Skip to the record
Every meeting, every word.

Council archive · source document

Council Decision - Changes - old apps - 005.1985.00003785.004 [As Published] · 51985.3785.04

of 1

Text shows just the words. Original shows the document exactly as it was published.

                                               Officer:          Marcus Brennan
                                               Direct Telephone: (07) 5449 5225
                                               Response Address: Locked Bag 72
                                                                 Sunshine Coast Mail Centre QLD 4560
                                               Email:            [email protected]
                                               Our Reference:    1985/3785 – TPC1724 (TC14896)
                                               Your Reference:   01239 L02 NG


6 September 2010

Quamby Resort Management Pty Ltd
CARE Martoo Consulting Pty Ltd
PO Box 1684
NOOSA HEADS QLD 4567



Dear Sir / Madam
Re:    Application for a Change to a Development Approval – Extension and Alterations to
       Manager’s Residence situated at 4 Quamby Place NOOSA HEADS described as
       Lot 0 BUP: 9869,

I refer to your request to make a change to the above development approval. On 2 September 2010
Council decided to approve the change, subject to the following conditions:

1.     Development undertaken in accordance with this approval must generally comply with the
       approved plans of development. The approved plans are listed in the following table below:-

        Plan No.               Rev      Plan / Prepared by                                  Date
        Project No.1001        P1       Site/ Roof Plan prepared by Mojo Design             January 2010
        WD.102                          Building Design
        Project No. 1001       P1       Ground Level Floor Plan -Proposed prepared          January 2010
        WD.201                          by Mojo Design Building Design
        Project No.1001        P1       Elevations – Proposed Sheet 1 prepared by           January 2010
        WD.503                          Mojo Design Building Design
        Project No.1001        P1       Elevations – Proposed Sheet 2 prepared by           January 2010
        WD.504                          Mojo Design Building Design

2.     Construction works undertaken in the vicinity of Unitywater water supply or sewerage
       infrastructure must not adversely affect the integrity of the infrastructure. All costs associated
       with repair, replacement or alteration of infrastructure must be met by the applicant.

You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the
Sustainable Planning Act 2009 is also attached.

Should you wish to obtain more information about Council’s decision electronic copies are available on
line at www.sunshinecoast.qld.gov.au, or at Council Offices.

Yours faithfully,




Denis Wallace
Senior Development Planner

Used in these records

About this file

File size
8 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Council Decision - Changes - old apps - 005.1985.00003785.004 [As Published].pdf · 8 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.