Council archive · source document
20230186 - 25-27 Toolar St, Tewantin - BA Document Set_reduced file · MCU21/0083.01
Original PDF page 22, section 2. The text section number identifies this passage in the reader.
14
SM S DB DGPO
SM SM
15
DGPO SM S
FW EF
LED MR 300 SM SM
SM WB
DB DGPO
DGPO
1500
WM/
EF DRYER
DGPO
SM
300
SM
SM
DGPO
1500
WM/ S AC FCU
DGPO
300
DRYER
DGPO
300
DGPO DGPO
300 300
SM
AC FCU
DGPO
SM SM
300
DGPO DGPO
300 300
SM SM
SM
DGPO
300
SM S
DGPO
300
DGPO
300
300
WB D (EXT)
HWS
DGPO
300
AC CONDENSER
D (EXT)
PERM CONNECTION HWS
FOR AC CONDENSER
WB
WB
P1
WB
GROUND FLOOR PLAN FIRST FLOOR PLAN
BLOCK C UNIT 6 (UNIT 7 MIRRORED) BLOCK C UNIT 9 (UNIT 10 MIRRORED)
DRAWING TITLE ISSUE
1:100, 1:125 @ A1 13/4/2023
PROPOSED TOWNHOUSES ELECTRICAL PLANS BUILDING APPROVAL
FAS SP 25-27 TOOLAR STREET, TEWANTIN UNIT ELECTRICAL PLANS - GROUND & FIRST FLOOR Do not scale this drawing
C 13/04/23 LIGHT FIXTURES CHANGED TO SURFACE MOUNTED, AC CONDENSERS, HWS LOCATIONS CHANGED
10122/18
JAMESON / STIRLING DRAWING NO. 9011-C
/Volumes/RSA-Storage/ARCHICAD/RSA PROJECTS/ACTIVE 2022/10122:18 SQUIRES, 25&27 TOOLAR STREET, TEWANTIN/ArchiCAD Files/03 BA APPLICATION/221130 BA (BLOCKWORK).pln 4:41 pm PLOTTED 13/4/2023
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
20230186 - 25-27 Toolar St, Tewantin - BA Document Set_reduced file.pdfRelated documentApplication case desk ↗
About this file
- File size
- 8.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.