services:

compliance~assess~table~perigian

 

 

Demonstrate hours of operation of the system design for mechanical ventilation and ai
andling systems.

[Demonstrate the extent of insulation of ductwork

Limit reheating and Not mixing heated with cooled air.

[Time switching is to be demonstrated in accordance with J5.3

Heating and chilling systems are to demonstrate compliance with J5.4

Workshop exhaust needs to be clarified if considered a miscellaneous exhaust system for the
urposes of part J.

  
 
 
  
 
   
   
 
 
 
   
   
 
  

6: Generally

Identify the w/m? for each use and space. These would be best shown on a table on the plans
Identify on the plans the methods of complying with Clause J6.3 artificial lighting and powe
control.

Demonstrate interior and decorative lighting complies with J6.4

Demonstrate compliance with exterior lighting to J6.5

Demonstrate compliance of boiling water and chilled water services with J6.6

7: Generally
emonstrate Hot water supply complies with J7.2

8: Generally:
emonstrate accessibility for maintenance for plant , equipment and components that require}
aintenance in accordance with Part I2

 

 

Mark CATCHPOLE

Used in these records

About this file

File size
9.0 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

20517 App P.pdf [As Published].pdf · 9.0 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.