Council archive · source document
20517 App P.pdf [As Published] · 132007.1259
Catchpole Building Services:
compliance~assess~table~perigian
Buildings:-
Yes
The class 1a buildings on the allotment need to be at leas
1800 mm apart so as not to attract a fire resistance level]
(FRL) of the external walls.
efer clause C3.2 of th
CA. The building is Type Al
onstruction therefore all
external loadbearing walls}
re required to be fire rated
The class 3 buildings need to be at least six metres apart so
hat the openings in the external walls required to have a FR.
fare at least six metres apart.
(The class 7a carpark portions and the class 5/6 commercia
ortions are required to be fire rated when within six metre:
lof another building on the same allotment
f the site is amalgamated
hen the commercial precinc
eeds to be adequately fire|
separated from the othe
uildings on the sam
f the site is not amalgamated
hen each building requires
fire rated wall to be erected
pon the allotment boundary.
Boundaries:-
Yes
he issue of allotmen
oundaries needs to be
ddressed before the final
sign development can
ccur as it will affect the
llotment boundaries
he shape of the allotment boundaries needs to consider the§As the enclosed carpark o:
osition of each buildings openings in relation to thejthe commercial precinct
allotment boundary they face. eeds to empty west then th
Mark CATCHPOLE
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
20517 App P.pdf [As Published]Related documentApplication case desk ↗
About this file
- File size
- 9.0 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.