Council archive · source document
20517 App P.pdf [As Published] · 132007.1259
Catchpole Building Services:
Site Circulation
compliance~assess~table~perigian
he residential blocks are configured and designed that the
he elevated walkways|
eed to be considered separate FIRE COMPARTMENTS.
ridge between the buildings.
f the determination by the regulatory authority havin
jurisdiction determines them one building with man
parts each residential portion is a _ separate fir
compartment to the adjacent part.
he spatial criteria fo
penings in separate fire
ompartments is essentiall
he same as if they were
separate buildings.
Applicable here is site circulation issues to deal with on_ this
development.
he plans show that there is to be an elevated pedestrian]
alkway between the Commercial precinct and th
Residential precinct.
f the site is to be separate allotments we believe that
easements and agreements will need to be in place to allo
site circulation, easements of support of structures etc.
support of adjacent
hese sort of agreements}
sually require Council as
hird party to the agreements
o ensure their perpetuity.
The integrating of site circulation and vehicular movemen
etc. may impact upon the Councils deliberation over th
development they may insist on the development being o
lone parcel of land.
Rise in Storeys
Varies from building to}
building
‘The commercial precinct has a building with a rise in storeys|
he commercial precinc
lof three
ttract Type B fire resistan|
Construction.
Mark CATCHPOLE
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
20517 App P.pdf [As Published]Related documentApplication case desk ↗
About this file
- File size
- 9.0 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.