Council archive · source document
20230186 - 25-27 Toolar St, Tewantin - BA Document Set_reduced file · MCU21/0083.01
Original PDF page 6, section 1. The text section number identifies this passage in the reader.
FAS
10122/18
1:100, 1:2.60, 1:2.63 @ A1
1 3 5 7 9 11
1,520 7,650 7,650 6,594 7,650 7,650
SP
H 1,520
13/4/2023
CH-2400 CH-2400 CH-2400 CH-2400
FLUSH FC FLUSH FC FLUSH FC FLUSH FC
A A
CH-2100 CH-2100 CH-2100 CH-2100
BH PLBD PLBD BH BH PLBD PLBD BH
CH-2400 CH-2400 CH-2400 CH-2400
PLBD PLBD PLBD PLBD
CH-2400 CH-2400 CH-2400 CH-2400
PLBD PLBD PLBD PLBD
7,620
7,620
TUNDISH TO TUNDISH TO TUNDISH TO TUNDISH TO
LT LT LT LT
BH PLBD PLBD BH BH PLBD PLBD BH
AC AC AC AC
CH-2100 CH-2100 CH-2100 CH-2100
VOID CH-2100 CH-2100
VOID VOID CH-2100 CH-2100
VOID
BH PLBD
BH PLBD
BH PLBD
BH PLBD
PLBD PLBD PLBD PLBD
CH-2250 CH-2250 CH-2250 CH-2250
BH PLBD
BH PLBD
BH PLBD
BH PLBD
VB VB VB VB
LT LT LT LT
D.P D.P D.P D.P D.P D.P D.P D.P
B B
AC CONDENSER WALL MOUNT AC CONDENSER WALL MOUNT AC CONDENSER WALL MOUNT AC CONDENSER WALL MOUNT
BRACKETS @ HIGH LEVEL BRACKETS @ HIGH LEVEL BRACKETS @ HIGH LEVEL BRACKETS @ HIGH LEVEL
RAKING SOFFIT RAKING SOFFIT RAKING SOFFIT RAKING SOFFIT
ZACB ZACB ZACB ZACB
JAMESON / STIRLING
D.P D.P D.P D.P
PROPOSED TOWNHOUSES
25-27 TOOLAR STREET, TEWANTIN
21,351
21,351
D.P D.P
RAKING SOFFIT RAKING SOFFIT RAKING SOFFIT RAKING SOFFIT
ZACB ZACB ZACB ZACB
RAKING SOFFIT RAKING SOFFIT RAKING SOFFIT RAKING SOFFIT
ZACB ZACB ZACB ZACB
AC CONDENSER WALL MOUNT AC CONDENSER WALL MOUNT
BRACKETS @ HIGH LEVEL BRACKETS @ HIGH LEVEL
C C
CH-2100
CH-2100
CH-2100 CH-2100
PLBD BH
PLBD BH
CH-2250 CH-2250
VB VB
CH-2500 CH-2500
AC PLBD PLBD AC
VOID CH-2250 CH-2250
VOID
OVER PLBD PLBD OVER
TUNDISH TO TUNDISH TO
STACK STACK
CH-2250 CH-2250
PLBD BH BH PLBD
PLBD BH
PLBD BH
PLBD PLBD
8,750
8,750
CH-2250 CH-2250
PLBD BH
PLBD BH
PLBD BH CH-2250 CH-2250 BH PLBD
VB PLBD PLBD VB
CH-2500 CH-2500
PLBD PLBD
PLBD BH
PLBD BH
CH-2400 CH-2400 CH-2400 CH-2400
PLBD BH BH PLBD
CH-2100
CH-2100
PLBD PLBD PLBD PLBD
AC AC
CH-2500 CH-2500
PLBD PLBD
D.P D.P
D D
1,000
1,000
E D.P FOR GF UNIT FOR GF UNIT D.P
E
AC CONDENSER WALL MOUNT AC CONDENSER WALL MOUNT
BRACKETS @ HIGH LEVEL BRACKETS @ HIGH LEVEL
TUNDISH TO EXTERIOR TUNDISH TO EXTERIOR
D.P D.P
4,500
D.P D.P
DRAWING TITLE
1,520 1,667 8,470 8,470 8,470 8,470 3,167
37,194
GROUND FLOOR RCP
2 4 6 8 10
PROPOSED TOWNHOUSES
ISSUE
VB
BH
PLBD
ZACB
N
DRAWING NO.
CH-XXXX
/Volumes/RSA-Storage/ARCHICAD/RSA PROJECTS/ACTIVE 2022/10122:18 SQUIRES, 25&27 TOOLAR STREET, TEWANTIN/ArchiCAD Files/03 BA APPLICATION/221130 BA (BLOCKWORK).pln
Do not scale this drawing
BULKHEAD
BUILDING APPROVAL
LEGEND - RCP PLANS
BA-2014-C
ZINCALUME COLORBOND
CEILING HEIGHT NOMINATED
FLUSH PLASTERBOARD 10mm
VILLABOARD 6mm FLUSH FINISH
4:40 pm PLOTTED 13/4/2023
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
20230186 - 25-27 Toolar St, Tewantin - BA Document Set_reduced file.pdfRelated documentApplication case desk ↗
About this file
- File size
- 8.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.