Council archive · source document
SUPERSEDED Decision Notice - Approved by Delegation of Authority MCU22 0058 · MCU22/0058
Officer: Georgina Schramm Direct Telephone: 07 53296569 Our Reference: MCU22/0058 Your Reference: n/a 21 September 2022 Forde Developments P/L C/- Pivotal Perspective Pty Ltd 95/3 Hilton Tce NOOSAVILLE QLD 4566 [email protected] Dear Sir/Madam, Decision Notice Planning Act 2016 I refer to your application and advise that on 14 September 2022, Council decided to approve the application, subject to conditions. Details of the decision are as follows: application details Application No: MCU22/0058 Street address: 6 Wyandra St Noosa Heads Qld 4567 Real property description: Lot 40 RP 139776 Planning Scheme: Noosa Plan 2020 (25 September 2020) Decision details Council decided to issue the following type of approval: Development Permit for Material Change of Use - Dual occupancy CURRENCY PERIOD of approval The currency period for this development approval is stated in the conditions below. assessment manager conditions PLANNING When Conditions must be Complied With Unless otherwise stated, all conditions of this Decision Notice must be complied with prior to the use commencing, and then compliance maintained at all times while the use continues. Development undertaken in accordance with this approval must generally comply with the approved plans of development. The approved plans are listed in the following table unless otherwise amended by these conditions. Plan No. Rev. Plan/Document Name Date 202217-DA1.03 D Proposed Site Plan prepared Blackwood Architecture & Design 18 August 2022 202217-DA2.01 E Ground Floor Plan prepared Blackwood Architecture & Design 6 September 2022 202217-DA2.02 D Level 1 Floor Plan prepared Blackwood Architecture & Design 18 August 2022 202217-DA2.03 D Roof Plan prepared Blackwood Architecture & Design 18 August 2022 202217-DA3.01 D North Elevation prepared Blackwood Architecture & Design 18 August 2022 202217-DA3.02 D East Elevation prepared Blackwood Architecture & Design 18 August 2022 202217-DA3.03 D South Elevation prepared Blackwood Architecture & Design 18 August 2022 202217-DA3.04 D West Elevation prepared Blackwood Architecture & Design 18 August 2022 202217-DA3.05 D Section A prepared Blackwood Architecture & Design 18 August 2022 202217-DA3.06 D Section B prepared Blackwood Architecture & Design 18 August 2022 202217-DA3.07 D Section C prepared Blackwood Architecture & Design 18 August 2022 202217-DA3.08 D Section D prepared Blackwood Architecture & Design 18 August 2022 Currency Period This development approval lapses if the use has not happened by 14 September 2028 unless an application to extend the currency period is approved by Council. Building Height The maximum height of the development must not exceed 8 metres above the finished ground level and the natural ground level. Certification must be submitted to Council from a Licensed Surveyor which certifies that the buildings do not exceed the maximum height requirement of this Decision Notice. Performance Bond Security in the form of a cash bond or trading bank guarantee to the sum of $10,000 must be submitted to Council, to secure performance of all conditions of this approval, prior to pre-start meeting. The cash bond or trading bank guarantee will be returned on performance of the conditions of approval less any costs incurred by Council in respect of enforcing performance of this permit. Council reserves the right to call upon the bond or guaranteed sum to effect compliance with conditions. Street Identification The street address of the development must be clearly visible and discernible from the primary frontage of the site by the provision of a street number and, where appropriate, the building name. Water & Sewer Connections An underground connection to reticulated water and sewerage must be provided to the development site in accordance with the standards and requirements of Northern SEQ Distributor–Retailer Authority (Unitywater). A Certificate of Completion from the Northern SEQ Distributor–Retailer Authority (Unitywater) must be submitted to Council that certifies an underground connection to reticulated water and sewerage has been provided to the development site. Building Appearance All air conditioning units or other mechanical equipment must be located at ground level, or otherwise fully enclosed or screened such that they are not visible from the street frontages nor adjoining properties. All deck and balcony areas above ground floor must not be enclosed by permanent fixtures such as shutters, louvres, glass panelling or the like. Clothes Drying Areas Each dwelling unit must be provided with access to an outdoor clothes line which is screened from public view. Protection of Privacy The upper level balcony located on the eastern building face (BAL 1) of Unit 2 must include either balcony planter boxes, balustrading or fixed external screens, positioned in such a way to obscure direct views into the habitable room windows or private open space areas of the adjoining property. Community Management Statement Any proposed Community Management Statement required for the development pursuant to the Body Corporate and Community Management Act 1997 must be submitted to Council for endorsement at the same time as submission of the Building Format Plan (or similar) to Council for compliance assessment. Landscaping Works The development site must be landscaped. The works must be undertaken in accordance with an Operational Works approval and the Noosa Plan and Planning Scheme Policy PSP2 - Landscaping for that specific area and must include in particular: the Landscaping Plans & Details shown on Sheets 1,2, 4 & 5, dated 27 June 2022, prepared by Element Design Landscape and Architecture, with the exception of: the following species requiring substitution with either species from the Noosa Plan – PSP2 - Landscaping preferred list or native endemic species to Noosa: Philodendron ‘xanadu’ – exotic Buckinghamia celsisima – not endemic Plumeria obtuse – exotic Lomandra fluviatilis – not endemic Nandina domestica – exotic Zamia furfuracea – exotic Bromeliard sp – exotic Liriope ‘Evergreen Giant’ – exotic Myoporum ellipticum – not endemic Provision of 1 x 45 litre pot size street tree within the road reserve for every 8 metres of road frontage. Inclusion of additional/substitution of species to ensure species planted within the landscaping strip along the Wyandra Street and Safari Street boundaries grow to a minimum 1.5m height at maturity and provide a dense vegetated screen. Inclusion of species along the two rear boundaries that will grow to a minimum 4m height at maturity. Revised plans are to be provided to show the design changes which is of impact to the areas of proposed landscaping i.e. landscaping within the garage setback of Unit 2. a 1.5 metre wide landscaping strip along the Wyandra Street and Safari Street road frontages of the subject site, exclusive of the access driveway, generally uncompromised by infrastructure items Exotic species may be planted around the pool area only but not exceed 25% of the landscaping. Exotic species must not be included as boundary screening plants or be visible from Wyandra Street and Safari Street. Boundaries must be screened with species selected from PSP2 – Landscaping or Noosa native species. The Operational Works application must include the Landscaping Plans & Details shown on Sheets 1,2, 4 & 5, dated 27 June 2022, prepared by Element Design Landscape and Architecture, with the required conditioned amendments included. All landscape works must be established and maintained in accordance with the approved design for the life of the development, and in a manner that ensures healthy, sustained and vigorous plant growth. All plant material must be allowed to grow to full form and be refurbished when its life expectancy is reached. All landscape works must be maintained generally in accordance with the approved design for the life of the development. Fencing, Walls and Screening Fencing must: Be located wholly within lot boundaries. Front fences are no more than 1.2 metres high or 1.8 metres if at least 50% transparent. Be setback with dense screening landscaping between boundary and fence. Site Access and Driveways A sealed access driveway must be provided from both Wyandra Street and Safari Street to all parking and manoeuvring areas of the development. The works must be undertaken in accordance with an Operational Works approval and must include in particular: driveway crossovers generally in accordance with RS-049, RS-050 and any associated addendum; driveway crossovers generally in accordance with drawing number C30, Rev A, prepared by RECOR Consulting dated 24 June 2022 and any associated addendum. Stormwater Drainage The site must be provided with a stormwater drainage system connecting to a lawful point of discharge. The works must be undertaken in accordance with an Operational Works approval and must include in particular: the works described in drawing number C30, Rev A, prepared by RECOR Consulting dated 24 June 2022 and any associated addendum. Services Unless otherwise stipulated by telecommunications legislation at the time of construction, the development must be provided with all necessary conduits, pits and pipes to accommodate the future connection of optic fibre technology telecommunications. Certification must be submitted to Council from all relevant service providers (Energex, NBN and Unitywater) which certifies that the development has met the requirements of this Decision Notice and all applicable legislation at the time of construction. Easements Unless otherwise agreed in writing by the relevant service provider, any public or third party infrastructure located on the subject site must be placed within an easement registered against the title of the property. All easements must be designed in accordance with the planning scheme and granted at no cost to the Grantee. Where the Grantee is Council or a service authority, the easement documentation must be in accordance with the Grantee’s standard easement terms. Draft easement documentation must be submitted to Council for endorsement. All works must be kept clear of any existing or proposed easements on the subject land, unless agreed otherwise in writing by the Grantee. Geotechnical Stability All works must be carried out in accordance with the recommendations contained in section 5 of the Slope Stability Assessment report prepared by SCG Consulting Engineers dated 27 July 2022. Pathways A minimum 1.8m pathway must be constructed along the Wyandra Street frontage. A minimum 1.5m pathway must be constructed along the Safari Street frontage. All pathways must be constructed in accordance with the following requirements: All footpath/cycleway must comply with Council’s Standard Drawing SEQ R-065. Provision must be made for disabled access at all kerb crossings associated with pathways, in accordance with Council's current standards. All paths must have a slip resistant surface. Expansion and contraction joints must provide a flush finish. Installation of joints by saw cutting is preferred to ensure a smooth ride for cyclists. The required work includes any modifications to ensure the footpath finishes flush with all existing service covers and the like, or alternatively these services are raised or altered, so as not to create a pedestrian safety hazard. Pathways must: terminate in a manner that ensures smooth transition to existing surfaces for public safety. be designed and constructed to comply with the Disability Discrimination Act (DDA), Access to Premises Standard, Austroads and relevant sections of AS1428 Design for access and mobility. Earthworks and Retaining Walls All fill and associated batters must be contained entirely within the subject site unless written permission from the respective landowner(s) is provided to Council. All earthworks must be undertaken in accordance with the provisions of Australian Standard AS3798: Guidelines on Earthworks for Commercial and Residential Developments. Damage to Services and Assets Any damage caused to existing services and assets as a result of the development works must be repaired at no cost to the asset owner at the following times: where the damage would cause a hazard to pedestrian or vehicle safety, immediately; or where otherwise, upon completion of the works associated with the development. Any repair work which proposes to alter the alignment or level of existing services and assets must first be referred to the relevant service authority for approval. referral agencies Not applicable. Advisory notes The following notes are included for guidance and information purposes only and do not form part of the assessment manager conditions: PLANNING Aboriginal Cultural Heritage Act 2003 There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain approvals pursuant to the Aboriginal Cultural Heritage Act 2003 (ACH Act). The ACH Act establishes a cultural heritage duty of care which provides that: “A person who carries out an activity must take all reasonable and practicable measures to ensure the activity does not harm Aboriginal cultural heritage”. It is an offence to fail to comply with the duty of care. Substantial monetary penalties may apply to individuals or corporations breaching this duty of care. Injunctions may also be issued by the Land and Resources Tribunal, and the Minister administering the ACH Act can also issue stop orders for an activity that is harming or is likely to harm Aboriginal cultural heritage or the cultural heritage value of Aboriginal cultural heritage. You should contact the Cultural Heritage Unit to discuss any obligations under the ACH Act. Equitable Access and Facilities The plans for the proposed building work have NOT been assessed for compliance with the requirements of the National Construction Code - Building Code of Australia (Volume 1) as they relate to people with disabilities. Your attention is also directed to the fact that in addition to the requirements of the National Construction Code as they relate to people with disabilities, one or more of the following may impact on the proposed building work: the Disability Discrimination Act 1992 (Commonwealth); the Anti-Discrimination Act 1991 (Queensland); and the Disability (Access to Premises – Buildings) Standards. Building and Construction Industry (Portable Long Service Leave) Levy The QLeave levy must be paid prior to the issue of a development permit where it is required. Council will not be able to issue a Decision Notice without receipt of details that the Levy has been paid. Qualified Person For the purpose of preparing a Landscape Plan, a qualified person is considered to be a landscape architect, landscape designer and/or horticulturist with a minimum of 3 years current experience in the field of landscape design. Co-ordination of Operational Works Assessment Additional application fees apply to Operational Work applications where the different aspects of the works are lodged separately. Significant savings in application fees will result if all works are lodged in a single application. Community Title Scheme - Private Infrastructure All private infrastructure for the development must be designed to meet the planning scheme requirements unless otherwise agreed by the relevant authority Infrastructure Charges All developments and/or changes to existing developments may require payment of “Infrastructure Charges” (as applicable) in accordance with Council’s “Charges Resolution” made pursuant to the planning legislation and regulations current at the time of issue. For further information, please refer to https://www.noosa.qld.gov.au/planning-development/development-tools-guidelines/infrastructure-charges property notes Not applicable. VARIATION approval details Not applicable. further development permits required Type of Development Permit Required Subject of the required Development Permit Development Permit for Operational Works Road work, Stormwater, Drainage work, Earthworks, Landscaping, Vegetation Clearing. Development Permit for Building Works All building work. submissions Not applicable. RIGHTS OF APPEAL You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the Planning Act 2016 is attached. During the appeal period, you as the applicant may suspend your appeal period and make written representations to Council about the conditions contained within the development approval. If Council agrees or agrees in part with the representations, a negotiated decision notice will be issued. Only one negotiated decision notice may be given. OTHER DETAILS If you wish to obtain more information about the decision, electronic copies are available on line at www.noosa.qld.gov.au or at Council Offices. Yours faithfully, Georgina Schramm Development Planner Enc: Appeal Rights Infrastructure Charge Notice Approved Plans/Documents Appeal Rights PLANNING ACT 2016 & PLANNING REGULATION 2017 Chapter 6 Dispute resolution Part 1 Appeal rights 229 Appeals to tribunal or P&E Court (1) Schedule 1 of the Planning Act 2016 states – (a) Matters that may be appealed to – (i) either a tribunal or the P&E Court; or (ii) only a tribunal; or (iii) only the P&E Court; and (b) The person- (i) who may appeal a matter (the appellant); and (ii) who is a respondent in an appeal of the matter; and (iii) who is a co-respondent in an appeal of the matter; and (iv) who may elect to be a co-respondent in an appeal of the matter. (2) An appellant may start an appeal within the appeal period. (3) The appeal period is – (a) for an appeal by a building advisory agency – 10 business days after a decision notice for the decision is given to the agency; or (b) for an appeal against a deemed refusal – at any time after the deemed refusal happens; or (c) for an appeal against a decision of the Minister, under chapter 7, part 4, to register premises or to renew the registration of premises – 20 business days after a notice us published under section 269(3)(a) or (4); or (d) for an appeal against an infrastructure charges notice – 20 business days after the infrastructure charges notice is given to the person; or (e) for an appeal about a deemed approval of a development application for which a decision notice has not been given – 30 business days after the applicant gives the deemed approval notice to the assessment manager; or (f) for any other appeal – 20 business days after a notice of the decision for the matter, including an enforcement notice, is given to the person. Note – See the P&E Court Act for the court’s power to extend the appeal period. (4) Each respondent and co-respondent for an appeal may be heard in the appeal. (5) If an appeal is only about a referral agency’s response, the assessment manager may apply to the tribunal or P&E Court to withdraw from the appeal. (6) To remove any doubt. It is declared that an appeal against an infrastructure charges notice must not be about- (a) the adopted charge itself; or (b) for a decision about an offset or refund- (i) the establishment cost of trunk infrastructure identified in a LGIP; or (ii) the cost of infrastructure decided using the method included in the local government’s charges resolution. 230 Notice of appeal (1) An appellant starts an appeal by lodging, with the registrar of the tribunal or P&E Court, a notice of appeal that- (a) is in the approved form; and (b) succinctly states the grounds of the appeal. (2) The notice of appeal must be accompanied by the required fee. (3) The appellant or, for an appeal to a tribunal, the registrar must, within the service period, give a copy of the notice of appeal to – (a) the respondent for the appeal; and (b) each co-respondent for the appeal; and (c) for an appeal about a development application under schedule 1, table 1, item 1 – each principal submitter for the development application; and (d) for and appeal about a change application under schedule 1, table 1, item 2 – each principal submitter for the change application; and (e) each person who may elect to become a co-respondent for the appeal, other than an eligible submitter who is not a principal submitter in an appeal under paragraph (c) or (d); and (f) for an appeal to the P&E Court – the chief executive; and (g) for an appeal to a tribunal under another Act – any other person who the registrar considers appropriate. (4) The service period is – (a) if a submitter or advice agency started the appeal in the P&E Court – 2 business days after the appeal has started; or (b) otherwise – 10 business days after the appeal is started. (5) A notice of appeal given to a person who may elect to be a co-respondent must state the effect of subsection (6). (6) A person elects to be a co-respondent by filing a notice of election, in the approved form, within 10 business days after the notice of appeal is given to the person. 231 Other appeals (1) Subject to this chapter, schedule 1 and the P&E Court Act, unless the Supreme Court decides a decision or other matter under this Act is affected by jurisdictional error, the decision or matter is non-appealable. (2) The Judicial Review Act 1991, part 5 applies to the decision or matter to the extent it is affected by jurisdictional error. (3) A person who, but for subsection (1) could have made an application under the Judicial Review Act 1991 in relation to the decision or matter, may apply under part 4 of that Act for a statement of reasons in relation to the decision or matter. (4) In this section – decision includes- (a) conduct engaged in for the purpose of making a decision; and (b) other conduct that relates to the making of a decision; and (c) the making of a decision or failure to make a decision; and (d) a purported decision; and (e) a deemed refusal. non-appealable, for a decision or matter, means the decision or matter- (a) is final and conclusive; and (b) may not be challenged, appealed against, reviewed, quashed, set aside or called into question in any other way under the Judicial Review Act 1991 or otherwise, whether by the Supreme Court, another court, a tribunal or another entity; and (c) is not subject to any declaratory, injunctive or other order of the Supreme Court, another court, a tribunal or another entity on any ground. 232 Rules of the P&E Court (1) A person who is appealing to the P&E Court must comply with the rules of the court that apply to the appeal. (2) However, the P&E Court may hear and decide an appeal even if the person has not complied with the rules of the P&E Court [word/footer1.xml] Page 2 of 9 [word/footer2.xml] PO Box 141 P. (07) 5329 6500 [email protected] TEWANTIN QLD 4565 F. (07) 5329 6501 www.noosa.qld.gov.au Page 1 of 9 [Attachment: image3.png (image text)] ee) NOOSA COUNCIL
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
SUPERSEDED Decision Notice - Approved by Delegation of Authority MCU22 0058Related documentApplication case desk ↗
About this file
- File size
- 334 KB (small file)
- File type
- DOCX
No other editions are linked here.