Skip to the record
The only place to find full transcripts.

Council archive · source document

00156B56.001

of 79

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (12.1 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Text sections not matched to the original PDF pages. See original document to check page numbers.

‘          INTEGRATED PLANNING ACT 1997                                                                                IDAS Assessment Checklist, Version 20, 2 April 2007
           Operational work that is tidal work or    |9,  The application involves operational work that is: ( tick the applicable box/es)
           work in Coastal management district            (J (i)   tidal work" as defined under the Coastal Protection and Management Act 1995 (the
           For more information refer to Guide 18. For                                ,             .     .                                   :
           more information about prescribed fidal wor in          Coastal Act) that is not prescribed tidal work - complete Part M of Form 1; of
          local goverment tidal areas refer to Guide 24.  [-] (ii) tidal work that is prescribed tidal work" other than in a canal'? -complete Part P of Form 1; or
          . Unless you answered ‘none of the above’ to Q9,     sss     .         ag                                 sed
          “the appication requires assessment by the      LJ (iii) carried out within a coastal management district under the Coastal Act and for - complete
          : Environmental Protection Agency (EPA).                 Part M of Form 1 if any box/es (a) to (i) below are ticked.
           if an agency other than EPA is the assessment           (J (a)    constructing or installing works in a watercourse between MHWS and HAT (ie.                      ;
           manages for the application, EPA isa                              other than those works in tidal water) where the development has been determined not
           concurrence agency for the application in       .                                        ;                                                                   '
           relation to this matter.     .                                    to be assessable against the Water Act 2000 ;
          _ Local govemment is the assessment manager              (-] (b)   constructing a canal’2 intended to be connected to tidal waters:
           for all prescribed tidal work.                                              .         oe
                                                                   [](c}     constructing an artificial waterway;
                                                                   (J (d)_   reclaiming land under tidal water:
                                                                   {[](e)    disposing of dredge spoil or other solid waste material in tidal water;
                                                                   (C) (f)   interfering with quarry material on State coastal land above high-water mark:
                                                                   [] (g)    draining or allowing drainage or flow of water or other matter across State
                                                                             coastal land above high-water mark;
                                                                   (_] (h)   removing or interfering with coastal dunes on land, other than State coastal land,
                                                                             that is in an erosion prone area and above high-water mark;
                                                                   (J (i)    constructing a bank or bund wall to establish a ponded pasture on land, other
    @ !                                                                      than State coastal land, above high-water mark; or
                                                          Dd (iv) mone ofthe above                                                      a
           Operational work below high water       | 10.   The application involves operational work that is: (tick the applicable box/es)
           mark                                                     ge        13                                          .
          ‘For more information refer to Guide 18. For     (] {i} tidal work'3   as defined under the Coastal Protection and Management Act 1995 (the
          j more information about prescribed tidal work in        Coastal Act} that is not prescribed tidal work - complete Part M of Form 1; or
          , focal gavemment bdal Tee he, Guide 24.         (1 (ii) tidal work that is prescribed tidal work’ - complete Part P of Form 1; OF
          . Unless you answered “none of the above” to         we      .         taps                             sa
           O10, the application triggers referrat to       (] (iii) carried out within a coastal management district'5 under the Coastal Act and for -
          1 Queensland Transport (QT) (Maritime Safety                        :     i                  ;              i               ial in ti         _
          - Qld) as a concurenca agency,                           [1] (a)   disposing of dredge spoil or other solid waste material in tidal water - complete Part
          ‘                                                                  M of Form 1;
          . Local government is the assessment manager                            _.                  ;
           for all prescribed tidal work.                          (_] (b)   reclaiming land under tidal water - complete Part M of Form 1; or
                                                                   {](c)     constructing a canal", if the canal is associated with reconfiguring a lot - complete
                                                                             Part M of Form 1:
                                                           Kl {iv)_  none of the above.
           Coastal management                        11.   The application involves: (tick the applicable box/es)
          "For more information refer to Guide 18.         (XJ (i)   a material change of use assessable under a planning scheme involving operational
          : Unless you answered "none of the above" to               work carried out completely or partly in a coastal management district’®
          ‘ Q11, the application requires assessment by the     .             ;                                                .             .      .          oe
   @       Environmental Protection Agency (EPA).          (J (ii)   a material change of use assessable under a planning scheme involving building
           Ifan agency other than EPA is the assessment              work, carried out completely or partly in a coastal management district that is -
          :                 fication, EPA i                                          .                  .     .
           Fe eae           forte apptaten in                        + the construction of a new premises with a GFA" of at least 1000m?
          : relation to this matter.                                 « the enlargement of the GFA of existing premises by more than 1000m?
                                                           [| (ili)  reconfiguring a lot assessable under schedule 8 of the IPA where the land is situated
                                                                     completely or partly in a coastal management district
                                                           (J (iv)   reconfiguring a lot? assessable under schedule 8 of the 1PA and in connection with
                                                                     the construction of a canal’? - complete Part M of Form 1
                                                           LJ (v)    none of the above      —                                     7

          10 Tidal work is defined in sch 10 of the IPA.
          11 Prescribed tidal work is defined in the Coastal Protection and Management Regulation 2003 and includes certain tidal works completely or partly within a local government tidal area,
          12 Canal means canal as defined under the Coastal Protection and Management Act 1995
          13 Tidal work is defined In sch 10 of the IPA.
          14 Prescribed tidal work is defined in the Coastal Protection and Management Regulation 2003 and includes certain tidal works completely or partly within a local government tidal area.
          15 Coastal management district is defined in sch 10 of the IPA and means a coastal management district under the Coastal Protection and Management Act 1995, other than an area declared as a
             coastal management district under section 47(2) of that Act.
          16 GFA Is defined in sch 44 of the IPA to mean the gross floor area. For a definition of how to calculated GFA, go to the planning scheme against which the application is being assessed.
          17 Under $117 of the Coastal Protection and Management Act 1995, an application far reconfiguration, where the reconfiguration is associated with the construction of an artificial waterway, must be
       '     accompanied by the application for the operational works to construct the artificial waterway.
                                                                                           Page 4

Used in these records

About this file

File size
12.1 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

00156B56.001.pdf · 12.1 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.