Skip to the record
Accept no substitutions.

Council archive · source document

00156B56.001

of 79

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (12.1 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Text sections not matched to the original PDF pages. See original document to check page numbers.

.         INTEGRATED PLANNING ACT 1997                                                                             IDAS Assessment Checklist, Version 20, 2 April 2007
          Environmentally relevant activities     | 20.  Does the application involve an ERA?
          Most    applications for an ERA in a HPA will not
          be s Oe ed Applications which may be made      CT] NO                 CT] YES (ensure you have completed Part G of Form?)
          require referral to the EPA. The assessment of
          some ERAs Is assessed by NRW, othershave | 21, |s the application for an ERA 20 instream?
          been devolved to DPIF, NRW or delegated
          local govemment (see EPA website for more     C} NO                  C) YES
          information on devolved ERAs)
          eats Os 21 NO to G20 you donotneedto | 22,     Is a quarry allocation notice held for the proposed ERA 20 instream?
           Ht you answered YES to Q20 and the            LINo                   _] Yes
          development is in a PA, your application must be
         assessed by the administering authority?"                      +   eatin 7                       ami          9
          against he Wid Rivers Code and must comply 23. Does the application involve any of the following in a HPA?
          with the code, untess the proposal is far      i) a level 2 ERA 11, (and is for specified works or a residential complex)
          development where an application will nat be  ve                     .
          accepted, or is exempt fram wild river         ii) an ERA 19 (dredging)
         “clemine fan epplction wil not be accepted      iii) Low impact ERA 20 (out of stream) for specified works or a residential complex (as defined in
          "for the development by answering Q21 - 024.         the Wild Rivers Act 2005, and Environmental Protection Act 1994)
          {fyou answered No to Q21, you ge not need to   iv) an ERA 22 (out of stream)
          comp        .  you answe:           you                                                                                      .
           are required to completa Q22.                 [J No                  [_] Yes
           ff you answered NO to Q22, the application wil
           not be accepted. If you answered YES to Q22, |94 Is the proposed  develoomen       RA 2          f  str      nd:
          the application must be    by NRW                  ep oe        c ‘elopment for ERA      20 (out of stream) and;
           against the Wild Rivers Code and must comply  -   ina       , an
   @      with the code.                                 —   not low impact; and
           ff you answered N       d        i                             cpg               .                        .
          is proposed EO HPA the epplcnton wil ote       ~   Not for a residential complex in the area, or for specified works.
          "accepted. If you answered YES to Q23, the
          ‘ application must be assessed by the EPA or   O NO                  Cl YES
          ‘ NRW (as prescribed in schedule 8A of the IPA)
           against the Wild Rivers Code and must comply
          with the code.
          : you answered YES to Q24 the application will
          - Not be accepted. if you answered NO to Q24,
          your application must be assessed by NRW
          . against the Wild Rivers Code and must comply
          with the code.                                                                                                                                       .
           Exempt ERAs in a designated urban
          ‘area
           If the development is proposed in a designated
           urban area there may ba no wild river
           requirements. See Section 2 02.
          ‘ Note: All applications that can be accepted must
           be assessed against and must comply with the
          Wild Rivers Code (other than exempt ERAs in a
          _ designated urban area).                      _                        Oo                               7
           Documentation                 -          25.  Has documentation been included with the application describing how the applicant proposes to
   @      ny bo sabjoet to an hforncton eveat and        comply with the mandatory requirements, required outcomes, and/ or performance requirements
           processing of the application may be delayed. as set out in the relevant part/s of the Wild Rivers Code?
                                                      Uno...                    SEDs

                      * The administering authority may be either the EPA, or if devolved or delegated, the local govemment, OPIF or NRW.
                                                                                      * Page 14

Used in these records

About this file

File size
12.1 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

00156B56.001.pdf · 12.1 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.